煤改气LNG气化站工程可行性报告
XX市XXX乡“煤改气”LNG气化站
工程可行性报告书
前言............................................................................................5
1总论.........................................................................................7
1.1工程名称........................................................................7
1.2编制依据........................................................................7
1.3编制原则........................................................................7
1.4工程建设背景................................................................8
1.5工程建设的必要性........................................................9
1.6编制遵循的主要规范、规定及规范............................10
2市场预测................................................................................12
2.1供气现状........................................................................12
2.2燃气现状存在问题........................................................12
2.3天然气需求预测............................................................12
2.4产品价格预测................................................................12
2.5市场风险........................................................................12
3LNG气化站及出站管道工艺设计.........................................143.1工艺技术方案........................................................................13
3.1.1工艺流程...............................................................13
3.1.2主要设备选型.......................................................13
3.2管道选择计算及设备管道布置...................................16
3.2.1概述....................................................................16
3.2.2设计规定.............................................................16
3.2.3装置布置的一般要求.........................................16
3.2.4通道及道路.........................................................17
3.2.5道路布置原则.....................................................17
3.2.6道路布置说明.....................................................17
3.2.7低温管道设计.....................................................17
3.3LNG气化站图片..........................................................19
3.4出站后工艺管道............................................................20
4消防设计专篇.......................................................................27
4.1设计依据........................................................................5
4.2工程概述........................................................................5
4.3危险性分析....................................................................5
4.4工艺设备防火分析........................................................9
4.5消防设计........................................................................5
4.6电气防火设计................................................................9
4.6.1供电系统设计.....................................................16
4.6.2危险环境内电气及仪表设备的选择.................16
4.6.3场站内线缆及其敷设方式的选择.....................17
4.6.4防雷及接地装置的设计.....................................17
4.7自控仪表........................................................................5
4.8通风................................................................................5
4.9控制系统设计................................................................5
4.10扑灭火灾对策...............................................................5
4.11安全保证........................................................................5
4.12防火经管.........................................................................5
4.13结论................................................................................5
5环境保护专篇.......................................................................415.1编制依据........................................................................5
5.2工程简况........................................................................5
5.3主要污染物分析.............................................................5
5.3.1运行过程主要污染物分析.................................16
5.3.2施工过程主要污染物分析.................................16
5.4主要防范措施.................................................................9
5.4.1生产过程防范措施................................................5
5.4.2施工过程防范措施................................................9
5.5绿化设计.......................................................................9
6劳动卫生专篇.......................................................................44
6.1设计依据........................................................................5
6.2工程简况........................................................................5
6.3主要危害因素分析.........................................................5
6.4安全防范措施.................................................................5
6.5劳动卫生投资.................................................................5
6.6预期效果及评价.............................................................5
7节能篇..................................................................................487.1编制依据........................................................................5
7.2工程简况........................................................................5
7.3能耗分析........................................................................5
7.4节能措施........................................................................5
8劳动定员..............................................................................49
8.1生产班制及人力资源配置.............................................5
8.2人员培训.........................................................................5
9工程建设实施计划...............................................................509.1建设工期...............................................................................5
9.2工程实施原则.................................................................5
9.3实施计划.........................................................................5
10主要设备投资.....................................................................5110.1工程实施进度.....................................................................5
10.2设备呢投资...................................................................5
11结论和建议.........................................................................5211.1结论.....................................................................................5
11.2建议...............................................................................5
附件:
总平面布置图等
前言
随着国民经济的不断发展,人们生活水平的不断提高,人们不在仅仅关注个人收入水平高低,物质生活是否富裕,人们对生存环境提出了更高要求,雾霾肆虐,无论是城镇还是乡村,人们对环境的要求是一致的。
发展经济的同时兼顾环境保护和治理,这是可持续发展的关键。
大气环境污染的源头不仅来自城市,同时也来自乡村。
其中农村散煤及农作物秸秆的不充分燃烧所产生的颗粒污染物是雾霾形成的关键因素之一,乡镇的工业企业生产用煤同样是形成雾霾的关键因素。
只有通过全局整体治理,才能改善大气环境。
随着全国城市环境保护压力的不断提高,全国各地的煤改气工程呈现出井喷式发展的趋势。
然而一些地区燃气管网尚未到达,气源成了煤改气发展的制约因素,但是煤改气的大环境不会停滞,寻求合理的替代气源就成了发展煤改气的关键。
LNG是目前应用最为广泛的替代气源以LNG为气源的场站规范称之为LNG气化站。
XXX公司为响应国家及当地政府的号召,结合企业自身的LNG运输优势,准备为XXX县XXXX乡的村村通燃气工程贡献自己的一一份力量。
特委托XXXXXX工程设计有限公司进行《XXXX乡村村通燃气工程可行性研究报告》的编制工作。
我公司接到委托后立即组织工程成员进行资料收集,听取有关部门技术人员的建议和要求,以便使我们的可行性研究报告成果能更加符合当地的实际情况和发展规划要求,在编制过程中我们得到了各地人民政府的大力支持与帮助,在此表示衷心的感谢!
