中国历史再现与文化体验馆建设项目可行性计划书.docx
《中国历史再现与文化体验馆建设项目可行性计划书.docx》由会员分享,可在线阅读,更多相关《中国历史再现与文化体验馆建设项目可行性计划书.docx(31页珍藏版)》请在冰豆网上搜索。
![中国历史再现与文化体验馆建设项目可行性计划书.docx](https://file1.bdocx.com/fileroot1/2022-11/14/59ffb123-f07a-4467-b25e-20a7c7c498e9/59ffb123-f07a-4467-b25e-20a7c7c498e91.gif)
中国历史再现与文化体验馆建设项目可行性计划书
中国历史再现与文化体验馆建设项目可行性研究报告
项目名称:
中国历史再现与文化体验馆建设项目
工作阶段:
可行性研究
项目地点:
重庆市江北区
项目负责:
董诗娜
项目编制:
董诗娜
贾敏
吴苑萌
陈佳
杨柳
目录·································································2
一、总论·····························································5
(一)项目背景·······················································5
1.项目名称·······················································5
2.项目地点·······················································5
3.项目性质·······················································5
4.项目负责人·····················································5
5.项目组成员·····················································5
6.项目运作方式···················································5
7.报告编制的主要依据·············································5
(二)项目概况·······················································5
1.项目范围·······················································5
2.项目地址·······················································5
3.项目目标·······················································6
4.项目投入总资金和效益···········································6
5.主要经济技术指标···············································6
6.结论···························································6
(三)可行性研究范围·················································7
二、项目背景和发展概况···············································7
(一)项目提出的背景·················································7
1.国家或行业发展概况·············································7
2.项目发起人和发起缘由···········································8
(二)项目发展概况···················································9
(三)投资必要性·····················································9
三、市场分析与建设规模···············································10
(一)全国文化产业市场分析···········································10
(二)市场调查·······················································10
1.拟建项目产出物用途调查·········································10
2.产品现有生产能力调查···········································10
3.替代产品调查···················································10
4.产品价格调查···················································11
5.国外市场调查···················································11
(三)市场预测·······················································11
1.国内市场需求预测···············································11
2.出口可行性分析·················································11
(四)市场推销战略···················································11
1.推销方式·······················································11
2.推销措施·······················································11
3.促销价格制度···················································11
4.产品销售费用预测···············································12
(五)产品方案和建设规模·············································12
1.产品方案·······················································12
2.建设规模·······················································12
四、环境保护与劳动安全···············································12
(一)环境现状分析···················································12
(二)影响环境的因素分析即采取的措施·································12
1.建设期影响环境的因素分析及采取的措施···························12
2.营业期影响环境的因素分析及采取的措施···························13
(三)环境保护·······················································13
1.保护范围······················································13
2.环境保护目标··················································13
3.环境保护措施··················································13
(四)劳动安全·······················································14
1.设计依据·······················································14
2.消防水源·······················································14
3.消防方案·······················································14
五、组织机构与人力资源配置···········································14
(一)项目组织机构···················································14
(二)人力资源配置···················································15
1.人力资源管理及工作人员素质要求·································15
2.工作人员培训···················································15
3.组织机构图·····················································15
六、项目实施进度安排·················································16
(一)项目实施的各阶段···············································16
1.建立项目实施管理机构···········································16
2.资金筹集安排···················································16
3.技术获得与转让·················································16
4.勘察设计与设备·················································16
5.施工准备·······················································17
6.施工和生产准备················································17
7.生产准备······················································17
8.竣工验收······················································17
(二)项目实施进度横道图·············································17
(三)项目实施费用···················································17
1.建设项目管理费·················································17
2.生产筹备费·····················································17
3.生产职工培训费·················································17
4.办公和生活家具购置费······························