基坑支护外文文献.docx

上传人:b****7 文档编号:11332133 上传时间:2023-02-27 格式:DOCX 页数:10 大小:25.45KB
下载 相关 举报
基坑支护外文文献.docx_第1页
第1页 / 共10页
基坑支护外文文献.docx_第2页
第2页 / 共10页
基坑支护外文文献.docx_第3页
第3页 / 共10页
基坑支护外文文献.docx_第4页
第4页 / 共10页
基坑支护外文文献.docx_第5页
第5页 / 共10页
点击查看更多>>
下载资源
资源描述

基坑支护外文文献.docx

《基坑支护外文文献.docx》由会员分享,可在线阅读,更多相关《基坑支护外文文献.docx(10页珍藏版)》请在冰豆网上搜索。

基坑支护外文文献.docx

基坑支护外文文献

中文3700字

Soilnailwall,alsoknownassoilnailingtechnology,whichisinstalledinsitusoilwitharelativelydensesoilnails,andsoilslopesurfaceofsprayedconcretetobuildasteelmeshsurfacelayer,throughthesoilnails,thesurfacelayerandin—situsoiltheroleofthethreecommonslopeorretainingwallside。

Soilnailwallsbutalsoposesasimilargravityinsitureinforcedearthretainingstructures.Andsupportingavarietyofmethodshavebeencompared,ithastheconstructioneasy,simpleequipment,requirelittlespace,excavationandsupportingjobscanbeparallel,theoverallprogressofthefast,lowcost,aswellaspollution,lownoise,stableandreliable,socialandeconomicgood,andmanyotheradvantages,andthereforeathomeandabroadwiththefoundationpitslopereinforcementhasbeenwidelyappliedrapidly.

        Soilnailwallconstructiontechnologyisatop—downstepbystepbuildprocess,accordingtothefollowingorder:

Accordingtodesignrequirementsforexcavationface,trimmedslope,plantedsprayedconcretethicknesscontrolsigns;jetfirstlayerofconcrete;erectionofdrillingsoilnails,grouting,erectionofconnectors;bandingsteelnet,sprayasecondlayerofconcrete;settopofthehill,slopeandthefootoftheslopeofthedrainagesystem.

        Soil-nailedlaw-enforcement:

keepasmuchaspossible,significantlyhighermaximumuseofpitwallsideofinherentmechanicalstrengthofsoil,changingsoilstructureandsystemloadaspartofthebracing。

Sprayedconcreteundertheeffectofhighpressuregasflow,whereinhigh-speedsoilsurfacelayerandthesoilinthespraycreatedbetween'embeddedsolid—effect',andgraduallyformacompletelyclosedwiththeexcavationshoringsystems,spraylayerandmountedwithaprotectivelayerofandreinforcementoftopsoil,sothattoavoidexposuretowindandrainerosion,shallowcollapse,localspalling,aswellastheroleofimpermeableimpermeable.Soilnailingaspecialcontrolpressuregroutingcanbereinforcedmediumgreatlyimprovedphysicalandmechanicalpropertiesmakeitbecomeanewgeologicalbody,itssolid—solidintheslipplanethedeepsectionofthesoiloutsidethehouse,itsexternalfixedterminalSpraythesurfacelayerinconjunctionwiththenetworkasawholemaybeatendencytoinstabilityinthesidewalltransferredtothesolid-sectionanditsvicinityandtoeliminate。

ReinforcedMeshsprayedlayercanhaveabetterintegrityandflexibility,caneffectivelyadjustthespraylayerandthestressdistributionwithinthesoilnail。

Activesoilnailretainingsoilandwithsoiltogetherwithconstructionofsimple,rapidandtimely,flexibleapplicability,withthediggingwithsticks,safeandeconomiccharacteristics。

Itsdurationisgenerallypoorerthanthetraditionalmethodtosavemorethan30—60d,engineering,lowcostand10%—30%,supportingthemaximumverticalpitdepthhasnowreached21.5m,builtmud(localmiscellaneousfill)pitdepthof10m。

Thismethodnotonlyeffectivelybeusedforgeneralgeotechnicaldeepexcavationshoring,oftenalsousedanumberofotherancillarysupportmeasures,caneffectivelybeusedforsupportingstreamingsand,silt,complexfilling,saturatedsoil,softsoil,etc.adversegeologicalconditionsofthedeepexcavation。

Inaddition,itisalsorapid,reliableandeconomicalmethodofusingthetraditionalmethodorimprovedfacilitiestobemadeorhavebeencarriedoutrescueexcavationinstabilityreinforcement。

        Ofsoilnailingandreinforcedsoilandanchoritseemssuchasretainingstructures,however,thestructureofsoilnailingandreinforcedearthconstruction,etc.Therearemanydifferentpoints,andanchor.

        Firstofall,soilnailingandreinforcedsoilslopeorretainingwallisnotthesame,mainlyreflectedin:

theconstructionindifferentways。

Soil—nailedconstructionofthedistributionofexpansionfromtoptobottom,sideexcavationwhileretainingfulluseofundisturbedsoilstrength。

Reinforcedearthstructurefrombottomtotopfillinglayeredconstruction,fillingchoice,densityandintensitycanbecontrolled;reinforcedpullthebiggestchangesinbodypatternisdifferent.Inthereinforcedearthstructure,thegeneralbodyatthebottomofthetendonforcemaximum。

Inthestructureofsoilnailing,thegeneralrangeofthecentralpartofthelargestforceofsoilnail,theupperandbottomofthesoilnailforcesmall;differentdeformationproperties.SoilNailingthemaximumdisplacementoccurredinthesupportingslopeatthetopornearthetop,reinforcedearthstructure,themaximumdisplacementatthebottom.

