某医院消防工程技术标投标文件.docx
《某医院消防工程技术标投标文件.docx》由会员分享,可在线阅读,更多相关《某医院消防工程技术标投标文件.docx(14页珍藏版)》请在冰豆网上搜索。
某医院消防工程技术标投标文件
某医院消防工程技术标投标文件
(此文档为word格式,下载后你可任意修改编辑)
目录
第一章综合编制说明········································································································3
第二章工程概况··············································································································4
第一节工程概述··············································································································4
第二节系统概述··············································································································5
第三节工程应用的技术文件·······························································································7
第三章施工管理目标及各项管理措施···················································································8
第一节施工组织管理········································································································8
第二节技术保证措施······································································································15
第三节进度计划及工期保证措施·······················································································16
第四节质量保证体系及质量保证措施·················································································21
第五节安全生产保证措施································································································26
第六节文明施工保证措施································································································27
第七节消防保卫措施······································································································29
第四章施工条件及施工准备·····························································································30
第一节施工条件:
·········································································································30
第二节施工准备············································································································30
第五章施工部署和项目部的管理·······················································································31
第一节项目部的管理······································································································31
第二节施工部署············································································································32
第三节施工顺序············································································································32
第四节工期控制············································································································33
第六章材料供应及工期保证措施·······················································································33
共63页
第七章主要项目施工方法································································································35
第一节系统原理及控制过程·····························································································35
第二节主要工艺流程······································································································35
第三节工程施工程序······································································································36
第四节火灾报警及联动控制系统施工方法···········································································36
