Chapter1General
1.General
1.1Nameofproject:
FabricationandinstallationofICtankbodyforBPZhuhaiPTA2#projectwastewatertreatmentplant
1.2Locationofproject:
inthePTA2#plantofBPZhuhaiChemicalCo.,Ltd
1.3Client:
BPZhuhaiChemicalCo.,Ltd
1.4Contractor:
PaquesEnvironmentalTechnology(Shanghai)Co.,Ltd
Scopeofwork:
FabricationandinstallationofshellbodyoftwoICreactorsof11mdiameterand24mheight;withspiralstairs;fabricationandinstallationofonecirculatingtankof6.5mdiameterand16.6mheight.
Chapter2Reference
2.Reference
2.1ConstructiondrawingdesignedbySino-pecShanghaiEngineeringCorporation
2.2DesignSpecificationofVerticalCylinderSteelWeldedStorageTankGB50341-2003
2.3CodeforconstructionandacceptanceofverticalcylindricalsteelweldedstoragetanksGB50128-2005;
2.4WeldingProcedureSpecificationofSteelPressureVesselJB4708-2000;
2.5NonDestructiveTestingofPressureVesselJB4730-94;
2.6Construction&AcceptanceSpecificationofMiddle&LowPressureChemicalEquipment
2.7SteelManholesandHandHolesHG/T21514-2005
2.8Construction&AcceptanceSpecificationofMiddle&LowPressureChemicalEquipmentHGJ209-83;
Chapter3Constructionsequence
3.Constructionsequence
Chapter4ConstructionPreparation&Method
4.ConstructionPreparationandConstructionMethod
4.1ConstructionPreparation
4.1.1Constructiontechnicalpreparation
(1)Siteassemblyweldingofreactorshallbeprovidedwiththefollowingtechnicaldocuments:
ØDesignconstructiondrawings;
ØWeldingprocedurespecificationreportandweldingprocessregulations;
ØConstructionmethod
ØConstruction&acceptancecodeandspecification.
(2)Organizetechnicalpersonneltoperformjoint-checkofdrawingsbeforeassemblyofreactor.
(3)Organizetechnicalclarificationforworkteambeforeconstructiontospecifyworkcharacteristic,constructionprogress,constructionmethod,technicalrequirements,andqualitystandardandsafetymeasures.
4.1.2Constructionsitepreparation
(1)Constructionsiteisproposedtobearrangedaccordingtoconstructionplotplan(Attachment1).Assemblyweldingplatformandconstructionequipmentshallbeplacedtodesignatedposition.
(2)Constructionequipment&toolsmustbewithreliablecapability;toolsandfixtures,templeshouldbequalified.Measuringinstrumentsshallbewithininspectionperiod.
(3)Theelectricalpowersupplyforconstructionisrequirednotlessthan150Kw.
(4)Thewatersupplyforwatertestoftankbodyisrequirednotlessthan50m3/hr.
4.1.3Materialacceptance
(1)Steelplate,SSplate,sectionsteelandaccessoriesusedfortheworkshallconformtodesignrequirement,requirementsinCarbonStructuralSteelandLowAlloySteelHotRolledSteelThickPlateandSteelBandGB3274-88,CarbonStructuralSteelandLowAlloySteelHotRolledThinSteelPlateandSteelBandGB912-89.PerformmaterialreceivinginspectionaccordingtoProcurementProcedureQG205-2001.
(2)Allmaterialsandaccessoriesshallbewithmanufacturer’squalitycertification.Iffailuretomeetthis,materialsandaccessoriesshallbere-checkedandqualifiedbeforeusing.
(3)Platestobeusedmustbecarriedwithappearanceinspectionbeforeusing.
(4)Checksteelmaterialsforquality,sizeandplatesforstraightnessbeforeusing.
(5)Acceptanceofweldingmaterial
ØWeldingrodmustbewithqualitycertificate,completepackagebeforewarehousing.
ØWeldingrodqualitycertificationshallincludetype,band,size,manufactureranddateofproduction.
(6)Contentsofweldingwirequalitycertificationshallinclude:
ØGradeofsteel,batchNo.,size,weight,manufactureranddateofproduction;
(7)Purityofargoncannotbelow99.9%;
(8)SSmaterialsandCSmaterialsshallbestoredseparatelyonsite.SSmaterialscannotbecontactedwithCSmaterialsduringconstruction.
4.2Constructionmethod
4.2.1Accordingtoexternaldimensionsandweightofequipmentandforsakeofsafety,ICreactorfortheprojectshallbeinstalledbyreversemethodbyhydraulicliftingdevice.i.e.firstlaybottomplatesofreactoronthefoundationandtightenwithclamp,thensetoutdatumlineoftankwall.Accordingtothedatumlineoftankwall,assemblyandweldthefirstbandplate.Afterweldingthestraightseam,lifttheunitbyhydraulicjack,liftthefirstbandplatetothesameheightofsecondbandplate.Afterassemblyandwelding,reverseaholeattheoutersideofthesecondbandplate,liftinordertillcompletionofassemblyofthetank.Whenassemblythelastbandplate.Leaveaplatenottobeassembledwhenassemblingthelastbandplatewhereshallbetheaccessforthemanpowerandmaterials.
4.2.2Processcharacteristicofreverseinstallationbyhydraulicliftingmethod
(1) Reverseinstallationbyhydraulicjackandspecialliftingdevicecanreducehighworkandscaffolding.
