1、2 ENVIRONMENTAL MANAGEMENT PLANAktogay Copper ProjectConstruction Healthy and Safety PlanENVIRONMENTAL MANAGEMENT PLAN11373-DB-NFC-0000-PLN-OOO-N-0002121/10/2014IFR Chen JianXu XuYang Guojun012/10/2014IFR Chen JianXu XuYang GuojunREV #DATEREASONORIGINATOR CHECKEDAPPROVED修正变更通知表RevisionLocation of ch
2、angesDescription of changeChanged by (Name)版次变更位置变更说明变更人(姓名)TABLE OF CONTENTS目录1. INTRODUCTION 1211.1 PURPOSE 1211.2 SCOPE 1211.3 DISTRIBUTION AND INTENTED AUDIENCE 1221.4 DEFINITIONS, ACRONYMS AND ABBREVIATIONS 1221.4.1 GENERAL DEFINITIONS 1221.5 REFERENCE DOCUMENTS AND LINKS 1222. ROLES AND RESPON
3、SIBILITIES 1233. GENERAL REQUIREMENTS 1243.1 Environmental Management 1243.1.1 Environmental Policy 1243.2 Environmental Objectives for the Construction Phase 1253.3 Environmental Management System (EMP) 1253.2 Environmental Management 1263.2.1 Identification of Legal and Other Requirements 1273.2.2
4、 Identification of Environmental Aspects 1273.2.3 Establishment of Environmental Plans and Procedures 1273.2.4 Environmental Permits 1273.3 General Environmental Requirements and Procedures 1283.3.1 Waste Management 1283.3.2 Dust Control 1293.3.3 Handling of Fuels, Lube Oils and Chemicals 1293.3.4 S
5、ewage and Wastewater 1303.3.5 Vegetation and Topsoil 1303.3.6 Groundwater 1303.3.7 Noise Control 1313.3.8 Housekeeping and Tidiness 1313.3.9 Traffic Planning and Control 1313.3.10 Archaeological Artifacts 1323.3.11 Emergency Preparedness 1323.3.12 Control and Monitoring 1323.3.13 Information, Traini
6、ng 1333.3.14 Reporting 1333.3.15 Communication with the Community and Other Stakeholders 1331. 引言 1211.1 目的 1211.2 范围 1211.3 发行及目标对象 1221.4 定义、首字母缩略词及缩略语 1221.4.1 一般定义 1221.5 参考文件与链接 1222. 职务与职责 1233. 一般要求 1243.1 环境管理 1243.1.1 环境方针 1243.2 建设阶段的环境目标 1253.3 环境管理体系(EMS) 1253.2 环境管理 1263.2.1 确认法律及其他要求 1
7、273.2.2 确定环境因素 1273.2.3 建立环境计划及程序 1273.2.4 环境许可 1273.3 一般环境要求及程序 1283.3.1 废物管理 1283.3.2 防尘 1293.3.3 燃料、润滑油及化学品的处理 1293.3.4 污水及废水 1303.3.5 植被及表层土 1303.3.6 地下水 1303.3.7 噪声控制 1313.3.8 文明施工 1313.3.9 交通规划及控制 1313.3.10 考古文物 1323.3.11 应急准备 1323.3.12 控制及监控 1323.3.13 信息及训练 1333.3.14 报告 1333.3.15 与社区及其他利益相关者进
8、行沟通 1331. INTRODUCTION1. 引言1.1 PURPOSE1.1 目的The purpose of this Environmental Management Plan (EMP) is to:本环境管理计划(EMP)旨在: define the main legal basis for the NFC Copper Project related to environmental matters during construction; 明确建设期间NFC铜矿项目环境问题相关的主要法律依据; define NFCs main environmental objectives
9、 related to the construction phase; 明确NFC建设阶段相关的主要环境目标; describe the NFC Copper Project management system with respect to environmental matters including lines of responsibility and lines of communication; 说明NFC铜矿项目与环境问题相关的管理体系,包括责任与通信结构线路; define NFC requirements to contractors environmental manage
10、ment systems, planning and implementation; 明确NFC对于承包商环境管理体系、规划以及实施的要求; define NFC requirements to emergency response procedures related to spills and other environmental accidents; 明确NFC对泄漏事故及其他环境事故相关之应急响应程序的要求; define NFC requirements to environmental reporting and handling of the reports; 明确NFC对于环
11、境报告及报告处理的要求; define requirements to employee environmental induction and training; 明确对于员工环境入职教育及培训的要求; give an overview of expected environmental impacts related to the construction phase and commitments with respect to control, mitigation and monitoring. 概述建设阶段的预期环境影响以及在控制、缓和及监控方面的承诺1.2 SCOPE1.2 范围
