望园东里2号3号6号楼工程监理实施细则
望园东里2号、3号、6号楼工程监理实施细则
翟理民吴卫东陶贤林
北京磐石建设监理有限责任公司
1工程概况·····································································································································1
1.1工程名称··························································································································1
1.2工程地点··························································································································1
1.4工程基本情况··················································································································
1.5项目有关单位组织系统···································································································
2监理细则编制依据·····················································································································
3监理工作目标值·························································································································
3.1质量目标··························································································································
3.2进度目标··························································································································
3.3投资目标··························································································································
4质量控制要点及方法·················································································································
4.1测量工程··························································································································
4.2基础土方、回填土方工程·······························································································
4.2.1施工准备阶段的控制····························································································
4.2.2施工阶段质量控制点····························································································
4.2.3质量要求···············································································································
4.3地下工程防水工程···········································································································
4.3.1施工前控制···········································································································
4.3.2施工中控制···········································································································
4.3.3质量控制目标优良······························································································
4.3.4防水层施工验收··································································································
4.4模板工程························································································································
4.4.1施工前质量控制··································································································
4.4.2施工过程中的质量控制······················································································
4.4.2.1模板安装··········································································································
4.4.2.2模板拆除··········································································································
4.5钢筋工程························································································································
4.5.1施工准备阶段质量控制···················································································
4.5.2施工过程中质量控制························································································
4.5.3质量要求············································································································
4.6混凝土防水、钢筋混凝土工程··················································································
4.6..1施工准备阶段的控制························································································
4.6.2施工阶段的控制··································································································
4.7地面工程······················································································································
4.7.1施工准备阶段控制······························································································
4.7.2施工阶段注意控制:
························································································
4.7.3成品保护控制:
·································································································
4.7.4质量检评标准······································································································
4.8门窗工程····················································································································
4.8.1施工准备阶段······································································································
4.8.2施工阶段质量控制··························································································
4.8.3成品保护措施控制······························································································
4.9装饰工程························································································································
4.9.1施工准备阶段控制:
··························································································
4.9.2施工阶段质量控制:
························································································
4.9.3成品保护控制·····································································································
4.10屋面防水工程··········································································································
4.10.1施工准备阶段控制·························································································
4.10.2监理工程师施工阶段质量关键点的控制·························································
4.10.3屋面保温隔热层、找平层、卷材防水工程质量标准·····································
4.11屋面工程·····················································································································
4.11.1施工准备阶段控制····························································································
4.11.2监理工程师施工阶段关键点的控制·······························································
4.11.3屋面保温隔热层、找平层、卷材防水质量标准············································
4.12暖卫设备安装工程······································································································
4.12.1暖卫设备管理要求与控制················································································
4.12.2暖气做法质量要求与控制··············································································
4.12.3室内给排水工程································································································
4.12.4室内热水采暖工程····························································································
4.12.5附属设备安装工程····························································································
4.13电气工程·····················································································································
4.13.1施工阶段·······································································································
4.13.2竣工阶段······································································································
4.14监理工作流程·············································································································
4.14.1工程材料、构配件和设备质量控制基本程序·················································
4.14.2分包单位资格审查基本程序··········································································
4.14.3月工程计量和支付基本程序········································································
4.14.4工程进度控制的基本程序··············································································
4.14.5施工阶段质量控制程序(框图)··································································
4.15抓住监理工作的难点要点·······················································································
4.16监理用表·····················································································································
1-
1工程概况
1.1工程名称
丰台区望园东里2号、3号、6号楼工程。
1.2工程地点
北京市丽泽桥西侧,丰台城建开发公司北侧(周庄北路东侧,小井村路西侧地段)。
(1)3望园东里2号、3号、6号高层住宅总平面图、立面图:
(2)特点:
高层建筑
1.4工程基本情况
名称
工程造价
(元)
建筑面积
(m2)
建筑
高度
(m)
地上
层数
地下
层数
结构
类型
基础
类型
2号2685932222025.869.9252
3号2659254222137.0469.9252
6号2469665919862.469.9242
现浇剪力墙结构钢筋混凝土满堂基础
合计7814852364025.24
1.5项目有关单位组织系统
项目有关单位一览表
序号单位全称负责人职务电话
1建设单位北京丰台城建开发公司孙敏华经理××××
2监理单位北京磐石监理有限责任公司张京喜经理××××
3设计单位北京建筑设计研究院毛萍××××
4施工单位
北京华威建筑公司
北京城建一公司
北京城乡建兴公司
刘洪柱项目经理
唐永林项目经理
张波项目经理
5监督单位
丰台区建设工程质量监督站
黄绍众站长××××
2监理细则编制依据
(1)已批准的监理规划;
(2)施工组织设计;
(3)主要工程质量检验评定标准依据:
1)建筑安装工程质量检验评定统一标准BJ300-88
2)建筑工程质量检验评定标准GBJ301-88
3)建筑采暖卫生与煤气工程质量检验评定标准GBJ302-88
4)建筑电气安装工程质量检验评定标准GBJ303-88
5)通风与空调工程质量检验评定标准GBJ304-88
6)电梯安装工程质量检验评定标准.GBJ305-88
7)混凝土强度检验评定标准GBJ107-87
8)预制混凝土构件质量检验评定标准GBJ321-90
9)混凝土质量控制标准GBJ50164-92
(4)主要施工及验收规范、规程
1)土方和爆破工程施工及验收规范GBJ201-83
2)地基与基础工程施工及验收规范GBJ202-83
3)砖石工程施工及验收规范GBJ203-83
4)混凝土结构工程施工及验收规范GBJ50204-92
5)地下防水工程施工及验收规范GBJ208-83
.6)屋面工程施工及验收规范GBJ207-83
7)地面与楼面工程施工及验收规范GBJ209-83
8)装饰工程施工及验收规范GBJ210-83
9)采暖与卫生工程施工及验收规范GBJ242-82
10)电气装置安装工程施工及验收规范GBJ232-82
11)通风与空调工程施工及验收规范GBJ243-82
12)钢筋焊接及验收规程JGJ18-84
(5)主要技术规范、规定
1)普通混凝土配合比设计技术规定GBJ55-81
2)地下工程防水技术规范GBJ108-87
3)组合钢模板技术规范GBJ214-89
4)混凝土外加剂应用技术规范GBJ119-88
5)建筑防水工程质量的若干技术规定DBJ01-3-88
6)建筑工程施工测量规程DBJ01-21-95
7)商品混凝土搅拌、运输、泵送质量控制及试块制作DBJ01-6-90
(6)主要工程材料标准
1)硅酸盐水泥、普通硅酸盐水泥GB175-92
2)矿渣硅酸盐水泥、火山灰硅酸盐水泥及粉煤灰硅酸盐水泥GB1344-85
3)低碳热轧圆盘条GB701-92
4)钢筋混凝土用热轧带肋钢筋GB1499-91
5)用于水泥和混凝土中的粉煤灰GB1596-91
(7)以质量为核心,使工程在预定的投资范围和预期的工期内,
达到最佳的质量,力争工程达到市优质工程、结构长城杯标准。
1)以效益为重点:
监理工程师力争使各项投资都得到最合理的使用,并通过技术挖潜等措施,在确保工期和工程使用功能的前题下降低造价人才网工程造价。
2)以工期为关键,合理的工期是保证质量和效益的关键,因此,我们要牢牢抓住工期这个关键,确保关键线路上的工期目标,最后达到预期的总工期目标。
3监理工作目标值确保工程质量在合格的基础上,力争市优。
3.1质量目标
序号分部工程名称