(2) Nosealingfortankbody,smallbindingforceandfrictionforce,canusesingleplateinstallation,convenientforpassinginandoutofpersonandmaterials,communication,ventilationanddusting.
(3) Equipmentcanbecirculatingusedandcombinedfreelyaccordingtosizeoftank.
(4) Hydrostaticdriveisstableandwithcontrollability.Liftingspeed,heightandsynchronismcanbeensuredeasily.Bearingcapacityofhydraulicjackshallbeadjustedthroughchangeoilpressure.
(5)Duringliftingoftankshell,tankofbodyshouldbefixedwithfourwireropestoensuresafetyoftankconstruction.
4.3PrefabricationofICreactor
4.3.1Prefabricationofbottomplate(TheplotplanofbottomplaterefertoFigure1-2)
(1)Bottomplatesorreactorshallbearrangedaccordingtoactualdeliveryconditionsofmaterial.Cuttingshallbeperformedafterapprovalbyconcernedunit.Tocompensateweldingseamcontraction,thediameterofarrangementofbottomplatesshallbe1‰~1.5‰morethandesigndiameter.
(2)BottomplatesshalladoptbuttweldingseamandVtypegroove.
(3)
Allowablesizedeviationofbottomplateedgeofreactorshallmeetthefollowingrequirements,shownasthefollowingfigure:
AB、Cdallowabledeviation:
±2mm
AC、BD、Efallowabledeviation:
±2mm
Diagonalallowabledeviation:
≤3mm
(4)Theminimumsizealongradiusdirectionofbottomplateedgeshallnotbelessthan700mm,buttjointsofarcedgeplateshalladoptunequalclearance:
6-7mmforoutsideand8-12mmforinside.
(5)Widthofmiddleplateshallnotbelessthan1000mmandlengthshallnotbelessthan2000mm.
(6)Camberedplatewiththethickness≥12mmshallbeinspectedwithin100mmofbothsidesasperUltrasonicFlawDetectionofSteelPlateUsedforPressureEquipmentZBJ74003-88,inspectionresultshallachievestandardofgradeIII,Ifadoptingflaretocuttheslope,thesurfaceofslopeshallbeinspectedbymagneticorpenetration.
4.3.2Prefabricationofshellplate(Plotplayofshellplatereferstofigure2)
(1)Widthofshellplateshallnotbelessthan500mmandlengthshallnotbelessthan1000mm.
(2)Incaseofwidthchangeofshellplate,thicknessofeachringofshellplateshallnotbelessthanthicknessandmaterialrequirementstorelevantheightindesignregulations.
(3)Longitudinalweldingseamofeachringofplateshallbestaggeredfor1/3ofplatelengthalongthesamedirectionandnotbelessthan500mm.
(4)Prefabricationofshellplateshallbeperformedaspernetsize,perimeterofeachringofplateshallbecalculatedasfollows:
L=2π(innerradius+wallthickness)+numbersofallsteelplates×(amountofweldingcontraction–assemblyclearance)
(5)Deviationofshellplateafterprocessingshallmeetthefollowingtable:
AEB
CFD
Measuringposition
PlatelengthAB(CD)>10m
PlatelengthAB(CD)≤10m
WidthAC、BD、EF
±1.5
±1
LengthAB、CD
±2
±1.5
Differenceofdiagonal
≤3
≤2
Straightness
AC、BD
≤1
≤1
AB、CD
≤2
≤2
(6)Placeshellplateontheplatebendingmachineforrollingaftercutting.Keeptwoendsofshellplatelevelandstraightbeforepre-bending.Prepressthefrontendofshellplatefor150-200mm(incaseofdirectrollingandpressing,150-200mmoftwoendsofshellplatecannotbepressedtobend),therollandpressofshellplateasperrequiredcamber.Inadoptinghydraulicbendingandforming,itshallbeperformed2-3timestoremoveinternalstress.
(7)Shellplateshallbeplacedonplatformandinspectedwithtemplateafterrollinground,withstraightlinetemplateinverticaldirection,itsclearanceshallnotbemorethan2mm,witharctemplateinhorizontaldirectionanditsclearanceshallnotbemorethan4mm.Chordlengthoftemplateshallbe≥1.5m.
(8)Shellplateshallbeplacedontiretoavoiddeformationafterprefabrication.
4.4AssemblyofICreactor
4.4.1Foundationacceptance
(1)ICreactormustbeperformedwithfoundationsurfacesizeinspectionbeforeinstallationaccordingtocivilfoundationdesignandregulationsinConstruction&AcceptanceSpecificationofMediumandLowPressureChemicalEquipment–HGJ209IC.
(2)Thesurfaceofasphaltsandoffoundationshallbelevelandclosewithoutanyprotrusion,depressedandpenetratedcrack.Convexandconcaveofasphaltsurfaceshallbeinspectedaccordingtothefollowingmethod:
Whenthediameteroftankislessthan25m,drawthelineandmeasurefromthefoundationcentertoaroundoffoundation.Thequantityofmeasurementpointsper100m2forfoundationsurfaceshallnotbelessthan10.(Thearealessthan100m2shallbecalculatedas100m2.).convexandconcaveoffoundationsurfaceshallnotbemorethan25mm.
4.4.2Assemblyweldingoftankbottom
(1)Steelplateshallbede-rustedandpaintedaccordingtodesignrequirementsbe