DL 51906 电力建设施工技术规范 第6部分 水处理及制氢设备和系统英文.docx
《DL 51906 电力建设施工技术规范 第6部分 水处理及制氢设备和系统英文.docx》由会员分享,可在线阅读,更多相关《DL 51906 电力建设施工技术规范 第6部分 水处理及制氢设备和系统英文.docx(55页珍藏版)》请在冰豆网上搜索。
![DL 51906 电力建设施工技术规范 第6部分 水处理及制氢设备和系统英文.docx](https://file1.bdocx.com/fileroot1/2022-12/14/7561a586-c774-4d28-9c23-5efd5e650772/7561a586-c774-4d28-9c23-5efd5e6507721.gif)
DL51906电力建设施工技术规范第6部分水处理及制氢设备和系统英文
DL5190.6-2012
TechnicalSpecificationforThermalPowerErectionandConstruction
Part6:
WaterTreatmentandHydrogenGenerationEquipmentSystem
Contents
1Generalprovisions.............................................................4
2Terms...................................................................................4
3Basicrequirement..............................................................6
3.1Generalrequirement........................................................6
3.2Constructionengineering.................................................7
3.3Inspectionandstorageofequipmentandmaterials.........8
3.4Leaktestofequipmentandsystem..................................9
3.5GreenConstruction.........................................................10
4Waterpretreatmentequipment.........................................11
4.1Conventionalequipment..................................................11
4.2Ultrafiltrationandmicrofiltrationequipment..................15
4.3Wastewaterdisposalequipment.......................................16
5Waterpre-demineralizationequipment............................17
5.1Reverseosmosisunit........................................................17
5.2Seawaterdesalinationandevaporationequipmentand
thermalcompressionandjettingequipment.....................20
5.3Stainlesssteelequipmentandpipelineprotection............22
6Boilerfeedwatertreatmentequipment.............................23
6.1Ionexchangeequipment..................................................23
6.2Carbondioxideremovaldevice........................................25
6.3Electricdeionizationdevice..............................................25
7Condensatedwaterprocessingequipment........................26
7.1Generalrequirement.........................................................26
7.2Filters................................................................................27
7.3Ionexchangersandregenerationdevice...........................27
8Coolingwatertreatmentequipment...................................27
8.1Sterilizationdevice............................................................27
8.2Scaleandrustinhibitiondevice.........................................29
8.3Makeupwaterandby-passflowtreatmentequipment......29
9Samplinganddosingsystem................................................30
10Boxes,drumsandtanks......................................................33
11Rotatingmachineryandotherequipment.........................34
11.1Hydratedlimemachinesandlimecrane...........................34
11.2Watertreatmentpumps......................................................34
11.3Aircompressorsandaccessoried.......................................37
11.4Agitators.............................................................................39
12Specialpipingandvalves......................................................39
12.1Generalrequirement...........................................................39
12.2Specialmediapipeline........................................................40
12.3Pipemadeofspecialmaterials............................................41
12.4Specialvalves.....................................................................45
13Anticorrosiveconstruction....................................................45
13.1Generalrequirement...........................................................45
13.2Anticorrosiveconstructionprocess.....................................46
13.3Constructionofplastics.......................................................49
14Startupandadjustmentofwatertreatmentsystem............51
14.1Generalrequirement............................................................51
14.2Waterpretreatmentandpre-demineralizationsystem.........51
14.3Desalinationsystem............................................................54
14.4Condensatetreatmentsystem..............................................54
15Hydrogenstation.....................................................................55
15.1Generalrequirement.............................................................55
15.2Inspectionandinstallationofequipmentinhydrogen..........56
15.3Inspectionandinstallationofpipinginhydrogen................57
15.4Startupandadjustmentofhydrogengenerationequipment..60
1Generalprovisions
1.0.1Thistechnicalspecificationiscompiledforconstructionofwatertreatmentandhydrogengenerationequipment.
1.0.2Thispartapplytonew-build,extensionandrebuildwatertreatmentandhydrogengenerationequipmentandsystemof1000MWandunder1000MWthermalpowerplant,cyclegas-steamturbineunits,conventionalislandofnuclearpowerstationandBOPsystem.
1.0.3Watertreatmentandhydrogengenerationequipmentandsystemconstructionmeetthepartandrelevantprovisionsofnationalstandardsandcurrentstandards.
2Terms
2.0.1Waterpretreatment
Processingwaterbyprecipitation,coagulationandclarification.
2.0.2Clarification
Producewaterwithlittleparticlesbyprecipitationofsuspendedparticlesinlargetank.
2.0.3Filtration
Removeparticlesbypassingfitterstrainer.
