Index
目录
SupplierAcknowledgement
供应商须知
10.0Terms,ConditionsandDocumentation.
10.0条款,条件与文件
20.0RequestforQuotation.
20.0报价要求
30.0JobStartDesignReviewMeeting.
30.0项目启动设计评审会议
40.0Design.
40.0设计
50.0MoldIdentificationandEngraving.
50.0模具确认与蚀刻
60.0GeneralMoldSpecifications.
60.0模具通用说明
70.0CoreandCavity.
70.0型芯与型腔
80.0SlidesandMoldActions.
80.0滑块与成型
90.0GasAssist.
90.0气辅
100.0HotRunnerSystems.
100.0热流道系统
110.0Electrical.
110.0电子方面
120.0MoldSampling.
120.0模具送样
130.0Moldshipment
130.0模具运输
Appendix.
附录
Figure#. Description
名称
Figure100.3ProgressReport
进度报告
Figure200.0RequestForQuoteInformationsheet
报价信息表要求
Figure500.5MoldPlaque–ElectricalSchematic
模板-电子示意
Figure600.2SlugClearance–GuidePins
排渣槽—导柱
Figure600.3aSmallSafetyStrapStandard
小锁模块标准
Figure600.3bLargeSafetyStrapStandard
大锁模块标准
Figure600.4MoldPrySlotStandard
模具撬模槽标准
Figure600.5MoldClampSlotStandard
模具码模槽标准
Figure610.2GuidedEjection
顶针板导柱
Figure610.3TypicalEjectorSleeve/PinExt.
顶管/顶针
Figure610.4Knock-outExtension/EjectorPlateForwardStop
顶出限位块
Figure610.6Thinswitch(limitswitch)
限位开关
Figure620.4RecessedWaterlineFitting
沉头运水接头安装
Figure800.6TypicalLimitSwitchforHydraulicSlidesandCorePull
液压滑块限位及抽芯开关
Figure800.9LockingCylinderStandard
自锁油缸标准
Figure900.3GasPininstallationStandard
气针安装标准
Figure1100.1TypicalWireChannelandCover
线路槽及防护
Figure1100.2Recessed&FlushMountingof5PinConnector
5针连接器缩进安装
Figure1100.2aHeaterandThermocoupleWiring,5PinConnector
加热器与热电偶线,5针连接器
Figure1100.2bRecessed&FlushMountingfor16PinConnector(SinglePocket)
16针连接器缩进安装(单沉孔)
Figure1100.2cRecessed&FlushMountingfor16PinConnector(DualPocket)
16针连接器陷入安装(双沉孔)
Figure1100.2dHeaterWiring,Male16PinConnector
加热器线路,16针连接器(公)
Figure1100.2eThermocoupleWiring,Female16PinConnector
Figure1100.2fRecessed&Flushmountingfor10PinConnector(SafetySwitch)
Figure1100.2gSafetySwitchWiring,10PinConnector
安全开关线,10针连接器
Figure1300.0Moldshipmentchecksheet
模具发送检查单
Figure1500.0IndustrialPlasticsMachineList
注塑机设备清单
Figure1501.0VendorComponentsList
供应商零件清单
SUPPLIERACKNOWLEDGEMENT
供应商须知
DearRespondent,
尊敬的供应商,
ThepurposeoftheMTDProducts,GeneralMoldSpecification,isstandardizationofdesign,components,materialandmethodsintheconstructionofMTDtooling.Althoughspecificinmanyareasofdesignandconstruction,thespecificationisaguidewiththeunderstandingthatproductdesign,annualvolume,processandlifeexpectancymayresultin deviationoradditionalrequirements.TheMTDToolingEngineerisresponsibleforensuring adherencetothespecificationandauthorizingalldeviation.
MTD产品的意图是,通用模具说明是设计,组成,材料与MTD模具制造方法的标准.尽管指定了设计和加工某些方面的细节,但是说明是对产品设计的理解的一种指引,年产量,加工及模具寿命可能会导致背离或额外要求.MTD模具工程师会对确保符合说明要求负责并有权准许所有背离说明内容.
AfterreviewoftheGeneralMoldSpecification,pleasecompletetheinformationbelow,signandreturnthiscopytotheresponsibleMTDToolingEngineer.Uponreceiptyouwillbe addedtotheMTDpreferredtoolvendorlist.
在评审模具通用规格后,请完成下列信息,签字并将复印件返回MTD模具工程师.收到后,贵司将被列为MTD首选模具供应商名单.
ToolingVendor:
模具供应商
Address:
地址:
Name:
名称:
Signature:
签字:
Title:
职务:
Thankyou,
MTDConsumerProductsCenter
ToolingGroup–PlasticsandDieCast
Receipt.
