Chapter1General

1.General

1.1Nameofproject:

FabricationandinstallationofICtankbodyforBPZhuhaiPTA2#projectwastewatertreatmentplant

1.2Locationofproject:

inthePTA2#plantofBPZhuhaiChemicalCo.,Ltd

1.3Client:

BPZhuhaiChemicalCo.,Ltd

1.4Contractor:

PaquesEnvironmentalTechnology(Shanghai)Co.,Ltd

Scopeofwork:

FabricationandinstallationofshellbodyoftwoICreactorsof11mdiameterand24mheight;withspiralstairs;fabricationandinstallationofonecirculatingtankof6.5mdiameterand16.6mheight.

Chapter2Reference

2.Reference

2.1ConstructiondrawingdesignedbySino-pecShanghaiEngineeringCorporation

2.2DesignSpecificationofVerticalCylinderSteelWeldedStorageTankGB50341-2003

2.3CodeforconstructionandacceptanceofverticalcylindricalsteelweldedstoragetanksGB50128-2005;

2.4WeldingProcedureSpecificationofSteelPressureVesselJB4708-2000;

2.5NonDestructiveTestingofPressureVesselJB4730-94;

2.6Construction&AcceptanceSpecificationofMiddle&LowPressureChemicalEquipment

2.7SteelManholesandHandHolesHG/T21514-2005

2.8Construction&AcceptanceSpecificationofMiddle&LowPressureChemicalEquipmentHGJ209-83;

Chapter3Constructionsequence

3.Constructionsequence

Chapter4ConstructionPreparation&Method

4.ConstructionPreparationandConstructionMethod

4.1ConstructionPreparation

4.1.1Constructiontechnicalpreparation

(1)Siteassemblyweldingofreactorshallbeprovidedwiththefollowingtechnicaldocuments:

ØDesignconstructiondrawings;

ØWeldingprocedurespecificationreportandweldingprocessregulations;

ØConstructionmethod

ØConstruction&acceptancecodeandspecification.

(2)Organizetechnicalpersonneltoperformjoint-checkofdrawingsbeforeassemblyofreactor.

(3)Organizetechnicalclarificationforworkteambeforeconstructiontospecifyworkcharacteristic,constructionprogress,constructionmethod,technicalrequirements,andqualitystandardandsafetymeasures.

4.1.2Constructionsitepreparation

(1)Constructionsiteisproposedtobearrangedaccordingtoconstructionplotplan(Attachment1).Assemblyweldingplatformandconstructionequipmentshallbeplacedtodesignatedposition.

(2)Constructionequipment&toolsmustbewithreliablecapability;toolsandfixtures,templeshouldbequalified.Measuringinstrumentsshallbewithininspectionperiod.

(3)Theelectricalpowersupplyforconstructionisrequirednotlessthan150Kw.

(4)Thewatersupplyforwatertestoftankbodyisrequirednotlessthan50m3/hr.

4.1.3Materialacceptance

(1)Steelplate,SSplate,sectionsteelandaccessoriesusedfortheworkshallconformtodesignrequirement,requirementsinCarbonStructuralSteelandLowAlloySteelHotRolledSteelThickPlateandSteelBandGB3274-88,CarbonStructuralSteelandLowAlloySteelHotRolledThinSteelPlateandSteelBandGB912-89.PerformmaterialreceivinginspectionaccordingtoProcurementProcedureQG205-2001.

(2)Allmaterialsandaccessoriesshallbewithmanufacturer’squalitycertification.Iffailuretomeetthis,materialsandaccessoriesshallbere-checkedandqualifiedbeforeusing.

(3)Platestobeusedmustbecarriedwithappearanceinspectionbeforeusing.

(4)Checksteelmaterialsforquality,sizeandplatesforstraightnessbeforeusing.

(5)Acceptanceofweldingmaterial

ØWeldingrodmustbewithqualitycertificate,completepackagebeforewarehousing.

ØWeldingrodqualitycertificationshallincludetype,band,size,manufactureranddateofproduction.

(6)Contentsofweldingwirequalitycertificationshallinclude:

ØGradeofsteel,batchNo.,size,weight,manufactureranddateofproduction;

(7)Purityofargoncannotbelow99.9%;

(8)SSmaterialsandCSmaterialsshallbestoredseparatelyonsite.SSmaterialscannotbecontactedwithCSmaterialsduringconstruction.

4.2Constructionmethod

4.2.1Accordingtoexternaldimensionsandweightofequipmentandforsakeofsafety,ICreactorfortheprojectshallbeinstalledbyreversemethodbyhydraulicliftingdevice.i.e.firstlaybottomplatesofreactoronthefoundationandtightenwithclamp,thensetoutdatumlineoftankwall.Accordingtothedatumlineoftankwall,assemblyandweldthefirstbandplate.Afterweldingthestraightseam,lifttheunitbyhydraulicjack,liftthefirstbandplatetothesameheightofsecondbandplate.Afterassemblyandwelding,reverseaholeattheoutersideofthesecondbandplate,liftinordertillcompletionofassemblyofthetank.Whenassemblythelastbandplate.Leaveaplatenottobeassembledwhenassemblingthelastbandplatewhereshallbetheaccessforthemanpowerandmaterials.

4.2.2Processcharacteristicofreverseinstallationbyhydraulicliftingmethod

(1) Reverseinstallationbyhydraulicjackandspecialliftingdevicecanreducehighworkandscaffolding.

