土方工程施工方案05ExcavationEmbankment611.docx

上传人:b****4 文档编号:5012272 上传时间:2022-12-12 格式:DOCX 页数:12 大小:522.96KB
下载 相关 举报
土方工程施工方案05ExcavationEmbankment611.docx_第1页
第1页 / 共12页
土方工程施工方案05ExcavationEmbankment611.docx_第2页
第2页 / 共12页
土方工程施工方案05ExcavationEmbankment611.docx_第3页
第3页 / 共12页
土方工程施工方案05ExcavationEmbankment611.docx_第4页
第4页 / 共12页
土方工程施工方案05ExcavationEmbankment611.docx_第5页
第5页 / 共12页
点击查看更多>>
下载资源
资源描述

土方工程施工方案05ExcavationEmbankment611.docx

《土方工程施工方案05ExcavationEmbankment611.docx》由会员分享,可在线阅读,更多相关《土方工程施工方案05ExcavationEmbankment611.docx(12页珍藏版)》请在冰豆网上搜索。

土方工程施工方案05ExcavationEmbankment611.docx

土方工程施工方案05ExcavationEmbankment611

DEMOCRATICSOCIALISTREPUBLICOFSRILANKA

MINISTRYOFHIGHEREDUCATION&HIGHWAYS

EXTENSIONOFSOUTHERNESPRESSWAYPROJECT

SECTION-3

FROMWETIYATOANDARAWEWA

MethodStatementforExcavation&Embankment

CHINARAILWAYFIRSTSURVEY&

DESIGNINSTITUTEGROUPCO.,LTD.(FSDI)

CONSULTANT

CONTRACTOR

CHINASTATECONSTRUCTIONENGINEERING

CORPORATIONLTD.

SubmittalNumber.S3-CSC-EW-CS1-3005-02

ProjectCode

FromXXX

Section

No

Project

Phase

Type

ProfessionalType

DocumentTe

DocumentNo

Revision

#

E

S

E

P

C

S

C

S

3

W

D

T

E

C

E

W

C

S

1

3

0

0

5

0

2

02

2016.6.11

RenPeng

JiJianhui

CaiLei

Forconstruction施工

02

2016.4.27

RenPeng

JiJianhui

CaiLei

Thirdmodificationandsubmission第三修改和提交

01

2016.4.1

RenPeng

JiJianhui

CaiLei

Secondmodificationandsubmission第二修改和提交

00

2016.2.16

RenPeng

JiJianhui

CaiLei

FirstSubmission第一次提交

Revision#

Date

preparedby

Audited

QualityManager

Validation

ChiefEngineer

Description

RepliesaboutcommentsoftheMSforExcavation&Embankment(S3-CSC-EW-CS1-3005-01)

No

CommentsofConsultant

RepliesofContractor

1

Thetechnologyofstrippingtop-soilshouldbeexpatiatedaccordingtoclause651,TechnicalSpecificationoftheContract.

Clause651inspecificationisabout.furnishingandplacingtopsoil.Wehavementionedthemethodofstockpilinginchapter4.1.3.

2

Thelastsentenceofpageno05says“Itisenvisagedthatthesame8groupsusedforthoseexcavationactivitieswillbeusedfortheseworks”.Youhavenotmentionedregardingany08groupsthatareusedforexcavationactivity.Pleaseclarify.

Wehaverevisethesentence..

3

Youhavereferredanaddenduminthelastparaofpageno06.Wecouldnotfoundsuchaddenduminavailablerecordswithus.HoweverthecontentoflastparaisnotrelevantsinceyouareresponsibleforthedesignworkandPlanandProfiledrawingaremadeaccordingtoresultsofyouinvestigations.

Thisparagraphisnotrelevant,sowedeleteit.

