SECTION 11 53 13.docx

上传人:b****6 文档编号:3281720 上传时间:2022-11-21 格式:DOCX 页数:16 大小:25.61KB
下载 相关 举报
SECTION 11 53 13.docx_第1页
第1页 / 共16页
SECTION 11 53 13.docx_第2页
第2页 / 共16页
SECTION 11 53 13.docx_第3页
第3页 / 共16页
SECTION 11 53 13.docx_第4页
第4页 / 共16页
SECTION 11 53 13.docx_第5页
第5页 / 共16页
点击查看更多>>
下载资源
资源描述

SECTION 11 53 13.docx

《SECTION 11 53 13.docx》由会员分享,可在线阅读,更多相关《SECTION 11 53 13.docx(16页珍藏版)》请在冰豆网上搜索。

SECTION 11 53 13.docx

SECTION115313

SECTION115313

(FORMERLY11610)

LABORATORYFUMEHOODS

Displayhiddennotestospecifierbyusing"Tools/Options/View/HiddenText”

**NOTETOSPECIFIER**MottManufacturingLtd.;Sigma‘Pro’LaboratoryFumeHoods,Sigma‘Pro’auxiliaryairLaboratoryFumeHoods,PerchloricAcidLaboratoryFumeHoods,RFVLaboratoryFumeHoods,HopecLaboratoryFumeHoods,HydroflouricFumeHoods,ProDemonstrationHoods,FloorMountedHoods.

ThissectionisbasedontheproductsofMottManufacturingLtd.,whichislocatedat:

452HardyRd

Brantford,ONN3T5L8

Tel:

(519)752-7825

Fax:

(519)752-2895

Email:

inquire@mott.ca

www.mott.ca

SECTION115313–LABORATORYFUMEHOODS

PART1–GENERAL

Summary:

ThisSpecificationidentifiestheminimummaterialandconstructionstandardsthatarerequiredtodeliveraqualityinstallationoflaboratoryfumehoods.FumehoodsshallbesuppliedinaccordancewiththerequirementsofthisSpecification.ThefumehoodsidentifiedinthisSpecificationshallincludethemiscellaneousmetalpanelsandotherrelatedcomponentsasidentifiedontheDrawingsandthatarenecessaryforthecompleteinstallation.

Hoodsshallfunctionasventilated,enclosedworkspaces,designedtocapture,confineandexhaustfumes,vapoursandparticulatematterproducedorgeneratedwithintheenclosure.

 

1.1SECTIONINCLUDES

A.LaboratoryFumeHoods

 

1.2RELATEDSECTIONS

**NOTETOSPECIFIER**Deletesectionsbelowthatareirrelevanttoproject.Addsectionsasrequired.

A.Division09Section6513,“ResilientBaseandAccessories”

B.Division12Section3600,“Countertops”

C.Division12Section3553,“ManufacturedMetalCasework

D.Division12Section3200,“ManufacturedWoodCasework”

E.Division13Section2100,“ControlledEnvironmentRooms”

F.Division22Section4000,“PlumbingFixtures”

G.Division23Section3000,“HVACAirDistribution”

H.Division26Section0500,“CommonWorkResultsforElectrical”

I.RelatedWorkToBePerformedByOthers:

1.Finalinstallationofallplumbing,serviceandelectricalfixturesattachedtofumehoodorcountertop(excludingpipingandwiringwithinfumehoods).

2.Finalconnectiontoservicelinesofallplumbing,serviceandelectricalfixturesattachedtolaboratorycaseworkorfumehoods.

 

1.3REFERENCES

**NOTETOSPECIFIER**Deletereferencesbelownotrequiredforproject.

A.SEFA1-2002:

LaboratoryFumeHoods–Design,Materials,UseandTestingGuidelines

ScienceEquipmentandFurnitureAssociation(SEFA)

B.ISO9001:

2000–QualityManagement

InternationalStandardsOrganization(ISO)

C.ADA(ATBCBADAAG)AmericanswithDisabilitiesActAccessibilityGuidelines

AmericanswithDisabilitiesAct(ADA)

 

1.4SUBMITTALS

RefertoSection013300,“SubmittalProcedures,”forrequirements,procedures,etc.