Date:
By:
(MTDToolingEngineer)
10.0TermsandConditions.
10.0条款与条件
10.1Terms.
10.1条款
10.1a.)Paymenttermsare60daysfrompartproductionapproval.
10.1a.)付款周期为产品通过后60天.
10.1b.)ExceptiontothispolicywillbeconsidereddependingonspecificcircumstanceandmustbenegotiatedwiththeMTDToolingEngineerduringquotation.
10.1b.)在报价时,此条款的异议将视情况而定且必须与MTD模具工程师协商.
10.2Conditions.
10.2条件
10.2a)AlltoolingcoveredbyanMTDpurchaseorderisthepropertyofMTDProducts,Inc.
10.2a)所有MTD采购订单的模具均为MTD的财产.
10.2b)TheToolVendorisresponsibleformoldsampling.
10.2b)模具供应商负责模具送样.
10.2c)TheVendorisresponsibleforallshipping.
10.2c)供应商负责所有运输.
10.2d)Themoldmustproduceflashfreepartsandrunaconsistentcyclewithoutmechanicalormoldingproblems.
10.2d)模具生产的产品必须无批锋,并且周期稳定,无机械或成型问题.
10.2e)AllconditionsoftheMTD,GeneralMoldSpecificationBook,mustbemetbeforeapprovalcanbeawarded.
10.2e)MTD的所有条件,通用模具说明书在批准通过授予之前提交.
10.2f)NomoldistobeshippedwithouttheMTDToolingEngineersapproval.(Seesection130.0,MoldShipment).
10.2f)未经MTD模具工程师通过任何模具不得发送.(详见130.0,模具发送部分)
10.2g)Toolingmustbecapableofproducingtherequiredamountofproductpershift,weekormonth,undernormalmanufacturingconditions.
10.2g)模具必须可以在正常生产状态下,按要求生产一个班或一周或一个月的产品.
10.2h)Toollifeexpectancy.
10.2h)模具寿命
10.2h.1)Moldwillproduceproductwithoutoverhaulorreworkofthemoldfor85%ofproductterm.
10.2h.1)模具将保证能够有85%的产品无需检查或返工.产品期限的85%。
10.3Documentation.
10.3文件
10.3a)Ownership.
10.3a)所有权
10.3a.1)Productdrawings,molddesigndrawingsandCADdataarethepropertyofMTDProductsandaretobesubmittedtoMTDuponrequest.
10.3a.1)产品图纸,模具设计图纸及CAD数据均为MTD的财产并MTD要求提交.
10.3b)Confidentiality.
10.3b)保密
10.3b.1)VendorsdoingbusinesswithMTDConsumerProducts,PlasticsandDieCastToolingGroup,willrequireconfidentialinformationforthepurposeofquotation,manufactureorsupplyofpartsandservices.
10.3b.1)与MTD塑料与铸件模具集团消费品公司合作的供应商将对报价资料,生产或供应产品及服务保密.
Confidentialitycont..
保密内容包括:
ThisinformationisprovidedwiththeunderstandingthatitisconfidentialandwillnotbesharedwithathirdpartywithoutwrittenconsentfromtheMTDToolingEngineer.
保密信息无MTD模具工程师的书面同意,不得泄露给第三方.
10.3c.)ProgressReports.
10.3c.)进度报告
10.3c.1)Themoldvendorshallsubmitprogressreportsforeachtooleverytwoweeks,preferablyonFriday.
Thefirstreportduewithintwoweeksofreceiptoforder.ReportsmayberequiredeveryweektowardtheendofthebuildandasrequestedbytheMTDToolingEngineer.
10.3c.1)模具供应商应对每款模具每两周提交进度报告,最好在每周五.第一份报告应在收到订单后两周之内提交.为早日完工,报告可能会要求每星期提交,或根据MTD模具工程师要求提交.
10.3c.2)Progressreportsaretobesubmitted,viaemail,totheresponsibleMTDToolingEngineer.
10.3c.2)进度报告通过E-MAIL提交给MTD模具工程负责人.
10.3c.3)Progressreportsmustshowthefollowinginformation.
10.3c.3)进度报告必须说明以下信息
10.3c.3a)MTDpartnumber.
10.3c.3a)MTD产品编码
10.3c.3b)Latestrevisionlevel.
10.3c.3b)最近修改情况
10.3c.3c)Moldsampledate.
10.3c.3c)模具送样日期
10.3c.3d)Descriptionofthemold.
10.3c.3d)模具说明
10.3c.3e)Vendorcontact.