1总论
1.1工程名称
项目名称:
XXX村村通煤气工程
工程建设单位:
XXX燃气公司
工程设计单位:
河北鼎嘉工程设计有限公司
1.2编制依据
(1)建设工程合同
(2)建设单位提供的有关设计资料
(3)现行国家规范规范
1.3编制原则
(1)在城市总体规划的指导下,结合当地燃气事业的发展,统筹兼顾,合理安排。
(2)贯彻节能方针,本着投资少、产出多、见效快、效益高的方针,合理利用天然气资源,开拓应用天然气的新途径。
(3)努力做到市场需求预测准确、工程规模确定、工艺流程确定和经济效益分析等均进行详细论证、确保研究结论的科学、先进性和经济行。
(4)贯彻燃气为人民生活服务,为各行各业不服务的方针,确定合理的供气比例及燃气价格。
(5)工程设计应严格执行国家有关安全、卫生及环境保护的有关政策、法规及规范规范。
(6)坚持科学态度,积极采用新工艺、新技术、新材料、新设备,既要体现技术先进、经济合理又要安全可靠。
(7)将社会效益、环境效益和综合经济效益放在首位,遵循“以社会、环保、经济效益为中心,以设备质量为重点”的原则,使工程安全经济地运行。
1.4工程建设背景
天然气行业属于国家产业政策鼓励的行业,受到多因素驱动快速发展。
XXXX燃气公司的业务为城镇天然气销售配送、燃气接驳、燃气具销售及维修等,属于燃气行业,该主营业务符合国家“十三五”规划,是国家产业政策重点支持发展方向。
2014年11月19日,国务院办公厅发布《能源发展战略行动计划(2014--2020年)》,计划提出要大力发展天然气,提高天然气消费比重,到2020年,天然气在一次能源消费中的比重提高到10%以上;到2020年,城镇居民基本用上天然气。
《能源发展战略行动计划》将天然气能源发展上升为国家战略。
其次随着我国城镇化的深入发展,城镇人口规模不断扩大,对天然气的需求也将日益增加。
2016年11月,国务院印发了《“十三五”生态环境保护规划》提出要显著削减京津冀及周边地区颗粒物浓度,重点城市实施天然气替代煤炭工程,推进电力替代煤炭,大幅减少冬季散煤使用量,“十三五”期间,北京、天津、河北、山东、河南五省(市)煤炭消费总量下降10%左右。
河北省出台“禁煤区”政策及推进“煤改气”配套工程河北省“十三五”规划建议中指出强化燃煤治理,强力推行集中供热和清洁能源供热,加强煤炭清洁高效利用,推进农村清洁能源开发利用工程。
《河北省大气污染防治强化措施技术方案(2016-2017年)》提出,到2017年,全省PM2.5年均浓度67微克/立方M,较2015年下降13%。
2017年11月起,禁止使用燃料煤炭,严禁新建以石油焦为燃料的发电工程,全省区域不准销售质量不达标的燃料煤炭。
同时,河北支持鼓励其他地区通过改气、改电、改地热等方式替代散煤使用。
目前已有北京、天津、河北、山东、河南、山西、上海、江苏、浙江等十多个省市出台了支持天然气替代散煤的相关政策。
河北省农村“煤改气”相关补贴(省略....可查政策文件)
1.5工程建设的必要性
XXX乡地处XX县城南XXX公里,,北依XX乡,西邻XX乡,东接XX镇,南邻XX乡,村庄土地互有交错,东明黄河大桥连接豫鲁两省,是XX县XXX市的南大门。
全乡辖区面积XX平方公里,下辖XX个行政村,本次村村通燃气工程涉及XX个村,共计2000户。
按照每户年平均用煤量2吨计算。
煤改气工程全部完工后将减少燃煤量4000吨。
据统计燃烧一吨煤,可产生2.6吨二氧化碳、二氧化硫0.024吨、氮氧化合物0.007吨,燃烧4000吨燃煤总排放污染物为二氧化碳10400吨、二氧化硫96吨、氮氧化物28吨。