第五节喷淋系统施工方法································································································42
第六节消火栓系统施工方法·····························································································48
第八章安全文明施工及现场环保措施·················································································50
第九章降低成本提高科技含量的措施·················································································50
第十章消防系统调试······································································································51
第一节消防水系统调试···································································································51
第二节自动水喷淋系统调试·····························································································52
第三节火灾自动报警系统的调试·······················································································52
第四节系统联合调试······································································································53
第五节调试前的准备······································································································54
第六节报警控制系统的联动调试·······················································································54
第七节开通调试············································································································55
第八节系统运行············································································································55第十一章雨季及特殊天气的施工方案·················································································55第十二章系统验收及竣工资料··························································································56第十三章工程竣工后服务································································································59
第一节工程保修············································································································59
第二节提供操作和维修保养手册·······················································································61
第三节提供培训············································································································62第十四章附表、附图······································································································64
第一节临时用地表·········································································································64
第二节劳动力安排计划表································································································65
共63页
第一章综合编制说明
1、烟台市建筑设计研究股份有限公司设计的xx市人民医院改扩建项目消防工程招标图纸。
2、建设单位下发的“xx市人民医院改扩建项目工程消防设备供应及安装”招标文件及招标答疑文件。
3、国家颁布的有关建筑安装工程消防系统施工工艺规程及施工方法,施工验收规范、规程、规定及质量验评标准。
3.1《建筑设计防火规范》(GBJ/16-87)(2006年版)
3.2《民用建筑电气设计规范》(JGJ/T16-92)
3.3《火灾自动报警系统设计规范》(GB50116-98)
3.4《消防联动控制设备通用技术条件》(GB16806-97)
3.5《电气装置安装工程-接地装置施工及验收规范》(GB50169-92)
3.6《建筑电气工程施工质量验收规范》(GB50303-2002)
3.7《建筑设备施工安装通用图集》(91SB)
3.8《建筑电气通用图集》(92DQ)
3.9《火灾自动报警系统施工及验收规范》(GB50166-92)
3.10《机械设备安装工程施工及验收规范》(GB50231-98)
共63页
3.11《建筑设备安装分项工程施工工艺标准》(第二版)(北京建工集团总公司)
3.12《建筑电气工程施工质量验收规范》(GB50303-2002)
3.13《建筑工程施工质量验收统一标准》(GB50300-2002)
4、建筑工程资料管理规程DBJ01-51-2003。
5、我公司认证的ISO9001“质量保证标准”体系文件(质量管理手册及程序文件)。
6、其它现行有效的国家规范及行业标准。
7、本公司以往承建同类工程技术资料。
第二章工程概况
第一节工程概述
传染病房楼:
本工程建筑面积约为5435平方米,地上5层,首层高4.5米,2~5层高3.6米,建筑总高度为18.9米,室外高差为0.4米。
门诊楼:
本工程分一期、二期工程,1~10轴为一期工程,建筑面积约29145平方米,10~16轴为二期工程,建筑面积约11698平方米。
