动设备施工方案Rotary EquipmentWord格式文档下载.docx

《动设备施工方案Rotary EquipmentWord格式文档下载.docx》由会员分享,可在线阅读,更多相关《动设备施工方案Rotary EquipmentWord格式文档下载.docx(11页珍藏版)》请在冰豆网上搜索。

动设备施工方案Rotary EquipmentWord格式文档下载.docx

SCREW

FLOW=1410Nm3/h

C-581001A/B/C/D

FLOW=600Nm3/h

Thismethodstatementaimsatrepresentationofthegeneralrequirementsofrotatingequipmentinstallationforthisproject.Forthespecificinstallation,thevendor’sinstructionshouldbefollowed.

CraneinstallationreferstoAppendix1.

1.13.4.2ConstructionProcedure

Asforthegeneralproceduresforrotatingequipmentinstallation,pleaserefertoChart2-1

1.13.4.3EquipmentInstallation

ConstructionPreparation

Technicalpreparation

Editconstructionplan,technicalmeasures,andinstallationmaterialbudgebasedonconstructiondrawings,specificationsandotherrelateddocument.

Constructionstaffpreparation

MobilizeandarrangeconstructionstaffaccordingtotheConstructionPlan.Alltheconstructionpersonnelshouldbegivenatechnicalinstructionandsafetyinstructioninordertomakethemunderstandtheprocesscharacteristics,machine'

soperationconditionandperformance,constructiontechnicalplanandthestructureofthemachine,andtomakethemgraspconstructionprocedure,methods,andthekeypointsofspecialprocess.

Toolsandmaterialspreparation

Tomakesurealltheinstallationtools(forrigging,disassemblyandchecking),shims,andconsumablematerialareavailable.

Sitepreparation

Thesiteissuitableforinstallationwork,e.g.,roadsareavailable,disassemblingworkareacouldbefreefromrain,snow,wind,sand,butwithgoodilluminationconditionandventingcondition.

●Thecivilworksaroundtherotaryequipmenthasbeenbasicallycompletedandscaffolding,rubbishetc.arecleanedout.

●Water,electricpower,airareavailable.

●Firefightingdevicesareavailable.

OpenPackageInspection

TheOpenPackageInspectionfortheequipmentiscarriedoutbytheowner,generalcontractor,thepersonnelforsupplyandtechniquesoftheconstructioncompaniestogether.

FoundationAcceptanceandTreatment

There-examinationforeachsizeofthefoundationshouldbecompliedwithTable3-1.

Table3-1  AllowableDeviationforSizeofFoundation

No.

InspectionContent

AllowableDeviation(mm)

1

coordinatepositionofthefoundation(longitudinalandhorizontalcenterline)

±

20

2

elevationsfordifferentplanesofthefoundation

+0/-20

3

Outlinedimensionoftheupperplaneonthefoundation

Outlinedimensionsforthebossoftheupperplane

-20

recesssize

+20

4

levelnessoftheupperplaneofthefoundation(includingthepartswhereinstalledequipmentontheterrace)

eachmeter

5

wholelength

10

verticaldeviation

6

embeddedanchorbolt

elevation(topend)

+20/-0

centerdistance(measuredrespectivelyatfootandtop)

7

Reserved

anchorbolthole

centerposition

Depth

-0

verticalityoftheholewall(wholedepth)

EquipmentPositioning,levelingandcentering

●PreparationbeforeEquipmentInstallation

●ShimPlateSetting

●Whentheequipmentisadjusted,theshimsoradjustingterminalstrandsshallbeputundertheequipmentbasetodoprimarycenteringandleveling.TheallowabledeviationoftheplanepositionandelevationforthelongitudinalandhorizontalcenterlineofthebaseshouldbecompliedwithTable3-2.

Table3-2 AllowableDeviationforInstallationPlanePosition

AndElevationofEquipmentBase

Item

PlanePosition

Elevation

whenthereisnodirectconnectionwithotherequipment

whenthereisdirectconnectionwithotherequipment

●Thelevelingandprecisecenteringworkoftheequipmentshouldbecompliedwiththerequirements.

Table3-3 AlignmentDeviationandEndsurfaceClearance

oftheElasticSleevePinCoupling(mm)

ExteriorDiameterofCoupling

EndSurfaceClearance

AlignmentDeviation

LongitudinalDisplacement

Axial

Tilting

AxialTilting

71

<

0.04

0.2/1000

224

0.05

0.2/

1000

80

250

95

315

0.08

106

400

130

475

160

600

0.10

190

SecondaryGroutingoftheEquipment

RequirementsforInstallationandpipingoftheAttachedEquipment

1.13.4.4Test-runofSingleUnit

ConditionsbeforeTest-run

●Theequipmentinstallationisfinished,alltheinstallationrecordsarecomplete,theworkiscompliedwiththerequirementsofthespecificationandthetechnicaldocuments,thesecondarygroutingischeckedandconfirmedwhichhasreachedthedesignstrength,theanchorboltshavebeenfastenedandthefinishingworkiscompleted.