2.0.4Ultrafiltration
Ultrafiltrationisinbetweenmicrofiltrationandnanofiltration.Thetypesincludevacuumandpressure.
2.0.5Microfiltration
Microfiltrationisinbetweengeneralfilterandultrafiltration,filteringrecisionbetween0.1μmand1.0μm.
2.0.6Reverseosmosis
Wedoforciblyhigherthantheosmoticpressureofthesolutionatthesideofthemembrane,thatisthesideofrawwater,allowingwaterandsomecomponentsselectivetransmission,andothermaterialcan'tthroughthemembrane.
2.0.7Recycledwater
Wastewatercanbeusedafterpropertreatment,ofwhichqualityisinaccordancewithstandard.
2.0.8Wastewater
Thewaterdischargedwhichfrompowerplant,thewatercanbeusedaftertreatment.
2.0.9Tightnesstestwithvacuumbox
Themethodofcheckingleakforweldingofwatertankbaseplatewithvacuumbox.
2.0.10Lowtemperaturemulti-effectdistillationunit(LT-MED)
UsethespraAniongtechnologyoflowtemperaturehorizontaltubefordistillation,ofwhichmaximumtemperatureofsaltwaterlessthan70℃.
2.0.11Desalination
Theprocessofremovingthesaltinthewater,desaltedwatercanbeusedofdrinkingwater,productionwatersupplyandcoolingwater.
2.0.12Electrodeionization
Inthefreshwatercompartmentofelectrodialyzerfillinganionandcationmixedionexchangeresin,combiningelectrodialysisandionexchange,removeioninwater,makeuseofpolarizationphenomenonintheprocessofelectrodialysis,doelectrochemicalregenerationforionexchangeresin.
2.0.13Ionexchange
Theprocessofsomeanionorcationinwaterthroughthefilterbed.
2.0.14Perforated-steelandplasticcompositepipe
Perforated-steelandplasticcompositepipeisreinforcementofporoussheetsteelpipethroughhydrogenarcwelding.Anewcompositepipeoftwo-sidedcompositethermoplasticplastics.
2.0.15Electricalfusionbellandspigotconnection
Aconnectionmethodthatconnectedpipeinsertedintomuzzlebellandcontactareaofmuzzlebelltogetherbyfusionwelding,makeuseofGreatheatproducedbyelectricalheatingelementinsertedintoinnerwallofmuzzlebellwithelectricity.
2.0.16Stainlesssteellinedcompositesteelpipe
Adoptingcompoundtechnology,steelpipeusedforfluidtransport,suchasweldedpipe,seamlesspipe,ect,theirinnerwallliningwithstainlesssteelanticorrosivelayer,whichmakeupCompositestructurewallpipe.
2.0.17Electrolysisthesaltsolution
ElectrolysisIndustrialsodiumchloridesolution,ChemicalMethodsthatproducesodiumhypochloriteandchlorine.
3Basicrequirement
3.1GeneralRequirement
Thepartincludetherequirementsofwatertreatmentandhydrogengenerationequipmentandsystem,involvesmechanicalinstallation,pipeinstallation,weldingconstruction,monitoringinstrumentandprogrammedcontrolect,itshouldmeettherelevantprovisionsofnationalstandardsandcurrentstandards.
Themainequipmentmanufacturersshouldhavemanufacturinglicenceissuedbystate,province(autonomousregion),Direct-controlledmunicipalityorthestateadministrativesupervisionandadministrationdepartment.Qualityacceptanceofequipmentmanufactureonthebasisofthecurrentrelevantstandardsofthestateorindustry,ifnorulers,inaccordancewiththecontract.
Allkindsofequipmentconstructionaccordingtorequirementsofdesignandtechnicaldocumentationoftheproduct.Tomodifythedesignorusealternativeequipmentsorthematerials,itshouldbeapprovedbydesignedunits,supervisorandconstructionunits,andthanitcanbeimplemented.
Non-standardequipmentconstructionwhichisnotincludedinthispartshallbeinaccordancewiththecontractagreementordesignrequirements.Forimportedequipment,weshouldformulatetechnicalmeasuresforconstructionaccordingtothecontractagreementorrelevanttechnicalrequirements.
Orderingcompletesetofdevicesshouldsigntechnicalagreementandacceptanceasanattachmentofthecontractandthebasisofconstructionacceptance.
ThereareSupervisionandinspectionreportsbeforeinstallingcompletesetofdevices.
3.1.7Liquidlevelmeasurementandanalysismeterinstallationafterrinsthesystemandcleanandqualified.
Drainagepipelineofthecontainershouldbearrangedinthetrench,itsdirectionshouldbethesamewithdraindirections.
3.1.9Dosingroomshouldbeequippedwiththerinsewater.
3.1.10StoringorconveAniongequipmentfora