(2) Nosealingfortankbody,smallbindingforceandfrictionforce,canusesingleplateinstallation,convenientforpassinginandoutofpersonandmaterials,communication,ventilationanddusting.

(3) Equipmentcanbecirculatingusedandcombinedfreelyaccordingtosizeoftank.

(4) Hydrostaticdriveisstableandwithcontrollability.Liftingspeed,heightandsynchronismcanbeensuredeasily.Bearingcapacityofhydraulicjackshallbeadjustedthroughchangeoilpressure.

(5)Duringliftingoftankshell,tankofbodyshouldbefixedwithfourwireropestoensuresafetyoftankconstruction.

4.3PrefabricationofICreactor

4.3.1Prefabricationofbottomplate(TheplotplanofbottomplaterefertoFigure1-2)

(1)Bottomplatesorreactorshallbearrangedaccordingtoactualdeliveryconditionsofmaterial.Cuttingshallbeperformedafterapprovalbyconcernedunit.Tocompensateweldingseamcontraction,thediameterofarrangementofbottomplatesshallbe1‰~1.5‰morethandesigndiameter.

(2)BottomplatesshalladoptbuttweldingseamandVtypegroove.

(3)

Allowablesizedeviationofbottomplateedgeofreactorshallmeetthefollowingrequirements,shownasthefollowingfigure:

AB、Cdallowabledeviation:

±2mm

AC、BD、Efallowabledeviation:

±2mm

Diagonalallowabledeviation:

≤3mm

(4)Theminimumsizealongradiusdirectionofbottomplateedgeshallnotbelessthan700mm,buttjointsofarcedgeplateshalladoptunequalclearance:

6-7mmforoutsideand8-12mmforinside.

(5)Widthofmiddleplateshallnotbelessthan1000mmandlengthshallnotbelessthan2000mm.

(6)Camberedplatewiththethickness≥12mmshallbeinspectedwithin100mmofbothsidesasperUltrasonicFlawDetectionofSteelPlateUsedforPressureEquipmentZBJ74003-88,inspectionresultshallachievestandardofgradeIII,Ifadoptingflaretocuttheslope,thesurfaceofslopeshallbeinspectedbymagneticorpenetration.

4.3.2Prefabricationofshellplate(Plotplayofshellplatereferstofigure2)

(1)Widthofshellplateshallnotbelessthan500mmandlengthshallnotbelessthan1000mm.

(2)Incaseofwidthchangeofshellplate,thicknessofeachringofshellplateshallnotbelessthanthicknessandmaterialrequirementstorelevantheightindesignregulations.

(3)Longitudinalweldingseamofeachringofplateshallbestaggeredfor1/3ofplatelengthalongthesamedirectionandnotbelessthan500mm.

(4)Prefabricationofshellplateshallbeperformedaspernetsize,perimeterofeachringofplateshallbecalculatedasfollows:

L=2π(innerradius+wallthickness)+numbersofallsteelplates×(amountofweldingcontraction–assemblyclearance)

(5)Deviationofshellplateafterprocessingshallmeetthefollowingtable:

AEB

CFD

Measuringposition

PlatelengthAB(CD)>10m

PlatelengthAB(CD)≤10m

WidthAC、BD、EF

±1.5

±1

LengthAB、CD

±2

±1.5

Differenceofdiagonal

≤3

≤2

Straightness

AC、BD

≤1

≤1

AB、CD

≤2

≤2

(6)Placeshellplateontheplatebendingmachineforrollingaftercutting.Keeptwoendsofshellplatelevelandstraightbeforepre-bending.Prepressthefrontendofshellplatefor150-200mm(incaseofdirectrollingandpressing,150-200mmoftwoendsofshellplatecannotbepressedtobend),therollandpressofshellplateasperrequiredcamber.Inadoptinghydraulicbendingandforming,itshallbeperformed2-3timestoremoveinternalstress.

(7)Shellplateshallbeplacedonplatformandinspectedwithtemplateafterrollinground,withstraightlinetemplateinverticaldirection,itsclearanceshallnotbemorethan2mm,witharctemplateinhorizontaldirectionanditsclearanceshallnotbemorethan4mm.Chordlengthoftemplateshallbe≥1.5m.

(8)Shellplateshallbeplacedontiretoavoiddeformationafterprefabrication.

4.4AssemblyofICreactor

4.4.1Foundationacceptance

(1)ICreactormustbeperformedwithfoundationsurfacesizeinspectionbeforeinstallationaccordingtocivilfoundationdesignandregulationsinConstruction&AcceptanceSpecificationofMediumandLowPressureChemicalEquipment–HGJ209IC.

(2)Thesurfaceofasphaltsandoffoundationshallbelevelandclosewithoutanyprotrusion,depressedandpenetratedcrack.Convexandconcaveofasphaltsurfaceshallbeinspectedaccordingtothefollowingmethod:

Whenthediameteroftankislessthan25m,drawthelineandmeasurefromthefoundationcentertoaroundoffoundation.Thequantityofmeasurementpointsper100m2forfoundationsurfaceshallnotbelessthan10.(Thearealessthan100m2shallbecalculatedas100m2.).convexandconcaveoffoundationsurfaceshallnotbemorethan25mm.

4.4.2Assemblyweldingoftankbottom

(1)Steelplateshallbede-rustedandpaintedaccordingtodesignrequirementsbe