10.3c.3e)供应商联系方式
10.3c.4)Progressreportsmustcontainapercentageofcompletionforeachareashownbelowaswellastheoverallpercentageofcompletion.(Figure:
100.3)
10.3c.4)进度报告必须包括每部分及全部的完成率,如下(Figure:
100.3)
10.3c.4a)Design.
10.3c.4a)设计
10.3c.4b)Programming.
10.3c.4b)编程
10.3c.4c)MoldBase.
10.3c.4c)模架
10.3c.4d)CavityMachining.
10.3c.4d)型腔加工
10.3c.4e)CoreMachining.
10.3c.4e)型芯加工
10.3c.4f)CavityCNC.
10.3c.4f)型腔CNC
10.3c.4g)CoreCNC.
10.3c.4g)型芯CNC
10.3c.4h)CavityEDM.
10.3c.4h)型腔EDM
10.3c.4i)CoreEDM.
10.3c.4i)型芯EDM
10.3c.4j)Component.
10.3c.4j)配件
10.3c.4k)Bench/Polish.
10.3c.4k)抛光
10.3c.4l)Assembly.
10.3c.4l)装配
ProgressReportscont…
进度报告内容:
10.3c.5)IfthereareanydelaystheMTDToolingEngineermustbenotifiedimmediately.
10.3c.5)如果有任何延误,请立即通知MTD模具工程师.
10.3c.6)Ifthemoldvendorhasanexistingreport,itcanbeusedaslongastherequiredinformationisshown.
10.3c.6)如果模具供应商有自己的报告形式,只要包含以上内容提要使用。
QUOTATION
报价
20.0Requestforquotation.(RFQ)
20.0报价要求(RFQ)
20.1AllrequestforquotationwillbeinitiatedbytheMTDToolingEngineer.
20.1所有报价要求将由MTD模具工程师提出.
20.2Quotationrequestwillincludeoneormoreofthefollowing.
20.2报价要求将包含一点或更多下列内容.
20.2a)MTDRequestforQuotationInformationSheet.(Figure200.0)
20.2a)MTD报价信息表要求((Figure200.0)
20.2b)Letterwithdetailsofthequotationrequirements.
20.2b)报价要求的细节
20.2c)2Dor3Dproductdata.
20.2c)2D或3D产品数据
20.2d)Toolingdata/drawingsifexisting.
20.2d)模具数据/图纸
20.3Preferredmethodsforcommunicationanddataexchange.
20.3首选的沟通与数据交换方法
20.3a)Quotationrequestwillbesentviaemail.
20.3a)报价要求将通过E-MAIL传送
20.3b)Quotationreplyandquestionsshouldbeviaemail.
20.3b)报价回复与问题应通过E-MAIL
20.3c)ProductandtoolingdatawillbepostedtothevendorFTPsiteorattachedtoanemail.
20.3c)产品和模具数据将通过FTP传输给供应商或通过E-MAIL以附件传输
20.4Datareview.
20.4数据评审
20.4a)TheMTDToolingEngineerwillprovideaQuotationInformationSheetorletterforpurposesofdescribingthemoldorengineeringchangetobequoted.However,MTDexpectsandrequeststhatthevendorreviewthedataandmakesuggestionsandcommentsastoimprovements,costsavingsoritemsnotmentionedintherequest.
20.4a)MTD模具工程师将提供模具信息表或模具描述模具或工程更改。
无论怎样,MTD期望并要求供应商评审数据并建议或提出改进,降低成本等未提及的方面。
20.5VendorQuotations.
20.5供应商报价
205a)Mustbespecificastothetotalcostandrequiredleadtime.
205a)必须说明总成本和提前期
20.5b)MustadheretoallrequirementsoftheMTDGeneralMoldSpecificationaspresentedinthemanualandallspecificrequestasdescribedintheRequestforQuotation.
20.5b)必须遵守MTD模具通用规格
20.5c)Anyexceptionsmustbeclearlystatedandspecifiedwithinthevendorquotation.
20.5c)任何异议必须清楚陈述并在卖方报价中详细写明。
QUOTATIONScont.
报价内容
20.5d)Quotationsfornewtoolingmustincludethefollowinglineitems.
20.5d)新模具报价必须包含下列条款。
20.5d.1)Tool/molddescription.
20.5d.1)模具描述
20.5d.2)Toolquote.
20.5d.2模具报价
Note:
Quotationmustincludeallshipping.Seesection10.2coftheGeneralMoldSpecification.
备注:
报价必须包含所有运输。
参看通用模具规格10.2C
20.5d.3)Texture.
20.5d.3)皮纹