天然气燃烧产物主要为二氧化碳和水,每立方天然气燃烧大约产生二氧化碳0.0015吨,一吨煤大约折合天然气600立方M左右,二氧化碳量为0.9吨,顾二氧化碳总排放量减少6800吨。
同时燃煤时还有大量的烟气和粉尘产生,而燃烧天然气避免了这类污染物的排放,由此可见煤改气对大气环境的改善是及其显著的。
改善大气环境,“煤改气”工程势在必行。
1.6编制遵循的主要规范、规定及规范
本工程统一执行现行的国家和行业有关规范和规范,除非另有规定,执行的规范和规范应为最新版,参照执行国际上的规范,所应用的法律、法规、规范与规范有以下的优先执行中国的法律、法规与规范;本工程统一执行现行的国家和行业有关规范和规范如下:
一、总图
《城镇燃气技术规范》GB50494-2009
《城镇燃气设计规范》GB50028-2006
《建筑设计防火规范》GB50016-2014
二、工艺
《城镇燃气技术规范》GB50494-2009
《城镇燃气设计规范》GB50028-2006
《建筑设计防火规范》GB50016-2014
《液化天然气的一般特性》GB/T19204-2003
《低温绝热压力容器》GB18442-2001
《工业金属管道设计规范》GB50136-2000
《工业金属管道工程施工规范》GB50235-2010
《输送流体用无缝钢管》GB/T8163-2008
《流体输送用不锈钢无缝钢管》GB/T14976-2012
《固定式压力容器安全技术检查规程》
TSGR004-2009
《承压设备无损检测》NB/T47013.1-47013.3-2015
三、土建
《建筑设计防火规范》GB50016-2014
《建筑抗震设计规范》GB50011-2011
《建筑地面设计规范》GB20037-2013
《建筑地基基础设计规范》GB50007-2011
《混凝土结构设计规范》GB50010-2010
《砌体结构设计规范》GB50003-2011
《建筑结构荷载规范》GB50009-2012
四、电气
《供配电系统设计规范》GB50052-2009
《低压配电设计规范》GB50054-2011
《石油化工控制室设计规定》SH/T3006-2012
《建筑物防雷设计规范》GB50057-2010
五、自控仪表
《石油化工企业可燃气体和有毒气体检测报警设计规范》GB50493-2009
《自动化仪表选型设计规定》HG/T20507-2014
《电力工程电缆设计规范》GB50217-2007
《通用用电设备配电设计规范》GB50055-2011
《爆炸危险环境电力装置设计规范》GB50058-2014
六、消防
《建筑设计防火规范》GB50016-2014
《城镇燃气设计规范》GB50028-2006
《建筑灭火器配置设计规范》GB50140-2005
七、劳动安全与工业卫生
《工业企业厂界环境噪声排放规范》GB12348-2008
《固定式压力容器安全技术监察规程》TSGR0004
《特种设备安全监察条例》国务院令第373号
八、环保
《大气污染物综合排放规范》GB11/501-2007
《社会生活环境噪声排放规范》GB12349-2008
2市场预测分析
2.1供气现状
目前XXX乡居民及工业、企业燃料结构仍以煤炭和液化石油气为主,尚无管道天然气,改善能源结构治理大气污染已成为发展的重要内容和基本方针。
因此,XX县正积极寻求利用清洁高效的天然气作为替代能源及过度能源。
由此