the permanent ship lock of three gorges construction excavation and support of quality control分析Word下载.docx

上传人:b****4 文档编号:13829776 上传时间:2022-10-13 格式:DOCX 页数:7 大小:19.79KB
下载 相关 举报
the permanent ship lock of three gorges construction excavation and support of quality control分析Word下载.docx_第1页
第1页 / 共7页
the permanent ship lock of three gorges construction excavation and support of quality control分析Word下载.docx_第2页
第2页 / 共7页
the permanent ship lock of three gorges construction excavation and support of quality control分析Word下载.docx_第3页
第3页 / 共7页
the permanent ship lock of three gorges construction excavation and support of quality control分析Word下载.docx_第4页
第4页 / 共7页
the permanent ship lock of three gorges construction excavation and support of quality control分析Word下载.docx_第5页
第5页 / 共7页
点击查看更多>>
下载资源
资源描述

the permanent ship lock of three gorges construction excavation and support of quality control分析Word下载.docx

《the permanent ship lock of three gorges construction excavation and support of quality control分析Word下载.docx》由会员分享,可在线阅读,更多相关《the permanent ship lock of three gorges construction excavation and support of quality control分析Word下载.docx(7页珍藏版)》请在冰豆网上搜索。

the permanent ship lock of three gorges construction excavation and support of quality control分析Word下载.docx

Abstract:

ThepermanentshiplockofThreeGorgesshiplockfortwo-fiveconsecutivetotallengthof6442m,oneofthemainsection1637m.Excavationoftwophases:

anexcavationofalargeareaexcavationtoexposethetopandSouth,theNorthSlopeExcavation;

twoaremainlyfortheexcavationofthemainsegmentlockslotcutexcavation.Supportconstruction,includingslope,chamberwall,supporting,mainlyAnchor,anchor,sprayconcreteandothersupportmethod.Supervisionbytakingcontrolofdynamiccontrolandkeycombinationofpre-pre-control,processmonitoringandpost-inspectionmethodofcombiningpairsofon-siteconstructionqualitycontrol.

Keywords:

:

ThreeGorgesshiplockconstructionsupervisionofexcavationandsupport

1ProjectOverview

1.1Thesizeoftheproject

LayoutofthepermanentshiplockofThreeGorgesProjectonthenorthsideofthedamontheleftbankTanziLing,forfiveconsecutivetwo-lock,lengthof6442m,inwhichtheupstreamapproachchannellength2113m,thedownstreamapproachchannel2722m,lockthemainsectionof1637mThetotalhead113.0m,single-stagechambermaximumworkinghead45.2m,theeffectivechambersizeof280m×

34m×

5m(length×

width×

thresholdonthedepth),designedannualcapacityofone-wayshippingfor50milliont,DepartmentoftheThreeGorgesProjectthemainnavigationstructure.

Excavationandanchorretainingtheamountofmajorprojects:

Thetotalexcavationquantityis41.45millionm3,ofwhichanexcavationquantities18millionm3,twoexcavationquantity2345Wanm3;

anchor4182beam,high-strengthbolt98715.

1.2Excavationof

Thepermanentshiplockexcavationandanchorsupportconstructionintwophases,alarge-scaleexcavationofthemaingatetothetopoverthetopexcavationandslopeexcavationtoexposeamaximumslopeheightis170m,toensuretheslopeintheconstructionandsubsequentoperationduringthesecurityandstability,NaiShi1excavationandconstructionofthekeyanchor;

2excavatedinaprojectbasedonthechamberintothetankexcavation,maximumdepthof68m.

1.3anchorsupportconstruction

Ananchorsupportconstructioninordertomaintainthestabilityofthehighslopeforthepurposeofthesystemontheslope,anchorreinforcement,thesurfaceofsprayedconcretehangingnetclosed;

twoconcentratedinthegateslotsupportingverticalwall,themainsub-anchor,anchorsprayedconcreteandothertypesofsupportmethod.Anchorsystemscanbeclassifiedaccordingtothenatureoftheroleofanchorandrandomanchor,accordingtobondintoacohesivemannerandnon-bondedanchoranchor,accordingtosupportingtheformisdividedintothefirstanchorandtherighttowearsideanchor,accordingtoloadsizeisdividedinto1000kN,and3000kN-classAnchordesignaccordingtodifferentpositions,blockthesizeofthedifferentanchorreinforcementapproach.Boltalsosubsystemsandrandomanchorbolttwocategories,thesystemisdividedintoordinaryboltanchoraccordingtomaterial,highstrengthbolt(Ⅴgradesteel)twokinds.High-strengthboltbytheforceofasingle450kN,istheanchoringoftheimportantanddifficult,bothplayedontherockanchorrole,butalsototheliningwallofconcretehangingfrombranchessupportingtheroleofthepermanentshiplockisconsideredthe“lifeline”projects.

Twoon-sitequalitycontrol

2.1Qualitycontrolmethods

Supervisionofengineeringandprocessmodules,process-basedqualityprogramsinengineering-oriented,quantitative,andthewholeprocessoftotalqualitycontrol,concretecanbesummarizedas“three-three”systemofcontrolmeasures,knownas“threestage”control,“3inspectionsystem“control,”three-level“control.

2.1.1“Threestage”Controlof

“Three-stage”controlmeans“pre-control”,“programmed”and“endcontrol.”

1)“pre-control”astheexantecontrolis“activecontrol”ofthemaincontents,supervisionofconstructionbyqualifiedcontractorstoreviewtheorganizationoftheconstructionscheduleandconstructiontechnicalmeasuresforapproval,inspectioncontractorstoqualityassurancesystem,technicalmeasuresreallyimplemented,andorganizationaldesigntests,beoftechnicalproblems.Supervisionofinternalorganizationtoemphasizetheimplementationandpersonnelinplace,andthepreparationofthecorrespondingoperatingproceduresandsupervisionoftheimplementationofrulestoregulatetheon-sitesupervisionofbehavior,themeasureshavebeenimplementedonlyincaseswhereonlyallowedtoofficiallystarttheconstructionandsigntheorder.

2)“programmed”thattheconst