码头及堆场施工组织设计.doc

上传人:b****9 文档编号:91301 上传时间:2022-10-02 格式:DOC 页数:213 大小:12.97MB
下载 相关 举报
码头及堆场施工组织设计.doc_第1页
第1页 / 共213页
码头及堆场施工组织设计.doc_第2页
第2页 / 共213页
码头及堆场施工组织设计.doc_第3页
第3页 / 共213页
码头及堆场施工组织设计.doc_第4页
第4页 / 共213页
码头及堆场施工组织设计.doc_第5页
第5页 / 共213页
点击查看更多>>
下载资源
资源描述

码头及堆场施工组织设计.doc

《码头及堆场施工组织设计.doc》由会员分享,可在线阅读,更多相关《码头及堆场施工组织设计.doc(213页珍藏版)》请在冰豆网上搜索。

码头及堆场施工组织设计.doc

苏州港常熟港区金泾塘作业区大新华通用件杂码头工程施工组织设计

施工组织设计

工程名称:

苏州港常熟港区金泾塘作业区大新华通用件杂码头工程

审批单位:

中交第二航务工程局编制单位:

中交第二航务工程局有限公司

第四工程有限公司常熟港区金泾塘区大新华码头

工程项目经理部

技术负责人:

技术负责人:

审批者:

编制者:

审批日期:

编制日期:

二〇一二年四月

目录

第一章编制及施工依据···········································4

第二章工程概况··················································5

2.1工程概述······················································5

2.2自然条件······················································8

2.3现场条件······················································14

2.4主要工程量····················································14

第三章项目管理目标、方针、指标 ·······························17

3.1工期目标······················································17

3.2质量目标······················································18

3.3质量指标······················································18

3.4安全目标······················································18

3.5文明施工目标··················································18

3.6管理方针······················································19

第四章施工总体部署··············································20

4.1施工总平面布置及临时设施······································20

4.2资源配置及进度计划············································23

4.2.1组织机构图··················································23

4.2.2管理体系布置················································24

4.2.3智能分配及职责··············································24

4.2.4各类人员配备表··············································32

4.2.5主要船机设备配备及需求计划··································33

4.2.6主要材料使用及供应计划······································35

4.2.7施工总体计划和关键节点计划··································36

第五章主要工程项目施工工艺和方法·····························37

5.1施工方法的一般描述············································37

5.2各分项工程的施工工序及衔接····································40

5.3关键工序、特殊工序和施工控制··································41

5.4试桩··························································61

5.5码头平台部分施工··············································62

5.6引桥部分施工··················································75

5.7水上变电所施工················································78

5.8陆域堆场道路施工··············································81

5.9穿堤建筑物施工···············································152

5.10水下挖泥施工·················································161

5.11附属工程施工·················································163

第六章工程测量布控方案········································166

6.1概述·························································166

6.2施工测量坐标系统·············································166

6.3控制网的复测与建立···········································166

6.4施工测量放样·················································167

6.5沉降、位移变形观测···········································170

6.6竣工测量·····················································170

第七章施工质量控制·············································171

7.1单位、分部、分项工程划分······································171

7.2材料进场验收·················································171

7.3单位、分部、分项工程验收······································173

7.4不合格品、不符合项控制········································174

第八章质量保证体系、质量保证措施····························177

8.1质量保证体系·················································177

8.2质量保证措施·················································182

第九章安全保证体系、安全保证预案及保证措施················188

9.1安全生产管理体系·············································188

9.2安全应急预案·················································190

9.3安全生产保证措施·············································191

9.4水上施工协调及安全措施布设···································194

第十章雨季、冬季施工和春节前后的安排························196

10.1雨季施工····················································196

10.2冬季施工····················································196

10.3春节前后工作安排············································197

第十一章环境保护措施、文明施工措施··························199

11.1环境保护措施················································199

11.2文明施工措施················································203

第十二章施工记录及档案管理···································206

12.1记录类别····················································206

12.2记录形式····················································206

12.3记录管理流程················································206

12.4记录管理要求················································206

第十三章施工技术总结提纲·····································208

第一章编制及施工依据

1、苏州港常熟港区金泾塘作业区大新华通用件杂码头工程—施工图纸;

2、苏州港常熟港区金泾塘作业区大新华通用件杂码头工程—技术规格书;

3、《水运工程质量检验标准》(JTS257-2008);

4、《高桩码头设计与施工规范》(JTS167-1-2010);

5、《水运工程混凝土施工规范》(JTJ268-96);

6、《水运工程测量规范》(JTJ203-2001)(附条文说明);

7、《全球定位系统(GPS)测量规范》(GB/T18314-2009);

8、《港口工程桩基规范》及局部修订(JTJ254-98);

9、《港口工程灌注桩设计与施工规范》(JTJ248-2001)(附条文说明);

10、《水运工程混凝土质量控制标准》(JTS202-2-2011);

11、《码头附属设施技术规范》(JTJ297

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 人文社科 > 法律资料

copyright@ 2008-2022 冰豆网网站版权所有

经营许可证编号:鄂ICP备2022015515号-1