A.ProductData:

1.Drawingsshallincludedataanddetailsforconstructionofthelaboratoryfumehoodsaswellasinformationregardingthename,quantity,typeandconstructionofmaterials(suchashardware,gauges,etc),thatwillbeusedtocompletetheproject.

B.ShopDrawings:

1.Thelaboratorycaseworkmanufacturershallfurnishshopdrawingsillustratingthelayoutandplacementofalllaboratorycaseworkandfumehoodsaswellasanyproductsincludedinthissection.

2.Indicatethetypeandlocationofallservicefittingsandassociatedsupplyconnections.

3.Preparationinstructionsandrecommendations.

4.Storageandhandlingrequirementsandrecommendations.

5.Installationmethods.

C.SelectionSamples:

**NOTETOSPECIFIER**Deleteselectionsamplesifcolorshavealreadybeenselected.

Submitthefollowing:

1.Onecompletesetofcolorchipsrepresentingthemanufacturer’sfullrangeofavailablecolors.Minimumsamplesize2inchesby3inches(50mmx76mm).

D.QualityAssurance/Control

1.DesignData/TestReports:

Manufacturershallsubmittestdataanddesigncriteriawhichareincompliancewiththeprojectspecifications.

**NOTETOSPECIFIER**Ifauxiliaryairmodelisbeingusedrewordthefirstsentencetostate“FumeHoods,SigmaSystems“Pro”auxiliaryairmodel,”

IfHOPECmodelisbeingusedrewordthefirstsentencetostate“FumeHoods,SigmaSystems“HOPECTYPE”model,”

IftheRFVmodelisbeingusedrewordthefirstsentencetostate“FumeHoods,SigmaSystems“RFV”model,”

2.Performance:

FumeHoods,SigmaSystems“Pro”model,shallbedesignedtomeetorexceedtheAmericanStandardforLaboratoryVentilationandtheAmericanIndustrialHygieneAssociationstandardasdescribedinANSI/AIHAZ9.5.ThisstandardofperformanceshallbeverifiedthroughfactorytestinginaccordancewiththeestablishedprotocolassetoutbytheANSI/ASHRAE110standard.

3.Certificates:

Allcertificationsrequiredinthespecificationsshallbesubmittedwiththeoriginalsubmittalpackageunderseparatecover.Certificatesmustbeprovidedwiththesignatureofaqualifiedindividualofthesupplier.

4.Manufacturers’Instructions:

Providemanufacturer’sinstructionsforinstallationandmaintenanceofallproductsprovidedandinstalledwithinthissection.Instructionswillbeinboundform,tabbedandorganizedbysectionnumber.

5.Submitcopyofthecorrosionresistantlabeltobeattachedtothefumehoodexteriorwithcondensedinformationcoveringrecommendedlocationsforapparatusandaccessories.

 

1.5QUALITYASSURANCE

A.ManufacturerQualifications:

1.ThefollowinglistofinformationwillbeprovidetotheArchitectatleastten(10)dayspriortothebidopening:

2.Listofmanufacturingfacilities;

3.ManufactureroffumehoodsshallhavethecapabilitywithintheirfacilityofperformingfumehoodtestsbasedonthelatestANSI/ASHRAESpecification110.

4.Alistoften(10)installationsofcomparablestaturecompletedwithinthepast5years;

5.Constructiondetailsdepictingthematerials,sizesandmethodsofconstruction;

B.Mock-Ups

**NOTETOSPECIFIER**Includeamock-upiftheprojectsizeand/orqualitywarranttakingsuchaprecaution.Thefollowingisoneexampleofhowamock-uponalargeprojectmightbespecified.Whendecidingontheextentofthemock-up,considerallthemajordifferenttypesofworkontheproject.

1.Areamockupsshallbeasindicatedontheshopdrawings.Postbidmockupareasmustbepricedfordisassemblyandreassemblyandusedwithintheproject.

