Abstract:
ThepermanentshiplockofThreeGorgesshiplockfortwo-fiveconsecutivetotallengthof6442m,oneofthemainsection1637m.Excavationoftwophases:
anexcavationofalargeareaexcavationtoexposethetopandSouth,theNorthSlopeExcavation;
twoaremainlyfortheexcavationofthemainsegmentlockslotcutexcavation.Supportconstruction,includingslope,chamberwall,supporting,mainlyAnchor,anchor,sprayconcreteandothersupportmethod.Supervisionbytakingcontrolofdynamiccontrolandkeycombinationofpre-pre-control,processmonitoringandpost-inspectionmethodofcombiningpairsofon-siteconstructionqualitycontrol.
Keywords:
:
ThreeGorgesshiplockconstructionsupervisionofexcavationandsupport
1ProjectOverview
1.1Thesizeoftheproject
LayoutofthepermanentshiplockofThreeGorgesProjectonthenorthsideofthedamontheleftbankTanziLing,forfiveconsecutivetwo-lock,lengthof6442m,inwhichtheupstreamapproachchannellength2113m,thedownstreamapproachchannel2722m,lockthemainsectionof1637mThetotalhead113.0m,single-stagechambermaximumworkinghead45.2m,theeffectivechambersizeof280m×
34m×
5m(length×
width×
thresholdonthedepth),designedannualcapacityofone-wayshippingfor50milliont,DepartmentoftheThreeGorgesProjectthemainnavigationstructure.
Excavationandanchorretainingtheamountofmajorprojects:
Thetotalexcavationquantityis41.45millionm3,ofwhichanexcavationquantities18millionm3,twoexcavationquantity2345Wanm3;
anchor4182beam,high-strengthbolt98715.
1.2Excavationof
Thepermanentshiplockexcavationandanchorsupportconstructionintwophases,alarge-scaleexcavationofthemaingatetothetopoverthetopexcavationandslopeexcavationtoexposeamaximumslopeheightis170m,toensuretheslopeintheconstructionandsubsequentoperationduringthesecurityandstability,NaiShi1excavationandconstructionofthekeyanchor;
2excavatedinaprojectbasedonthechamberintothetankexcavation,maximumdepthof68m.
1.3anchorsupportconstruction
Ananchorsupportconstructioninordertomaintainthestabilityofthehighslopeforthepurposeofthesystemontheslope,anchorreinforcement,thesurfaceofsprayedconcretehangingnetclosed;
twoconcentratedinthegateslotsupportingverticalwall,themainsub-anchor,anchorsprayedconcreteandothertypesofsupportmethod.Anchorsystemscanbeclassifiedaccordingtothenatureoftheroleofanchorandrandomanchor,accordingtobondintoacohesivemannerandnon-bondedanchoranchor,accordingtosupportingtheformisdividedintothefirstanchorandtherighttowearsideanchor,accordingtoloadsizeisdividedinto1000kN,and3000kN-classAnchordesignaccordingtodifferentpositions,blockthesizeofthedifferentanchorreinforcementapproach.Boltalsosubsystemsandrandomanchorbolttwocategories,thesystemisdividedintoordinaryboltanchoraccordingtomaterial,highstrengthbolt(Ⅴgradesteel)twokinds.High-strengthboltbytheforceofasingle450kN,istheanchoringoftheimportantanddifficult,bothplayedontherockanchorrole,butalsototheliningwallofconcretehangingfrombranchessupportingtheroleofthepermanentshiplockisconsideredthe“lifeline”projects.
Twoon-sitequalitycontrol
2.1Qualitycontrolmethods
Supervisionofengineeringandprocessmodules,process-basedqualityprogramsinengineering-oriented,quantitative,andthewholeprocessoftotalqualitycontrol,concretecanbesummarizedas“three-three”systemofcontrolmeasures,knownas“threestage”control,“3inspectionsystem“control,”three-level“control.
2.1.1“Threestage”Controlof
“Three-stage”controlmeans“pre-control”,“programmed”and“endcontrol.”
1)“pre-control”astheexantecontrolis“activecontrol”ofthemaincontents,supervisionofconstructionbyqualifiedcontractorstoreviewtheorganizationoftheconstructionscheduleandconstructiontechnicalmeasuresforapproval,inspectioncontractorstoqualityassurancesystem,technicalmeasuresreallyimplemented,andorganizationaldesigntests,beoftechnicalproblems.Supervisionofinternalorganizationtoemphasizetheimplementationandpersonnelinplace,andthepreparationofthecorrespondingoperatingproceduresandsupervisionoftheimplementationofrulestoregulatetheon-sitesupervisionofbehavior,themeasureshavebeenimplementedonlyincaseswhereonlyallowedtoofficiallystarttheconstructionandsigntheorder.
2)“programmed”thattheconst