SAUDIKAYANPETROCHEMICALCO.,LTD.

SAUDIKAYANPETROCHEMICALCOMPLEXU&OPROJECTFLAREAREA

 

DOCUMENTTITLE:

METHODSTATEMENTFOR

INSTALLATIONofROTATINGEQUIPMENT

 

SCCDOCUMENTNO:

063-QP-2-1003

 

  

 

Owner:

SaudiKayanPetrochemicalAl-JubalSaudiArabia

PMC:

FLOURCO.LTD.

CONTENTS

1.0Scope3

2.0REFERENCES3

3.0GENERAL4

4.0PROCEDURE4

5.0ProjectHSEPlan11

6.0Attachments11

 

1.0Scope

Theprocedureisaimedtodescribetherotatingequipment,likepump,compressor,etcinSaudiKayanU&OProject.

Theinstallationshouldstrictlyfollowalltheapplicablespecification,standard,procedure(includingHSEPlan),drawingandinstallationmanualfromvendor.Ifthereisanyconflictbetweenthisprocedureanddrawingrequirementforthespecialrequirementfromequipmentspecification,thelattershallgovern.Atthesametime,theprocedureshallconformtotherequirementfromFLOURCO.LTD.

2.0REFERENCES

2.1API610

2.2API686

2.3Plotplan

2.4Installationmanual

Inwhichtheinstallationproceduresandallowablealignmenttolerancecanbefoundandreferenced.

2.5Vendordwg

Drawingsprovidedbythevendorandfromwhichdetailedfabricationdrawings,assemblydrawings,andsectionaldrawingscanbefoundinordertoensurethemechanicalassemblycanbeperformedcorrectly

2.6Pipingarrangementdwg

Fromthedrawings,theorientationandelevationoftheequipmentcanbefound.

2.7Packinglist

Fromwhichthequantityofeachequipmentparttobepackedandmoreaccurateweightcanbefound.

3.0GENERAL

3.1Theinspectionworkcomplywithrelevantprojectspecifications,drawings,manufacturer’sdocumentsandapplicablecodesorlocalregulations.

3.2Manufacture’sdocuments,drawingsandinstallationinstructionswillbeusedasapartofthisprocedure.

3.3Equipmenttobeassembledatsite,suchaslargepumpwillbeinstalledinaccordancewiththeinstallationinstructionsuppliedbyequipmentmanufacturesandreferenceddocumentation.

4.0PROCEDURE

4.1WorkFlowforConstructionofRotatingEquipment

PREPARATION

JOBSITERECEIVING

FOUNDATIONSCHECK

INSTALLATION

PROTECTION

ALIGNMENTOFEQUIPMENT

GROUTING

COMMISSIONING

END

 

4.2Preparation

4.2.1StudytheContract,specifications,andrelevantcodestoensurethattheworkscope,workquantity,andconstructionschedulearethoroughlyunderstood.

4.2.2ConstructionEquipmentMobilizationPlan

A.Major/HeavyEquipmentTransportationandRiggingPlan.

B.ConstructionEquipmentMobilizationPlan.

4.3InspectionofFoundationandFoundationBolts

Removealltheforeignmattersincludingformworks,debris,gravel,sand,andprotectivesleevesonbolts,etc.Ifoilorgreaseexistsonthesurfacesandisunabletobecleaned,removeitusingbrush.

Aftercheckagainstrelevantdrawingsandtemplates,ConstructionEngineer(supervisor)shallcarryouttheinspection,“EquipmentCheckListPriortoInstallation”forthefollowingitems:

ACenterlineandelevationline

B.Whetherthedimensionsandorientationoffoundationiscorrectornot?

C.Curingtimeisadequateornotaftertheformworksareremovedfromthefoundation?

D.Thegroutingblockshallbedoneonthefoundation.Adjusttheheightofgroutingblocktomakesurethetopelevationofpadidenticalwiththeelevationofequipmentbaseplateanditslevelnessshallbedoneadequately.Thecompletedgroutingblockmustbecuredinaccordancewithmaterialspecifications.

E.Checkifthesurfaceofthefoundationhasalreadybeenchipped.Thesurfaceshallbealsokeptclean.

F.Whetherthesizeandlocationoffoundationboltsareinconformancewithrelevantdrawingsornot?

G.Theprotrusionpartoftheboltsisinconformancewithdrawingsornot?

Alittlebitlongerisacceptable,butnotshorter.

H.Anyinclinationoftheboltsfoundisnotallowed;otherwisetheequipmentbaseplatecannotbefirmlytightenedup.

I.Itmustbefreeofgravel,sand,wastedwaterandotherforeignmaterialsintheholeofreservedanchorbolt,anditsdimension,depthandperpendicularity,etcshallaccordwithdesignrequirement.

4.4EquipmentTransportationandRigging

4.4.1Unpacking,checking,andstorageofequipment

A.Folk-liftsandothermechanicalmethodsarestrictlyprohibitedduringunpackinginordernottodamagetheequipmentanditsaccessoriessuchasprecisioninstrumentsandothersmallborepiping.

B.Inspecttheappearanceoftheequipmenttoseeifanypartsaredamagedimmediatelyafteritisunpacked.Owner’srepresentativeshallwitnesstheinspection,ifnecessary.