2.DonotproceedwithremainingworkuntilinstallationisapprovedbyArchitect.

a)Installbasecabinetwithspecifiedhardware.

b)Installfumehoodwithspecifiedfixtures.

 

1.6DELIVERY,STORAGEANDHANDLING

A.Packaging,Shipping,HandlingandUnloading

1.Packaging:

Productsshallhavepackagingadequateenoughtoprotectfinishedsurfacesfromsoilingordamageduringshipping,deliveryandinstallation.

2.Delivery:

Fumehooddeliveryshallonlytakeplaceafterpainting,utilityrough-insandrelatedactivitiesarecompletedthatcouldotherwisedamage,soilordeterioratefumehoodsininstallationareas.

3.Handling:

Care,suchastheuseofpropermovingequipment,experiencedmovers,etc.,shallbeusedatalltimestoavoiddamagingthefumehoods.Untilinstallationtakesplace,anywrapping,insulationorothermethodofprotectionappliedtoproductsfromthefactorywillbeleftinplacetoavoidaccidentaldamage.

B.AcceptanceatSite:

1.FumehoodswillnotbedeliveredorinstalleduntiltheconditionsspecifiedunderPart3,Installationsectionofthisdocumenthavebeenmet.

C.Storage:

1.Fumehoodsshallbestoredintheareaofinstallation.If,priortoinstallation,itisnecessaryforthefumehoodstobetemporarilystoredinanareaotherthantheinstallationarea,theenvironmentalconditionsshallmeettheenvironmentalrequirementsspecifiedundertheProjectSiteConditionsarticleofthissection.

D.WasteManagementandDisposal:

1.Thesupplierofthelaboratoryfumehoodsareresponsibleforremovinganywasteorrefuseresultingfromtheinstallationof,orworkpertainingtolaboratoryfumehoods;therebyleavingtheprojectsitecleanandfreeofdebris.Trashcontainer(s)tobeprovidedbyothers.

 

1.7PROJECTSITECONDITIONS

A.Buildingmustbeenclosed(windowsanddoorssealedandweather-tight);

B.AnoperationalHVACsystemthatmaintainstemperatureandhumidityatoccupancylevelsmustbeinplace;

C.Adjacentandrelatedworkshallbecomplete;

D.Ceiling,overheadductworkandlightingmustbeinstalled;

E.Sitemustbefreeofanyfurtherconstructionsuchas“wetwork”;

F.Requiredcaseworkmustbeinstalledaccuratelyandtheprojectmustbereadyforfumehoodinstallation.

 

1.8WARRANTY

A.FurnishawrittenwarrantythatWorkperformedunderthisSectionshallremainfreefromdefectsastomaterialsandworkmanshipforaperiodoftwo

(2)yearsfromdateofshipment.DefectsinmaterialsandworkmanshipthatmaydevelopwithinthistimearetobereplacedwithoutcostorexpensetotheOwner.

Defectsinclude,butarenotlimitedto:

1.Ruptured,cracked,orstainedcoating

2.Discolorationorlackoffinishintegrity

3.Crackingorpeelingoffinish

4.Slippage,shift,orfailureofattachmenttowall,floor,orceiling

5.Weldorstructuralfailure

6.Warpingorunloadeddeflectionofcomponents

7.Failureofhardware

B.ThewarrantywithrespecttoproductsofanothermanufacturersoldbyMottManufacturingislimitedtothewarrantyextendedbythatmanufacturertoMottManufacturing.

 

PART2–PRODUCTS

2.1MANUFACTURER

**NOTETOSPECIFIER**DeleteormodifythefollowingparagraphstocoordinatewiththeOwner’srequirements.

A.AcceptableManufacturer:

MottManufacturingLtd.;452HardyRd.Brantford,ON,CanadaN3T5L8.Tel:

(519)752-7825.Fax:

(519)752-2895.Email:

in

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 小学教育 > 语文

copyright@ 2008-2022 冰豆网网站版权所有

经营许可证编号:鄂ICP备2022015515号-1