温度记录表.xls
《温度记录表.xls》由会员分享,可在线阅读,更多相关《温度记录表.xls(3页珍藏版)》请在冰豆网上搜索。
结构实体同条件试件养护温度记录表工程名称结构类型框剪结构试件名称一层柱E1-13KZ14成型时间2009年9月8日强度等级C40养护时间天数最高温度()最低温度()平均气温()累计气温()备注2009.9.91241318.5018.502009.9.102251218.5037.002009.9.113231418.5055.502009.9.124251620.5076.002009.9.135221518.5094.502009.9.146241318.50113.002009.9.157231619.50132.502009.9.168241318.50151.002009.9.179191617.50168.502009.9.1810231418.50187.002009.9.1911221619.00206.002009.9.2012251520.00226.002009.9.2113261319.50245.502009.9.2214251620.50266.002009.9.2315241519.50285.502009.9.2416231418.50304.002009.9.2517221619.00323.002009.9.2618241318.50341.502009.9.2719231519.00360.502009.9.2820251620.50381.002009.9.2921261420.00401.002009.9.3022251620.5421.502009.10.123241318.5440.002009.10.224261520.5460.502009.10.325221619479.502009.10.426231418.5498.002009.10.527241318.5516.502009.10.628261621537.502009.10.729301924.5562.002009.10.830301723.5585.502009.10.931301824609.50施工现场记录人:
现场监理见证人:
说明:
1、同条件养护试件的等效龄期为日平均温度累计达到600所对应的天数。
2、等效养护龄期不应小于14d,也不应大于60d3、要求同条件养护试件从拆模放到构件旁边与构件同时养护之日起计算每天的日平均气温。
4、如果同一天有多组同条件养护试块的,可以多组同一张记录,但必须记录好所有试块的代表构件名称。
结构实体同条件试件养护温度记录表工程名称结构类型框剪结构试件名称二层梁14FH轴KL5成型时间2009年9月13日强度等级C25养护时间天数最高温度()最低温度()平均气温()累计气温()备注2009.9.141291723232009.9.152281823462009.9.163281923.569.52009.9.17426182291.52009.9.185271722113.52009.9.196281823136.52009.9.207271923159.52009.9.218302025184.52009.9.229281823207.52009.9.2310261721.52292009.9.2411271621.5250.52009.9.2512281823273.52009.9.2613291723296.52009.9.2714301924.53212009.9.2815292024.5345.52009.9.2916281923.53692009.9.30172618223912009.10.1182519224132009.10.219271822.5435.52009.10.320281923.54592009.10.421291622.5481.52009.10.522301723.55052009.10.6232818235282009.10.724301924.5552.52009.10.825301723.55762009.10.926301824600施工现场记录人:
现场监理见证人:
说明:
1、同条件养护试件的等效龄期为日平均温度累计达到600所对应的天数。
2、等效养护龄期不应小于14d,也不应大于60d3、要求同条件养护试件从拆模放到构件旁边与构件同时养护之日起计算每天的日平均气温。
4、如果同一天有多组同条件养护试块的,可以多组同一张记录,但必须记录好所有试块的代表构件名称。