1、SECTION 11 53 13SECTION 11 53 13(FORMERLY 11610)LABORATORY FUME HOODSDisplay hidden notes to specifier by using Tools/Options/View/Hidden Text”* NOTE TO SPECIFIER * Mott Manufacturing Ltd.; Sigma Pro Laboratory Fume Hoods, Sigma Pro auxiliary air Laboratory Fume Hoods, Perchloric Acid Laboratory Fum
2、e Hoods, RFV Laboratory Fume Hoods, Hopec Laboratory Fume Hoods, Hydroflouric Fume Hoods, Pro Demonstration Hoods, Floor Mounted Hoods. This section is based on the products of Mott Manufacturing Ltd., which is located at: 452 Hardy Rd Brantford, ON N3T 5L8 Tel: (519) 752-7825 Fax: (519) 752-2895 Em
3、ail: inquiremott.ca www.mott.ca SECTION 11 53 13 LABORATORY FUME HOODSPART 1 GENERALSummary: This Specification identifies the minimum material and construction standards that are required to deliver a quality installation of laboratory fume hoods. Fume hoods shall be supplied in accordance with the
4、 requirements of this Specification. The fume hoods identified in this Specification shall include the miscellaneous metal panels and other related components as identified on the Drawings and that are necessary for the complete installation. Hoods shall function as ventilated, enclosed work spaces,
5、 designed to capture, confine and exhaust fumes, vapours and particulate matter produced or generated within the enclosure.1.1 SECTION INCLUDESA. Laboratory Fume Hoods1.2 RELATED SECTIONS * NOTE TO SPECIFIER * Delete sections below that are irrelevant to project. Add sections as required.A. Division
6、 09 Section 65 13, “Resilient Base and Accessories”B. Division 12 Section 36 00, “Countertops”C. Division 12 Section 35 53, “Manufactured Metal CaseworkD. Division 12 Section 32 00, “Manufactured Wood Casework”E. Division 13 Section 21 00, “Controlled Environment Rooms”F. Division 22 Section 40 00,
7、“Plumbing Fixtures”G. Division 23 Section 30 00, “HVAC Air Distribution”H. Division 26 Section 05 00, “Common Work Results for Electrical”I. Related Work To Be Performed By Others:1. Final installation of all plumbing, service and electrical fixtures attached to fume hood or countertop (excluding pi
8、ping and wiring within fume hoods). 2. Final connection to service lines of all plumbing, service and electrical fixtures attached to laboratory casework or fume hoods.1.3 REFERENCES* NOTE TO SPECIFIER * Delete references below not required for project.A. SEFA 1-2002: Laboratory Fume Hoods Design, M
9、aterials, Use and Testing GuidelinesScience Equipment and Furniture Association (SEFA) B. ISO 9001:2000 Quality ManagementInternational Standards Organization (ISO)C. ADA (ATBCB ADAAG) Americans with Disabilities Act Accessibility GuidelinesAmericans with Disabilities Act (ADA)1.4 SUBMITTALSRefer to
10、 Section 01 33 00, “Submittal Procedures,” for requirements, procedures, etc.A. Product Data: 1. Drawings shall include data and details for construction of the laboratory fume hoods as well as information regarding the name, quantity, type and construction of materials (such as hardware, gauges, et
11、c), that will be used to complete the project.B. Shop Drawings: 1. The laboratory casework manufacturer shall furnish shop drawings illustrating the layout and placement of all laboratory casework and fume hoods as well as any products included in this section.2. Indicate the type and location of al
12、l service fittings and associated supply connections.3. Preparation instructions and recommendations.4. Storage and handling requirements and recommendations.5. Installation methods.C. Selection Samples: * NOTE TO SPECIFIER * Delete selection samples if colors have already been selected.Submit the f
13、ollowing:1. One complete set of color chips representing the manufacturers full range of available colors. Minimum sample size 2 inches by 3 inches (50mm x 76mm).D. Quality Assurance/Control1. Design Data/Test Reports: Manufacturer shall submit test data and design criteria which are in compliance w
14、ith the project specifications.* NOTE TO SPECIFIER * If auxiliary air model is being used reword the first sentence to state “Fume Hoods, Sigma Systems “Pro” auxiliary air model,”If HOPEC model is being used reword the first sentence to state “Fume Hoods, Sigma Systems “HOPEC TYPE” model,”If the RFV
15、 model is being used reword the first sentence to state “Fume Hoods, Sigma Systems “RFV” model,”2. Performance: Fume Hoods, Sigma Systems “Pro” model, shall be designed to meet or exceed the American Standard for Laboratory Ventilation and the American Industrial Hygiene Association standard as desc
16、ribed in ANSI/AIHA Z9.5. This standard of performance shall be verified through factory testing in accordance with the established protocol as set out by the ANSI/ASHRAE 110 standard.3. Certificates: All certifications required in the specifications shall be submitted with the original submittal pac
