1、土方工程施工方案05Excavation Embankment611 DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKAMINISTRY OF HIGHER EDUCATION & HIGHWAYS EXTENSION OF SOUTHERN ESPRESSWAY PROJECT SECTION-3 FROM WETIYA TO ANDARAWEWAMethod Statement for Excavation & EmbankmentCHINA RAILWAY FIRST SURVEY &DESIGN INSTITUTE GROUP CO., LTD. (F
2、SDI)CONSULTANTCONTRACTORCHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD. Submittal Number.S3-CSC-EW-CS1-3005-02Project CodeFrom XXXSection NoProject PhaseTypeProfessional TypeDocument TeDocument NoRevision #ESEPCSCS3WDTECEWCS1300502022016.6.11Ren PengJi JianhuiCai LeiFor construction 施工022016.4
3、.27Ren PengJi JianhuiCai LeiThird modification and submission 第三修改和提交012016.4.1Ren PengJi JianhuiCai LeiSecond modification and submission 第二修改和提交002016.2.16Ren PengJi JianhuiCai LeiFirst Submission 第一次提交 Revision #Dateprepared byAuditedQuality ManagerValidation Chief EngineerDescriptionReplies abou
4、t comments of the MS for Excavation & Embankment( S3-CSC-EW-CS1-3005-01 )NoComments of ConsultantReplies of Contractor1The technology of stripping top-soil should be expatiated according to clause 651, Technical Specification of the Contract.Clause 651 in specification is about .furnishing and placi
5、ng topsoil. We have mentioned the method of stockpiling in chapter 4.1.3.2The last sentence of page no 05 says “It is envisaged that the same 8 groups used for those excavation activities will be used for these works”.You have not mentioned regarding any 08 groups that are used for excavation activi
6、ty.Please clarify.We have revise the sentence.3You have referred an addendum in the last para of page no 06.We could not found such addendum in available records with us. However the content of last para is not relevant since you are responsible for the design work and Plan and Profile drawing are m
7、ade according to results of you investigations.This paragraph is not relevant, so we delete it.关于开挖、路堤的MS评论回复(s3-csc-ew-cs1-3005-01)NoComments of顾问回复承包商1应根据第651条的规定,对剥顶土壤技术进行详细的阐述,并对合同的技术条件。第651条在规范中是关于。我们已经提到在第4.1.3堆存的方法。2页的最后一句没有05说:“它是设想,相同的8组用于这些挖掘活动将用于这些作品”,你没有提到关于任何08组用于挖掘活动,请澄清。我们已经修改了句子。33你已
8、经在最后一页的第06页提到了一个附录,我们找不到这样的附录可以用我们的记录。然而,最后一段的内容是不相关的,因为你是负责设计工作,并计划和轮廓图是根据你的调查结果。这一段是不相关的,所以我们删除它。这段是不相关的,所以我们删除它SectionCONTENTSPage1.0Introduction and General Information介绍和一般信息12.0Materials 材料13.0Equipment 设备14.0Method and Procedure 方法和程序2-75.0Safety Management and Control 安全管理与控制7-96.0Quality Co
9、ntrol 质量控制97.0Measurement Control 测量控制101. Introduction and General Information 介绍和一般信息This method statement provides the details of the materials, the equipment, the procedure and relevant documents related to the excavation and embankment activities, including the quality control and the safety pr
10、ecautions.1.1. Location of Works作品的位置The location of the excavation and embankment works will be limited to selected areas within the Right of Way (ROW), as instructed by the Engineer. Alternatively, as required, these works may be applicable to locations outside the ROW (ie. borrow pits, disposal a
11、reas etc.)2. Materials材料The major materials used for the excavation and embankment works include, but are not limited to the following. Suitable soil Granular material Weathered rock Hard rock Unclassified or borrow material Water 3. Equipment 设备The major equipment used for the excavation and embank
12、ment works include, but are not limited to the following. JCB Backhoes Dozers Dump Trucks Motor Grader Rock Drills Rock Hammers Rollers Rammers / Plate Compactors Water Browsers Sampling & Testing Equipment Other minor tools4. Method and Procedures 方法和程序The method and procedures for the excavation a
13、nd embankment works follow the steps below.The Flowchart is also provided in Appendix ABefore the commencement of the work and after the completion of the related clearing & grubbing operation, the Engineer will be notified of the areas to be excavated. Accordingly, the Engineer will inspect the are
14、a for approval before commencement of the works.Soil classification will be carried out on samples taken along the road construction area. The interval of sampling will be determined by the changing nature of the soil encountered. Tests to classify the soil types encountered will include, one or mor
15、e of the following, as required (ie. CBR(DCP), PI, Gradation, OMC/MDD etc.) 4.1. Excavation of Topsoil Materials 挖掘表层土材料4.1.1 After getting the Engineers approval, the topsoil (top layer in-situ material containing vegetation, roots and seeds) will be stripped off by means of earthmoving equipment i
16、n the day shift.During the Engineers inspection of the general area of work, the Engineer will confirm the thickness of topsoil to remove and record his instruction in writing at the field.4.1.2 The topsoil materials excavated will be stockpiled within and/or outside the site in areas approved by th