关于开挖、路堤的MS评论回复(s3-csc-ew-cs1-3005-01)

No

Commentsof顾问

回复承包商

1

应根据第651条的规定,对剥顶土壤技术进行详细的阐述,并对合同的技术条件。

第651条在规范中是关于。

我们已经提到在第4.1.3堆存的方法。

2

页的最后一句没有05说:

“它是设想,相同的8组用于这些挖掘活动将用于这些作品”,你没有提到关于任何08组用于挖掘活动,请澄清。

我们已经修改了句子。

3

3你已经在最后一页的第06页提到了一个附录,我们找不到这样的附录可以用我们的记录。

然而,最后一段的内容是不相关的,因为你是负责设计工作,并计划和轮廓图是根据你的调查结果。

这一段是不相关的,所以我们删除它。

这段是不相关的,所以我们删除它

Section

CONTENTS

Page

1.0

IntroductionandGeneralInformation介绍和一般信息

1

2.0

Materials材料

1

3.0

Equipment设备

1

4.0

MethodandProcedure方法和程序

2-7

5.0

SafetyManagementandControl安全管理与控制

7-9

6.0

QualityControl质量控制

9

7.0

MeasurementControl测量控制

10

1.IntroductionandGeneralInformation介绍和一般信息

Thismethodstatementprovidesthedetailsofthematerials,theequipment,theprocedureandrelevantdocumentsrelatedtotheexcavationandembankmentactivities,includingthequalitycontrolandthesafetyprecautions.

1.1.LocationofWorks作品的位置

ThelocationoftheexcavationandembankmentworkswillbelimitedtoselectedareaswithintheRightofWay(ROW),asinstructedbytheEngineer.Alternatively,asrequired,theseworksmaybeapplicabletolocationsoutsidetheROW(ie.borrowpits,disposalareasetc.)

2.Materials材料

Themajormaterialsusedfortheexcavationandembankmentworksinclude,butarenotlimitedtothefollowing.

∙Suitablesoil

∙Granularmaterial

∙Weatheredrock

∙Hardrock

∙Unclassifiedorborrowmaterial

∙Water

3.Equipment设备

Themajorequipmentusedfortheexcavationandembankmentworksinclude,butarenotlimitedtothefollowing.

∙JCB

∙Backhoes

∙Dozers

∙DumpTrucks

∙MotorGrader

∙RockDrills

∙RockHammers

∙Rollers

∙Rammers/PlateCompactors

∙WaterBrowsers

∙Sampling&TestingEquipment

∙Otherminortools

4.MethodandProcedures方法和程序

Themethodandproceduresfortheexcavationandembankmentworksfollowthestepsbelow.TheFlowchartisalsoprovidedinAppendixA

Beforethecommencementoftheworkandafterthecompletionoftherelatedclearing&grubbingoperation,theEngineerwillbenotifiedoftheareastobeexcavated.Accordingly,theEngineerwillinspecttheareaforapprovalbeforecommencementoftheworks.

Soilclassificationwillbecarriedoutonsamplestakenalongtheroadconstructionarea.Theintervalofsamplingwillbedeterminedbythechangingnatureofthesoilencountered.Teststoclassifythesoiltypesencounteredwillinclude,oneormoreofthefollowing,asrequired(ie.CBR(DCP),PI,Gradation,OMC/MDDetc.)

4.1.ExcavationofTopsoilMaterials挖掘表层土材料

4.1.1AftergettingtheEngineer’sapproval,thetopsoil(toplayerin-situmaterialcontainingvegetation,rootsandseeds)willbestrippedoffbymeansofearthmovingequipmentinthedayshift.

DuringtheEngineer’sinspectionofthegeneralareaofwork,theEngineerwillconfirmthethicknessoftopsoiltoremoveandrecordhisinstructioninwritingatthefield.

4.1.2Thetopsoilmaterialsexcavatedwillbestockpiledwithinand/oroutsidethesiteinareasapprovedbytheEngineer.

4.1.3Afterthecompletionofstrippingandstockpilingoftopsoilwithinaparticulararea,arequestwillbemadetotheEngineertocarryoutaninspectiontoconsistofavisualinspectionfollowedbyajointsurvey.Iffollowingtheinitialvisualinspection,theEngineerdeterminesthatcertainareasrequirefurtherstripping,hewillissuehisfurtherinstructionsinwritingatthispointandCSCECwillcarryouttheadditionalworkaccordingly.Oncetheinitialvisualinspectionissatisfied,thesecondpartoftheinspectionwillbecompletedwithajointsurveyoftheareabeforecommencementofworkstofollow.