C.Checkandcountspecificationandquantityrespectivelyofeachpartanditsaccessories(includingspecialtools)onebyoneinaccordancewiththePackingList.Intheeventthatanyshortageordamagefound,informtheOWNERandthethirdparty,askforre-shipmentandfilloutthereportimmediately.

D.Checkandensurethattheprotectiveandanti-rustingmeasuresforthemachiningsurfacesareadequate.Provideremedialactions,ifrequired.

E.Allthesmallitems,sparepartsandspecialtools,etc.exceptlargeitemsshallbestoredindoorsandclearlylistedformanagement.

F.Protectivemeasures,suchasusingthetarpaulinascoverstopreventfromgettingdampedandforeignmattersfromenteringintotheinteriorofmachine,shallbeprovidedforlargeritemsandparts,whicharestoredoutdoorsandcannotbeinstalledwithinaveryshorttime.

G.Allmovingpartsshallbecoatedwithanti-rustinggreaseandtheshaftshallbeturnedeveryoneweektoavoidtheoilfilmbeingpressedbytheshaftduetoitsdeadweightsuchthatthemetalofshaftwillcontactdirectlywiththatofthebearing,andconsequentlythescratcheswillbeproducedonthecontactingsurfaces.

H.Inspectallthecoolingwaterjackets.Drainoffalltheaccumulatedwater,ifany,dryitwithair,andthenwrapupwithtarpaulintopreventitfromgettingrustedduetoentranceofthemoisture.

4.4.2EquipmentRigging

TheConstructionEngineer(supervisor)shallprepareRiggingPlanincludingtheinformationofcranetype,workingradius,equipmentweight,removalandrestorationofobstructions,transportationroute,etc.

4.4.3InstallationofEquipment

A.Theinstallationoftherotatingequipmentshallbestrictlyinaccordancewithrelevantspecifications.Thecenterofgravityanddimensionsoftheequipmentandfoundationlocationincludingorientationshallbetakenintoconsiderationindeterminingtheriggingmethod.Collisionshallbeavoidedduringliftinginordernottocausethedamageoffoundationboltsandequipmentitself.Ifrequired,theexpensiveinstrumentsandsmallerpipingshallbedismantledinadvance.

B.Theriggingmethodsforgeneralrotatingequipmentareasfollows:

a.Combinationofcraneandchainblock

Attachthechainblocktothehookofthecrane.Usethecranetoaccomplishthelargermovementandchainblockforsmallermovement.

b.Monorail

Monorails,fromwhichaslidingchainblockcanbeattached,arefrequentlylocatedinsidethebuildingforthemaintenancepurposeoftherotatingequipment.Thischainblockcanperformtheupward,downward,leftandrightmovementsasrequired.

c.Roller

Laytworowsofparallelrailroadtiesonthegroundinsidethebuilding,andplacetwopiecesofpipewiththesamediameterontopoftheserailroadtiesasrollers.Useofasledgeorchainblockasameanstopulltheequipmentuptothetopofthefoundation.Hydraulicjacksorchainblockswillsubsequentlybeusedtoperformtheriggingoperation.

C.Uponthecompletionoftheequipmentinstallation,theEquipmentConstructionEngineer(supervisor)shallcarryouttheinspectiontogetherwiththeOWNERorOwner’squalityinspectionrepresentativeandpreparetherecordsaccordingly.

4.5HorizontalAdjustmentofequipment

A.Unlessotherwisespecified,levelingwillbecarriedoutwithaspiritlevelonthemachinedsurfacesofthedriverbaseplate,onthemachinedsurfacesoftheequipmentpedestalsoronthesurfaceoftheflangeonthetopoftheequipment.Thelevelwillbemeasuredinthedirectionoftheshaftandatrightangletotheshaft.Adjustmentwillbemadebyremovingorinsertingshimsbetweenlevelingpadsandbaseplate,However,jackboltswillbeusedifitisprovidewiththeequipment.

B.Themaximumout-of-leveltoleranceshallbe0.05mm/M,unlessotherwisespecified.

4.6GroutingofEquipment

4.6.1Uponthecompletionoftheequipmentriggingpositioning,TheConstructionEngineer(supervisor)shallcarryouttheinspectiontogetherwiththeQualityQCEngineer.Thefoundationsurfacesshallbethoroughlycleanedandsubsequentlywettedbywater,ifrequired.Ifsleevetypefoundationboltsareused,thewateraccumulatedinsidethesleeveshallberemovedanddried.

4.6.2ThematerialofthegroutshallbeinaccordancewiththerequirementsstipulatedintheConstructionContractorrotatingequipmentvendor’sspecification.Ingeneral,non-shrinkagecementorepoxyresinareusedandpouredintothegapsbetweenequipmentbaseplateandfoundationandthespaceinsidethesleeves.

4.6.3Supplementaryillumination

Ifanchorboltisdeliveredwithequipment,andequipmentfoundationisprovidedwithreservedholeforanchorbolt,thereservedholeshallbegrouted(firstgrouting)afterequipmentalignment.Theanchorboltholeshallbefreeofforeignmaterials,itswallshallbesoakedwithwater,anditsbottomshallbefreeofwastedwater.Duringfirstgrouting,keeptheanchorboltstraightandpreventthemobilizationforequipment.Afterfirstgroutingandcuringqualifiedcompletion,implementsecondalignmentinaccordancewithparagraph4.5.Oncethesecondalignmentischeckedqualified,theequipmen