        Secondly,soilnailingandboltingorretainingwallisnotthesame,mainlydueto:

thevariouspartsoftheforceandthesamerole。

Boltingorretainingwalloftheanchorgenerallyanchoragesectionandfreeabove,theuseofslidingsurfacetoprovideresistanceoutsidetheanchoragesection,settheanchorgenerallyprestressed,thefreesectionunderuniformtensioneffect,throughtheanchorseatpassedtotheslopeoftheretainingstructures,earthretainingstructuresgreaterstiffness,mainlythroughtheprovisionofresistancebythemoment,isoneofthemainforcecomponents。

Soilnailingsettingsgenerallydonotimposepre—tension,butoccursinthesoilafterasmalldeformationofthepassiveforce,thesizeoftheforcealongtheunevendistributionofsoilnailextension,themiddleonbothsidesofthesmall,theroleoftheforceatthesurfacelayerthanthesmall,sprayedconcretesurfacelayerisnotamajorforcecomponents,itsroleistostabilizethesurfaceofthepartialexcavationofsoiltopreventcavinganderosion;settingdifferentdensities。

Intheboltsupportintheunitareaontheretainingboltsetthenumberofgenerallyless,foreachrootanchorconstructionaccuracyandrequirementsareverystringent。

Inthesoil-nailing,thesurfaceofsoilnailretainingalittlebitmoredensearrangementofindividualsoilnailconstructionrelativelylowaccuracyandqualityrequirements;designofdifferentlengths。

Intheboltsupport,thedesignrequirementsmustmeettherequirementsofeachrootanchorofresistance,soboltanchoragesectionrequirein-depthintothestablelayer,thedesignofalongerlength。

Insoilnailing,themoredensearrangementofsoilnail,thelargenumberofinteractionwiththesurroundingsoil,tomaintainself-reinforcedzoneofsoilstability,andresistancetooutsidetheregionreinforcedtheroleofsoilpressure,designshorterlength。

Ofcourse,therearemanytypesofbolts,therearenotpre—stressed,thelengththantheaveragesoil—nailevenshorter,butthisboltismainlyusedforthetunnelorundergroundworksofthespray-anchoronthelengththantheaveragesoil-nailisalsoisshorter,oftenonly2-4m.

     

(1)ConstructionofSoilNail           

Soilnailingisasoil—nailasamajorcomponentoftheslopeoftheforcesupportingtechnology,whichconsistsofdensesoilnailgroup,hasbeenreinforcedinsitusoil,sprayedconcretesurfacelayerandthenecessarywatersystemcomponents.

        

(2)StructuralMaterials

        Steel:

steeltypes,modelsandsizesshouldbeconsistentwithdesignrequirements,shouldadopttheH—orH—classsteelworkers,reinforcedafterthepurchaseshouldbeproperlysafeguardedtopreventcorrosion,productionshouldbetransferredstraight,rust,oilremoval,shouldbecarriedoutphysicalandmechanicalpropertiesorchemicalcompositionanalysisoftestweldingofsteel,shouldbeweldabilityandweldingqualityofthetestfordetectionofweldingmaterialstrengthshouldbegreaterthantheoverallstrength;

        Cement:

ordinaryportlandcementused,labelP032.5,ifnecessary,sulfuricacidresistantcement,aluminacementshouldnotbeused.Cementshouldcomplywiththeprovisionsoftheexistingcementstandardrequirements,theremustbeasinglefactorytestreports,qualityinspectionorders,factorycarddocuments,inaccordancewithitsvarieties,label,testnumbersetc。

,andinspectionandacceptancesamplinginspection,bytheexaminationresultsarereasonableUse.Bagsofcementshouldbeproperlykeptinstorageandtransportation,rain,moisture,stackedinacertainheightfromthegroundheapshelves,isstrictlyprohibitedanddamagethrowingthrowingbags,prohibitedtheuseofdampordifferentvarietiesofmixedcementlabel.

        Aggregate:

stoneandsandmaterial(seedsfilm,medium—finesand)shouldcheckreportcards,thestonetestmethodsandqualitystandardsbyJGJ53—92,sandmaterialtestingmethodsandqualitystandardsbyJGJ52—92。

Particlesizeoflessthan2mminthesand,sand,claycontentbyweightnotmorethan3%,theparticlesizeoflessthan12mmgravelormelontablets,claycontentbyweightnotmorethan3%。

        Mixingofwater:

thewaterwithoutaffectingthenormalcondensationofcementhardeningofharmfulimpurities,maynotcontainfat,sugarandfreeacid,etc。

;water,PHvalueislessthanfourofacidicwaterandsulfurionofmorethan1%ofthewaterweightofwaterwereshallnotbeused;theuseoftapwaterorcleanwaterformixingnaturalwatercouldbedispensedwithfortesting.

        Quick-settingagent:

quick-settingagentisusedinJ85,711,orRedStar1,shouldbespecificallyresponsibleforcontrol,addtheweightof3%oftheweightofcement,themachineautomaticallyaddedbythejet.

        Electrodes:

TheTHJ422。

        Concretemix:

Inadditiontosprayingtheconcretemixdesignstandardstobeattainedstrength,wemustalsomeetthetechnicalrequirementsofconstruction,withtheratioof1:

0.4:

2:

2(cement:

water:

sand:

melonpieces),melonseedspiecemaximumdiameterofnotm

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > PPT模板 > 中国风

copyright@ 2008-2022 冰豆网网站版权所有

经营许可证编号:鄂ICP备2022015515号-1