4.2.ExcavationofUnclassifiedMaterials公开的材料开挖

4.2.1EarthmaterialwhichwillbeclassifiedasunclassifiedsoilandconformingtospecificationrequirementswillbeexcavatedusingExcavators.

4.2.2Theexcavatedunclassifiedmaterialwillbetransporteddirectlytoareasforuseinformingembankmentsfortheroadways,connectingroads,rampsandapproaches;inconstructingsubgradeandshoulders;inbackfillingaroundstructuresorforanyotherpurposenecessaryforthecompletionoftheprojectinaccordancewiththedrawings.

4.2.3Inareaswherethesituationarises,excessmaterialwillbestockpiledtemporarilywithintheROWoralternativelyinselectedareasadjacenttothesite,approvedbytheEngineer.

4.2.4Excavationwillbeundertakendowntotheapprovedlinesandlevels.

4.2.5Ifthesubgradelevelisreachedwithintheunclassifiedmaterialstrata,thebottomlayerwillbecompactedtothedensityspecified.IfmaterialatthebottomisfoundtobesoftandweareunabletocompacttotherequireddensityandCBRvalues,thenwewillrequiretheinstructionoftheEngineertofurtherexcavatetoaspecifieddepthandreplacewithSelectedMaterial,orasotherwiseinstructed.Detailofsuchadditionalworkswillberecordedjointly.

Ifhardrockisreachedandexcavationneedstocontinueinthenewstrata,unclassifiedexcavationwillbehaltedinthoseareas.

4.2.6ArequestwillbemadetotheEngineertocarryoutajointsurveyoftheareawhereexcavationiscompleted,forthepurposeofmeasurements.

4.2.7Excavationworkincuttingareaswillbedoneseparatedinlayersandwidthtoensurethevehiclestraveling.Fortheshallowexcavationportion,bulldozersandloaderswillbeused,forthedeepexcavationportion,excavatorwillbeused..Soilexcavationandsoftrockcuttingexcavation,thereservedsoilatthebottomorslopeshouldbeatleast20cmforthesecondaryexcavation.Meanwhile,thecatchwatermustbebuildbeforeexcavation.

4.2.8Accordingtothedesignrequirements,theslopeofsoilcuttingareais1:

2andtheslopeofrockcuttingareais1:

0.5,whentheexcavationdepthismorethan7m,twolevelsofslopewillbeused.

4.3.HardRockExcavation硬岩开挖

Thischapterwillbedescribedinmethodstatementforrockblasting.

4.4.ExcavationofUnsuitableMaterials不合格材料的挖掘

4.4.1EarthmaterialwhichwillbeidentifiedbytheEngineerasunsuitableforembankmentwillbeexcavatedusingexcavators/dozers.

4.4.2SuchmaterialswillbetransporteddirectlytodisposalareasapprovedbytheEngineer,withoutdoublehandling.

Beforethedisposalofwastematerialsorselectedvegetation,arequestwillbemadetotheEngineerforapprovalofalocationfordisposalwhensuchalocationisintheROW.Alternatively,ifanareaoutsidethesiteisconsidered,thenecessarystepswillbetakentoobtainapprovalfromlandownersandoftheCEA.

Disposalofallwasteincludingwood,trash,debris,stumps,andotherforeignmatterwillberemovedtotheapprovedlocationswiththehelpofdumptrucks,JCB,tractorandmanpowerorother.

Eachlocationforthenecessaryapprovalsisshowedasfollow.

No

Name

Address

1

A.L.Peeter

No4562,WeniwalAra,Sooriyawewa

2

K.A.Leelawathi

Watawana,Bediganthota

3

NimalRuwanPatirana

No162,WatawanaRoad,Bediganthota

4

R.K.kusumawathi

Bediganthota,Sooriyawewa

Figure4.4-1Locationofdisposalarea处置区位置

4.4.3Thevolumeofexcavatedmaterialtobespoiledissubstantialinvolumeandproperdisposalareashavetobedeterminedoutsidethesite.

Ifanyborrowareasarerequired,unsuitablematerialwillbedisposedofintheresultantexcavations.Theunsuitablematerialwillbetransportedandstockpiledontheedgeofborrowareaforlaterbackfilling.Onceexcavationoftheborrowpitiscompleted,thestockpiledspoilmaterialwillbedozedtothepitandtopsoilwillbesp