抢工施工方案定稿
目录1.工程概况...................................................................................................................................3
2.工程重点和难点.......................................................................................................................5
2.1工程重点...................................................................................................................................5
2.2工程难点...................................................................................................................................5
3.抢工期间增加费用比较...........................................................................................................7
3.1人员增加方面...........................................................................................................................7
3.2材料投入增加方面...................................................................................................................8
3.3设施、设备投入增加方面.......................................................................................................9
3.4施工降效方面...........................................................................................................................9
3.5对参建人员的奖励制度.........................................................................................................10
4.主要抢工措施.........................................................................................................................10
4.1劳动力组织.............................................................................................................................10
4.2现场设置临时中转堆料场.....................................................................................................11
4.3建材及建筑渣转运.................................................................................................................11
4.4施工管理措施.........................................................................................................................11
4.5特殊工艺.................................................................................................................................11
4.6受天气影响的赶工措施.........................................................................................................12
21.............................................................................................赶工中设计文件管理沟通措施4.7.
4.8夜间施工措施.........................................................................................................................12
4.9冬季施工措施.........................................................................................................................13
4.10墙体烘干措施.......................................................................................................................13
4.11雪天施工的措施...................................................................................................................13
5.赶工阶段的质量保证措施.....................................................................................................13
5.1工期履约的组织保证措施.....................................................................................................14
5.2工期履约的制度保证措施.....................................................................................................14
5.3工期履约的资源保证措施.....................................................................................................14
51......................................................................................................赶工阶段的安全保证措施6.
1.工程概况
总建筑面积:
3402.99㎡,其中:
办公楼1509.3㎡、宿舍楼1590.84㎡、犬舍264.6㎡、门卫38.25㎡.
办公楼
2层数1509.3m3层建筑面积12.45m层高一层3.9m;二、三层3.6m檐高
0.45m
室内外高差砖混结构结构类型采用烧结页岩砖,外墙370m厚,其它承重墙240m厚,非承重墙120m
外墙外保温采50m保温工岩棉复合板,屋面保温采50m岩棉复合
屋面防水等级二级,SB防水工改性沥青防水卷材3+m厚聚酯胎Ⅱ
蘑菇石板、面砖墙面、喷涂涂料墙面,此做法待定,我方建议改为铝外装板幕墙以消除冬施影响楼地面:
石塑防滑地砖楼地面、铺地砖楼地面、铺地砖防水地踢脚:
地砖踢内装内墙面:
瓷砖墙面、白色耐水涂料墙
顶棚:
涂料顶棚、铝条板吊
宿舍楼
2层数3层1590.84m建筑面积
13.05m3.9m层高檐高砖混结构结构类型室内外高差0.45m
采用烧结页岩砖,外墙为370mm厚,其它承重墙为240mm厚,非承重墙墙体为120mm厚
外墙外保温采用50mm岩棉复合板,屋面保温采用保温工程50mm岩棉复合板
屋面防水等级二级,为防水工程SBS改性沥青防水卷材(3+4)mm厚聚酯胎Ⅱ型
蘑菇石板、面砖墙面、喷涂涂料墙面,此做法待定,我方建议改为铝塑外装修板幕墙以消除冬施影响。
.
楼地面:
石塑防滑地砖楼地面、铺地砖楼地面、铺地砖防水地面
踢脚:
地砖踢脚内装修内墙面:
瓷砖墙面、白色耐水涂料墙面
顶棚:
涂料顶棚、铝条板吊顶
犬舍
2层数1层建筑面积264.6m4.5m檐高层高3.45m
室内外砖混结0.45m
结构类采用烧结页岩砖,外墙370m厚,其它承重墙240m厚,非承重墙墙120m
保温工外墙外保温采50m岩棉复合板,屋面保温采50m岩棉复合
防水工屋面防水等级二级,SB改性沥青防水卷材3+m厚聚酯胎Ⅱ
蘑菇石板、面砖墙面、喷涂涂料墙面,此做法待定,我方建议改为铝塑外装幕墙以消除冬施影响地面:
铺地砖地踢脚:
地砖踢内装内墙面:
涂料墙顶棚:
涂料顶棚门卫
21层数38.25m层建筑面积4.5m3.9m层高檐高室内外高0.45m
结构类型砖混结构差采用烧结页岩砖,外墙为370mm厚,其它承重墙为240mm厚,非承重墙为墙体120mm厚
岩棉复合板50mm岩棉复合板,屋面保温采用50mm外墙外保温采用保温工程
防水工程屋面防水等级二级,为
SBS改性沥青防水卷材(
3+4
)mm厚聚酯胎Ⅱ型
蘑菇石板、面砖墙面、喷涂涂料墙面,此做法待定,我方建议改为铝塑板外装修
幕墙以消除冬施影响。
楼地面:
铺地砖地面、铺地砖防水地面踢脚:
地砖踢脚内装修
内墙面:
瓷砖墙面、白色耐水涂料墙面
顶棚:
涂料顶棚、铝条板吊顶
2201325日开工,年在具备施工条件的情况下,本工程合同约定工期为2012年8月压87天,年11月30日竣工,总工期2012月3日竣工,总工期162日历天;现业主要求75天。
缩工期本工程建设位置处于凉水河公园二标段绿地中,进场时现场还存有大量绿化用乔木、20125日。
因灌木、花卉地被等植物;待园林公司移植完上述苗木后