DocumentOwner(s)
Project/OrganizationRole
ManuDebrand
ProjectCoordinator
ProjectStatusReportVersionControl
Version
Date
Author
ChangeDescription
1.0
12/19/13
SalPaleo
Documentcreated
2.0
12/20/13
CreateactionswithPowerandNetworkdivisionengineeringteams
3.0
01/06/14
Addactionownersandproposeddeadlines
4.0
01/10/14
FinalizeactionsanddeadlinesforCiscopresentation
5.0
02/05/14
UpdateonPoweractions
6.0
02/27/14
GerardJennings
Updateactions
7.0
05/14/14
TABLEOFCONTENTS
1PROJECTSTATUSREPORTPURPOSE3
2PROJECTSTATUSREPORT3
2.1ProjectStatusReportDetails
4APPENDICES14
4.1DocumentGuidelines14
4.2ProjectStatusReportSectionsOmitted14
1
PROJECTSTATUSREPORTPURPOSE
MeettheCiscoQpscoreof≥80.Achieve50DPPMforTransformersand5DPPMforInductorsbyJune2014.
2PROJECTSTATUSREPORTTEMPLATE
2.1ProjectStatusReportMilestones
ProjectName
SalPaleo&
ManuDebrand
Date:
12/20/2014
ReportingPeriod:
01/15/2014to05/31/2014
ProjectOverallStatus:
DefinitionsoftheactionstoanswertheninemilestonesrequiredbyCisco
ProjectSummary:
ActionsdefinedpresentationtoCisco.
MilestoneDeliverablesperformancereporting
MilestoneDeliverables
DueDate
%Completed
DeliverableStatus/Risk
Milestone1:
1)NonewQualityevents:
LineAlerts,LineStops,StopShips,FieldFailures,CAPandUmpire
∙M1.1.1.ReviewallexistingPowerCisco&
non-Ciscoproducts(406designs)fordesignandtestcompliance.IssuePCNandECNasrequired.Owner:
VictorAldaco
02/28/14
(Power)
100%
(Power)
Complete:
ReviewandECNcompleted,2PCNissued.PCN14-032,PCN14-033
Riskimpact:
High
∙M1.1.2.ReviewallCiscoNetworkproductcomplaintsandelectricaltestyieldtodefineimprovementactionsondesign,testorprocess.Owner:
ManuDebrand&
RichardFincher
(Network)
Complete.ReviewedbyElectrical,Mechanical,andTestteamsImprovementactionplangeneratedineacharea.
Risk:
∙M1.1.3.ImplementtheDrawingTemplateforallPowernewdesignsforCisco.OwnerVictorAldaco
09/01/13
Completed
∙M1.1.4.DevelopDrawingTemplateforNetwork,implementonnewdiscretedesignsforCisco.Owner:
01/31/14
Completed
∙M1.1.5.ReviewthepresentOn-goingReliabilitymonitoringsysteminPulseproductionandidentifyopportunitiestoimprovethetestschemeandduplicatetheCiscotestplanonafamilybasis.Owner:
YTChoo
comparisonandpresentationoftestplancompleted.Reviewoftestconditionscompleted.MPOhasstartedthetestingfromAprilonwards.
Medium
∙M1.1.6.Defineplantoimplementautomatedvisualinspectionatpackingareatodetectmix/wrongpartsandwrongorientationforpartsinreels.Owner:
07/01/14
Complete-PlandefinedBudgetapproved,1systeminplace,7scheduled.
∙M1.1.7.Defineplantoimplementautomatedvisualinspectionatpackingareatodetectmix/wrongpartsandwrongorientationforpartsinreels.Owner:
Completed.Budgetof$22kallocatedinapprovedCapEx2014Planformaterials,100%productioncoveragebyJune27,2014.
∙M1.1.8.Verifytrays,tubes,carriertapesforproperpartfittopreventpartandleaddamage.Owner:
04/01/14
Atotalof74packingmaterials(54trays,13tubes,and7carriertapes)wereidentifiedandwhichareusedin5manufacturinglocationstopackandship198magneticdiscreteproducts.
55wereverifiedforspeccomplianceandforproperpartfit.
Nodemandorinventoryfortheremaining19packingmaterialsandtheircorresponding45products,thesewillbeverifiedifandwhenthereisdemandfortheapplicablefinishedproducts.
∙M1.1.9.Verifytrays,tubes,carriertapesforproperpartfittopreventpartandleaddamage.Owner:
ReviewCompleted,Noissuesobserved.
∙M1.1.10.Defineplanforincominginspectiononpackingmaterialaffectingproducts.
Owner:
KSFung
02/28/2014
CompletedWk13.
Milestone2:
1)Developandimplementabalancedscorecardapproachtomeasureandmanagemanufacturinglocations-PulseOperationsandCM’s.
∙M2.1.1.DevelopscorecardandrulestoaddressproblematicareasatPulseOperationsandCMs.Owner:
ColmanTs