17、kage under separate cover. Certificates must be provided with the signature of a qualified individual of the supplier.4. Manufacturers Instructions: Provide manufacturers instructions for installation and maintenance of all products provided and installed within this section. Instructions will be in
18、 bound form, tabbed and organized by section number.5. Submit copy of the corrosion resistant label to be attached to the fume hood exterior with condensed information covering recommended locations for apparatus and accessories.1.5 QUALITY ASSURANCEA. Manufacturer Qualifications:1. The following li
19、st of information will be provide to the Architect at least ten (10) days prior to the bid opening:2. List of manufacturing facilities; 3. Manufacturer of fume hoods shall have the capability within their facility of performing fume hood tests based on the latest ANSI/ASHRAE Specification 110.4. A l
20、ist of ten (10) installations of comparable stature completed within the past 5 years;5. Construction details depicting the materials, sizes and methods of construction;B. Mock-Ups* NOTE TO SPECIFIER * Include a mock-up if the project size and/or quality warrant taking such a precaution. The followi
21、ng is one example of how a mock-up on a large project might be specified. When deciding on the extent of the mock-up, consider all the major different types of work on the project.1. Area mockups shall be as indicated on the shop drawings. Post bid mockup areas must be priced for disassembly and rea
22、ssembly and used within the project.2. Do not proceed with remaining work until installation is approved by Architect.a) Install base cabinet with specified hardware.b) Install fume hood with specified fixtures.1.6 DELIVERY, STORAGE AND HANDLINGA. Packaging, Shipping, Handling and Unloading1. Packag
23、ing: Products shall have packaging adequate enough to protect finished surfaces from soiling or damage during shipping, delivery and installation.2. Delivery: Fume hood delivery shall only take place after painting, utility rough-ins and related activities are completed that could otherwise damage,
24、soil or deteriorate fume hoods in installation areas.3. Handling: Care, such as the use of proper moving equipment, experienced movers, etc., shall be used at all times to avoid damaging the fume hoods. Until installation takes place, any wrapping, insulation or other method of protection applied to
25、 products from the factory will be left in place to avoid accidental damage.B. Acceptance at Site: 1. Fume hoods will not be delivered or installed until the conditions specified under Part 3, Installation section of this document have been met.C. Storage: 1. Fume hoods shall be stored in the area o
26、f installation. If, prior to installation, it is necessary for the fume hoods to be temporarily stored in an area other than the installation area, the environmental conditions shall meet the environmental requirements specified under the Project Site Conditions article of this section.D. Waste Mana
27、gement and Disposal: 1. The supplier of the laboratory fume hoods are responsible for removing any waste or refuse resulting from the installation of, or work pertaining to laboratory fume hoods; thereby leaving the project site clean and free of debris. Trash container(s) to be provided by others.1
28、.7 PROJECT SITE CONDITIONSA. Building must be enclosed (windows and doors sealed and weather-tight);B. An operational HVAC system that maintains temperature and humidity at occupancy levels must be in place;C. Adjacent and related work shall be complete;D. Ceiling, overhead ductwork and lighting mus
29、t be installed;E. Site must be free of any further construction such as “wet work”;F. Required casework must be installed accurately and the project must be ready for fume hood installation.1.8 WARRANTYA. Furnish a written warranty that Work performed under this Section shall remain free from defect
30、s as to materials and workmanship for a period of two (2) years from date of shipment. Defects in materials and workmanship that may develop within this time are to be replaced without cost or expense to the Owner. Defects include, but are not limited to:1. Ruptured, cracked, or stained coating2. Di
31、scoloration or lack of finish integrity3. Cracking or peeling of finish4. Slippage, shift, or failure of attachment to wall, floor, or ceiling5. Weld or structural failure6. Warping or unloaded deflection of components7. Failure of hardwareB. The warranty with respect to products of another manufact
32、urer sold by Mott Manufacturing is limited to the warranty extended by that manufacturer to Mott Manufacturing.PART 2 PRODUCTS2.1 MANUFACTURER* NOTE TO SPECIFIER * Delete or modify the following paragraphs to coordinate with the Owners requirements.A. Acceptable Manufacturer:Mott Manufacturing Ltd.; 452 Hardy Rd. Brantford, ON, Canada N3T 5L8. Tel: (519) 752-7825. Fax: (519) 752-2895. Email: in