●AttachedEquipmentandPipingSystem

●Theconstructionforsuchutilityasthecoolingwater,circulatingwater,gasandsteamneededfortest-runisfinishedandreadyforuse.

●Theelectricalandinstrumentarequalifiedaftercalibrationandtheinterlockprotectionissensitiveandprecise.

●Theoiltank,bearingboxandgearboxhavebeenchargedwithlubricatingoil(grease)accordingtotherequirement.

●Theoilsystemoftheequipmentwithlubricatingoilsystemandsealingoilsystemisqualifiedaftertheoilcirculation.

●Theinletofthepumpandthefanisrequiredfilteringmesh;

whoseeffectiveareashouldnotbelessthantwiceoftheinletcrosssection.

●EnvironmentalRequirementforTest-runField.

●Theall-aroundinspectionshouldbedonebeforethetest-run:

●Thetemporarysystemandfacilitiesfortest-runarefinishedandmeettherequirement.

Test-runforSinglePump

●Themediumforequipmenttest-runisusuallycleanwater,butforthepumpforbiddingusingwater,suchchemicalmaterialasmethanol,etccanbeused.

●Whenthepumpstarts,thefollowingregulationsshouldbeexecuted:

●Thepumptest-runshouldcomplywiththerequirements.

Table4-1VibrationValueoftheBearing

RotatingSpeed

(rpm)

Bi-directionAmplitudeattheBearingnotmorethan(mm)

≤375

0.18

>

375~600

0.15

600~750

0.12

750~1000

1000~1500

1500~3000

0.06

3000~6000

6000~12000

0.03

12000

0.02

Note:

Thevibrationvalueshouldbemeasuredonthebearingbody(axialdirection,verticaldirectionandhorizontaldirection).

●Afterthetest-runofthesinglepumpisqualified,thesubsequentworkshouldbedonewell;

suchascheckingthefasteners,chargingthetest-runmediumandrestoringthesystem,etc.

Test-runoftheSingleUnitoftheFan

●Thestartupofthefanshouldbecompliedwiththeregulations.

●Thetest-runshouldbecompliedwiththerequirements.

Test-runofOtherSingleMechanicalEquipment

Test-runoftheMotor

RequirementforTest-runofSingleUnit

●Thebarringinspectionshouldbedonebeforethestartanditshouldbeflexibleinrotation;

●Startingmachineaspertherequirementofthetechnicaldocument;

●Therunningoftheequipmentisstableandsmoothwithoutabnormity;

●Themechanicalvibrationvalueshouldbetestedwhichisqualifiedwhenitiscompliedwiththeregulationsofthespecificationandthetechnicaldocumentofthemanufacturer;

thevalueisusuallynotmorethan0.10mm;

●Thetemperatureofeachpartofthemachineshouldbecompliedwiththerequirementofthemechanicaloperationinstruction;

●Thecurrentofthemotorshouldbestableandthereshouldbenosuddenchange;

●Thereisnoleakageateachsealingpartofthemachine;

●Theelectrical,instrumentcontrolunitandprotectiveunitrunwellwithpreciseaction;

●Theequipmentandpipelinesystemworknormallywithoutabnormalsoundandleakage;

●Thetimefortest-runwithload(orwithoutload)isusuallynotlessthan2haspertheregulationsofthespecificationandthetechnicaldocumentofthemanufacturer.Duringthecourseofthetest-run,themachineandequipmentshouldworkstablyandeachparametershouldreachtherequiredvalue;

Afterthetest-runofthesingleequipmentisqualified,thesubsequentworkshouldbedonewell,includingdischargingthemedium,dismountingthetemporaryfacilitiesandtherestoringwork.

Appendix1:

Installationschemeforcrane(electricdoublerailscrane)

1Constructionbrief

Thiscraneisappliedintheaircompressorplant.Thecraneiselectricdoublerailscraneandtheliftingcapacityis5.0t.Themaximumliftingheightis6.0mandthespanis18m.Thecranewillbeinstalledontherooftheaircompressorplant.

2References

Equipmentdatasheet;

Data:

includingbiddingdocumentsandconstructiondrawings.

3Constructionprocedureandrelevantmeasures

Inspectionofincomingmerchandise

OpenboxauditshallbecarriedouttogetherwithrepresentativesofCOMPANY,supervision,vendorsandconstructor.Thefollowingtechnicaldatashallbecompletebeforeopenboxaudit:

●Equipmenttechnicaldocuments;

●Equipmentproductioncertificationandnecessaryproductiontestrecord;

●Equipmentpackagelist.

Thefollowingcontentsshallbeinspectedduringopenboxaudit:

●Checkifthetype,specificationandquantityofequi

展开阅读全文