17、e Engineer.4.1.3 After the completion of stripping and stockpiling of topsoil within a particular area, a request will be made to the Engineer to carryout an inspection to consist of a visual inspection followed by a joint survey. If following the initial visual inspection, the Engineer determines t
18、hat certain areas require further stripping, he will issue his further instructions in writing at this point and CSCEC will carryout the additional work accordingly. Once the initial visual inspection is satisfied, the second part of the inspection will be completed with a joint survey of the area b
19、efore commencement of works to follow.4.2. Excavation of Unclassified Materials 公开的材料开挖4.2.1 Earth material which will be classified as unclassified soil and conforming to specification requirements will be excavated using Excavators.4.2.2 The excavated unclassified material will be transported dire
20、ctly to areas for use in forming embankments for the roadways, connecting roads, ramps and approaches; in constructing subgrade and shoulders; in backfilling around structures or for any other purpose necessary for the completion of the project in accordance with the drawings.4.2.3 In areas where th
21、e situation arises, excess material will be stockpiled temporarily within the ROW or alternatively in selected areas adjacent to the site, approved by the Engineer.4.2.4 Excavation will be undertaken down to the approved lines and levels.4.2.5 If the subgrade level is reached within the unclassified
22、 material strata, the bottom layer will be compacted to the density specified. If material at the bottom is found to be soft and we are unable to compact to the required density and CBR values, then we will require the instruction of the Engineer to further excavate to a specified depth and replace
23、with Selected Material, or as otherwise instructed. Detail of such additional works will be recorded jointly.If hard rock is reached and excavation needs to continue in the new strata, unclassified excavation will be halted in those areas.4.2.6 A request will be made to the Engineer to carry out a j
24、oint survey of the area where excavation is completed, for the purpose of measurements.4.2.7 Excavation work in cutting areas will be done separated in layers and width to ensure the vehicles traveling. For the shallow excavation portion, bulldozers and loaders will be used, for the deep excavation
25、portion, excavator will be used.Soil excavation and soft rock cutting excavation, the reserved soil at the bottom or slope should be at least 20cm for the secondary excavation. Meanwhile, the catchwater must be build before excavation.4.2.8 According to the design requirements, the slope of soil cut
26、ting area is 1:2 and the slope of rock cutting area is 1:0.5, when the excavation depth is more than 7 m, two levels of slope will be used.4.3. Hard Rock Excavation 硬岩开挖This chapter will be described in method statement for rock blasting.4.4. Excavation of Unsuitable Materials 不合格材料的挖掘4.4.1 Earth ma
27、terial which will be identified by the Engineer as unsuitable for embankment will be excavated using excavators / dozers.4.4.2 Such materials will be transported directly to disposal areas approved by the Engineer, without double handling.Before the disposal of waste materials or selected vegetation
28、, a request will be made to the Engineer for approval of a location for disposal when such a location is in the ROW. Alternatively, if an area outside the site is considered, the necessary steps will be taken to obtain approval from land owners and of the CEA.Disposal of all waste including wood, tr
29、ash, debris, stumps, and other foreign matter will be removed to the approved locations with the help of dump trucks, JCB, tractor and manpower or other.Each location for the necessary approvals is showed as follow.NoNameAddress1A.L.PeeterNo 4562,Weniwal Ara,Sooriyawewa2K.A.LeelawathiWatawana,Bediga
30、nthota3Nimal Ruwan PatiranaNo162,Watawana Road,Bediganthota4R.K.kusumawathiBediganthota,SooriyawewaFigure4.4-1 Location of disposal area 处置区位置4.4.3 The volume of excavated material to be spoiled is substantial in volume and proper disposal areas have to be determined outside the site.If any borrow a
31、reas are required, unsuitable material will be disposed of in the resultant excavations. The unsuitable material will be transported and stockpiled on the edge of borrow area for later backfilling. Once excavation of the borrow pit is completed, the stockpiled spoil material will be dozed to the pit and topsoil will be sp
copyright@ 2008-2022 冰豆网网站版权所有
经营许可证编号:鄂ICP备2022015515号-1