ISO26262系统测试计划
SyTP
SystemTestPlan
1
TableofContents
1TableofContents2
2RevisionHistory3
3Introduction4
3.1Generaloverview4
3.2Aboutthisdocument4
3.3Abbreviations4
4References5
5Maincontent6
5.1Heading26
5.1.1Heading36
2
RevisionHistory
Version
ECNno.
Changedby
Changefromlastversion
01
Thechangehistoryshallbeadetailedenoughdescriptionofwhatsectionsthathavebeenchangedsincethelastversion.Dependingonthechangesthathavebeenmadeitmaybenecessarytodescribethechangesmoreindetail.
Bluetextinitalicisinformation/explanationdirectedtotheissuerofthedocument.BeforereleasingtheWorkProduct(document)allblueitalictextmustberemoved.
Markunusedsectionsofthisdocumentas“NOTAPPLICABLE”,donotremovetheparagraphheading.
Textmarkedwithaistobereplacedbysomethingspecific.ThisshallbeusediftherearespecifickeywordswithinstandardizedparagraphsthatshallbereplacedwhencreatingtheWorkProductfromthetemplate.
3
Introduction
Generaloverview
Thissectionshallcontainabriefdescriptionofthebackgroundofand/orreasonforthisdevelopmentproject.
Describebrieflythesystembeingdeveloped.Iftheproduct/itemdevelopedatthislevelispartofasystem,alsobrieflydescribetheproducts’relationshiptothesystem.
Thissectionshallalsostatewhoistheproject’sendcustomer.
Aboutthisdocument
Describethepurposeandthestructureandlayout(disposition)ofthisdocument.
Abbreviations
Abbreviation
KA
XxAutomotive
N/A
NotApplicable
TBC
ToBeConfirmed
TBD
ToBeDefined
4
References
Ref
Id
Issue
DocumentName
[R1]
5
SystemTestscope
Placethemaincontentofthetemplatehere.Addasmanyextraparagraphswiththetoplevelheadingorlowerlevelheadingsasappropriate.
Ofcoursethenameofthisparagraphshallberenamedfrom“Maincontent”toanappropriatename.
Definetherequiredtestareastobeperformedintheprojectbelowinthetable.
Theprocessoftestingisusedtoverifytheimplementationofrequirements.ThedifferenttestinglevelsaredescribedinTable1.
TestingLevel
BasisforTests
TestPlan
TestObject
TechnicalLead
1
Unittesting
2
ElectronicTesting
3
SoftwareTesting
4
HSI
5
Systemintegration
6
SystemVerification
Table1.Testlevels
ElectronicTesting
Definetherequirementsfortestingatthisspecifictestlevel.
SoftwareTesting
Definetherequirementsfortestingatthisspecifictestlevel.
HSI
Definetherequirementsfortestingatthisspecifictestlevel.
SystemIntegration
Definetherequirementsfortestingatthisspecifictestlevel.
SystemVerification
Definetherequirementsfortestingatthisspecifictestlevel.
6Testitem
Defineanddescribethesystemtotest,i.e.thetestitem.
ASILClassification
DescribetheASILlevelfortheproductandspecificrequirementsforthetestingtobeperformed
7TestApproach
Definethetestapproachwithbriefdescriptionoftestequipmentsandtestmethodstouseforallthetestlevels
Testequipments
Definetheneedsforthetestequipmentsonahighlevel.
SafetyRelatedTesting
DefinetheneedfortheASILdependentspecifictestingandanalysis
8ItemPass/FailCriteria
Definethecriteriasforpassorfail.
Example:
Alltestsperformedhaveaclearpass/failcriteriabasedoncustomerrequirementsinSyTP.Atmaindelivery(VP)noissueswithseverity“Major”or“Medium”areallowed.Nofailsinsafetyrelatedtestingisallowed.Forpriordeliveriesissuesofseverity“Major,Medium,Minor”areallowed.Knownissuesinanydeliveryshallbelistedinthetestreportandvalidationplan.
Severity
Description
Major
Testscannotproceedfurtherwithinapplicabletestcase(noworkaround).
Thecustomerisdirectlyaffectedbythefault.
Or
Anynon-cosmeticerrorinasafetyrelatedfeature
Medium
Thetestcaseorprocedurecanbecompleted,butproducesincorrectoutputwhenvalidinformationisinput.
Thefaultisnoticeableforthecustomerbutthereareaworkaroundforthedefect.
Or
Cosmeticerrorinasafetyrelatedfeature
Minor
Thetestcaseorprocedurecanbecompletedandproducescorrectoutputwhenvalidinformationisinput,butproducesincorrectoutputwheninvalidinformationisinput.
Thisisnoticeableforthecustomerbutnoworkaroundneededforthedefect.
Alltestcasesandprocedurespassedaswritten,buttherecouldbeminorrevisions,cosmeticchanges,etc.Thesedefectsdonotimpactfunctionalexecutionofsystem.
Notnoticeableforthecustomer.
Figure1Severitydefinition
9SuspensionCriteriaandResumptionRequirements
Definethecriteriasforsuspendandresumetesting.
Example:
Thecriteria’sforsuspendorresumethetestsarethefollowing:
Suspendcriteria’s
∙Adefectisfoundthatcannotallowanyfurthertesting.
∙Anonworkingtestenvironmentthatprohibittesting
Resumecriteria’s
∙Whenadefectcorrectionisimplementedandthetestteamisnotifiedtocontinuetesting
10Testdeliverables
Definetheoutputfromthetests.
Example:
Theoutputfromthetestsarethefollowing:
∙Testmethod,explainingthetest.
∙Testreport,containingthetestresult.SummarizedinValidationplan
∙Validationplan,summarizingthetestsandresults.
11Schedule
Definethetesttimeplanorrefertotheprojecttimeplan