本工程地上6层,顶层为设备层,首层层高为4.5米,二层层高为4.8米,三~六层层高为4.5米,总建筑高度为27.3米,室外高差为0.4米。
病房楼:
本工程分一期、二期工程,1~12轴为一期工程,建筑面积约35627平方米,12~18轴为二期工程,建筑面积约9842平方米。
本工程地下一层,建筑面积约
2200平方米,扣除制冷机房、水池等非人防区,防空地下室建筑面积约1800平方米,耐火等级地下人防为一级。
地上13层,顶层为设备层,建筑高度约45.75米。
屋顶水箱置于病房楼屋顶,屋顶水箱间内设高位消防水箱,高位消防水箱消防有效容积不小于18立方米,生活、消防水泵房在室内地下,消防水池为原有地下水池,有效容积1200立方米,水池池壁做防腐处理,池水自洁式消毒器防止二次污染,新建生活水箱100吨,泵房新增加消火栓泵两台,喷淋泵两台,高区生活泵两台。
共63页
第二节系统概述
1、自动水喷淋系统
本工程分传染病房楼、门诊楼一二期、病房楼一二期,自动喷水灭火系统由病房楼地下一层消防泵房供水,喷淋稳压系统设置在病房楼屋顶水箱间内。
病房楼地下一层消防水泵房设置两台喷淋主泵,一备一用,水泵型号为XDB8/30-125D/4Q=30L/SH=80N=37KW;病房楼地下一层内设置7台DN150湿式报警阀;门诊楼首层设置4台DN150ZSS型湿式报警阀,2台DN150的预作用报警阀及配套空压机;传染病房楼首层设置1台DN150ZSS型湿式报警阀。
病房楼屋顶设置一套型号L*B*H=4M*3M*2M,V=24立方组合式消防不锈钢水箱,一套型号为LDW3.6-8*5Q=1L/SH=34MN=1.5KW的增压稳压设备,一台型号Φ1200*2700的气压罐(带安全阀压力表等附件)。
除门诊楼二期采用2台预作用喷淋系统外,病房楼一二期、门诊楼一期、传染病房楼均采为湿式喷淋系统,并在每个防火分区内配置了水流指示器、信号蝶阀和末端试水装置。
在有吊顶房间采用装饰型68℃玻璃球喷淋头,无吊顶房间采用直立型68℃玻璃球喷淋头,洁净走廊、ICU、无菌室采用68℃隐蔽型喷淋头,病房、诊室必须采用68℃快速响应喷淋头。
传染病房楼、门诊楼一二期、病房楼一二期室外各设两套地下式水泵接合器,与自动喷水泵出水管相连。
各层均按严重危险级A类配置灭火器。
2、室内消火栓给水系统
本工程室内消火栓灭火系统由病房楼地下一层消防泵房供水,室内消火栓稳压系统设置在病房楼屋顶水箱间内。
病房楼地下一层消防水泵房设置两台消火栓水泵,一备一用,水泵型号为XDB8/30-125D/4Q=30L/SH=80N=37KW。
屋顶设置一套型号L*B*H=4M*3M*2M,V=24立方组合式消防不锈钢水箱,一套型号为LDW3.6-8*5Q=1L/SH=34MN=1.5KW的增压稳压设备,一台型号Φ1200*2700的气压罐(带安全阀压力表等附件)。
共63页
传染病房楼、门诊楼、病房楼楼内均设置消火栓箱,消火栓箱采用带灭火器箱组合式消防柜(丙型)。
传染病房楼、门诊楼一二期、病房楼一二期室外各设两套地下式水泵接合器,与消火栓给水管网相连。
3、消防报警和消防联动系统
本工程消防保护等级为一级,本系统包括:
火灾自动报警系统、消防联动控制系统、消防广播系统、消防专用电话系统。
消防集中报警器设置于病房楼首层消防控制室内,传染病房楼值班室设置区域报警器;门诊楼一二期,传染病房楼所有消防联动系统引至病房楼首层消防控制室。
主要设备选型:
包括消防报警控制器、联动控制柜、联动电源、广播主机、消防电话主机、各种类信号模块、探测器、按钮等设备。
4、防火门与防火卷帘门
本工程防火门设在防烟楼梯间、有设防火门要求的封闭楼梯间、消防前室防火分区的防火墙封闭楼梯间、手术室等部位。
本工程病房楼、门诊楼、传染病房楼用于防火隔离的卷帘门为一步落下,由其一侧或两侧的感烟探测警自动控制,用于通道上的卷帘门分两步落下、由其两侧的感烟,感温探测自动控制,卷帘门的动作信号要送至消防控制室,疏散通道上的防火卷帘两侧设置警报装置,两侧设置手动控制按钮,卷帘门应设有熔片装置及断电后的手动装。
5、漏电火灾报警系统
本工程设漏电火灾报警系统,病房楼、门诊楼的每层都各设一台漏电报警控制器BHTK-1000D/12,8然后由漏电报警控制柜BHTK-1000B控制。
探测漏电电流、过电流等信号,发出声光信号报警,准确报出故障线路地址,监视故障点的变化,储存各种故障和操作试验信号,信号存储时间不少于12个月,能切断漏电线路上的电源,并显示系统电源状态。
共63页
第三节工程应用的技术文件
xx市人民医院改扩建项目消防工程的施工、调试、验收测试工作,应严格遵循以下的国家及地方政府颁布的有关规范标准以及相关技术文件执行。
1、我国现行的规程、规范、标准及图集
1.1《建筑设计防火规范》GB50016-2006
1.2《高层民用建筑设计防火规范》(2001版)GB50045-95
1.3《建筑灭火器配置设计规范》1997版GBJl40-90
1.4《火灾自动报警系统设计规范》GB50116-98
1.5《火灾报警控制器通用技术条件》GB4717-93
1.6《消防联动控制设备适用技术条件》GB16806-97
1.7《火灾显示盘通用技术条件》GB17429-1998
1.8《现场设备、工业营造焊接工程施工及验收规范》GB50236-98
1.9《自动喷水灭火系统设计规范》GB50084-2001
1.10《火灾自动报警系统施工及验收规范》GB50166-92
1.11《建筑给水排水设计规范》1997版GBJ15-88
1.12《采暖通风与空气调节设计规范》(2001版)GB119-87
1.13《建筑给水、排水及来援工程施工质量验收规范》GB50242-2002
1.14《压缩机、风机、泵安装工程施工及验收规范》GB50275-98
1.15《建筑设备施工安装通用图集》91SB
1.16《建筑电气施工安装通用图集》92DQ
1.17《建筑电气安装工程施工及验收标准》GB50303-2002
1.18《建筑工程施工质量验收统一标准》GB50300-2001
1.19《建筑灭火器配置设计规范》GBJ140-90
共63页
相关规定及要求
满足设计院对本项目消防系统的总体设计要求
2、我国现行的安全生产、文明施工、环保及消防等有关规定
第三章施工管理目标及各项管理措施
第一节施工组织管理
1、管理人员组织
科学合理的管理体制、统一有效的工程指挥系统是顺利施工的重要保证,为此本工程将精干力量,组建本工程项目管理班子见图3.1。
明确工程管理机构职能和各岗位管理人员的职责。
施工管理组织机构图(图3.1)
共63页
表3.1项目部主要人员组成表
1.1项目部职能
工程管理机构要通过五项职能的行使,对本工程进行有效的管理,树立良好的企业形象,更好的为业主服务,达到业主满意。
1.1.1指挥职能
共63页
工程管理机构应根据业主、监理的要求,结合消防工程的特点,对工程进行全面的统筹,制订切实可行的计划,建立健全各项规章制度,保证指挥的有效性。
同时应根据工程不同阶段的特点,做出科学合理的决策,保证指挥的正确性。
1.1.2指导职能
工程管理机构应根据合约的规定,按照政府相关部门、甲方、监理的要求,对工程的施工工艺、标准、规范的执行方面进行指导:
对选用的材料、设备以及有关业务流程等方面进行指导,使工程有条不紊的进行。
1.1.3组织职能
本工程涉及到多个单体的消防系统安装,因此工程管理机构必须根据工程各方面的要求,组织好所涉及的施工队伍,以保证工程施工目标的