12、The EMP for the construction phase is a subordinate document to the document HSE Requirements in Construction.建设阶段的环境管理计划(EMP)作为施工中的健康安全与环境(HSE)要求的附属文件。1.3 DISTRIBUTION AND INTENTED AUDIENCE1.3 发行及目标对象The implementation and ongoing maintenance of this Environmental Management Plan is the responsibil
13、ity of the Project Safety Manager.项目安全经理负责本环境管理计划的实施及持续维护。Revisions to the Health and Safety Plan shall be made as required to reflect the current status of the Works and a record of each revision detailing the nature and scope of the change maintained.应按照规定修订健康与安全计划,以便反映出工程的当前状态以及每次修订的记录(详细说明记录的变更性
14、质及范围)。1.4 DEFINITIONS, ACRONYMS AND ABBREVIATIONS 1.4 定义、首字母缩略词及缩略语1.4.1 GENERAL DEFINITIONS1.4.1 一般定义EIAEnvironmental Impact AssessmentEMPEnvironmental Management PlanEMSEnvironmental Management SystemHSEHealth, Safety and EnvironmentRoKRepublic of KazakhstanEIA环境影响评价EMP环境管理计划EMS环境管理体系HSE健康安全与环境RoK
15、哈萨克斯坦共和国1.5 REFERENCE DOCUMENTS AND LINKS1.5 参考文件与链接The main legal basis for the NFC Copper Project is:NFC铜矿项目主要法律依据为: Environmental Protection Code 212 (2007) (2007年)第212号环境保护法 Spill Prevention Control 泄漏防控法In addition to the above, Kazakhstan is signatory to a number of international conventions,
16、which have to be respected. An overview is given in the EIA.除以上法规外,哈萨克斯坦签署了若干需遵守的国际公约。在环境影响报告中做了概述。2. ROLES AND RESPONSIBILITIES2. 职务与职责NFC Copper Project Management Team has identified the responsibilities and regulatory requirements and assigned authority to key personnel within the organisation t
17、o ensure the obligations and responsibilities are met. NFC铜矿项目管理团队已认定了职责与监管要求,并将权力授予组织内部主要工作人员,以保证义务与职责得以满足。All roles listed below will have detailed position descriptions.以下所有职务的详细职位说明。Senior Site Representative: Responsibility for the implementation, continuation, integration into construction and
18、 pre-commissioning activities, and continuous improvement of the EMP rests with the Senior Site Representative. The main duties are:1) To organize and establish the project management system.2) To organize and formulate the environmental management plan.3) To establish and adjust the organization fr
19、amework of project environmental management system, to formulate the duty and authority.4) To organize inter audit of project environmental management system, and to assist branch firm organize the management reviews. 5) To provide the resource in order to keeps the environmental management system o
20、perating effectively. 高级现场代表:高级现场代表负责环境管理计划的实施、持续、建设整合、预调试活动以及持续改进。具体职责为:1)组织构架项目环境管理体系;2)组织制订环境管理计划;3)建立和调整项目环境管理体系的组织机构,规定岗位职责和权限;4)组织项目环境管理体系内部审核,并协助分公司组织管理评审;5)确保为环境管理体系持续有效运行所需的资源。Site HSE Manager: Responsibility for the management of the overall HSE function on the PROJECT rests with the Site
21、HSE Manager. The Site HSE Manager shall also be responsible to insure the conduct of weekly meetings. The main duties are:1) To assist project manager managing the environmental management system.2) To participate the formulation and operation of environmental guideline, environmental objectives and
22、 indexes.3) To responsible for organize the project management staff to learn the laws and regulations relate to environment.4) To responsible for the training and implementation of environmental management system and document.5) To responsible for the communication works of environmental informatio
23、n.6) To responsible for providing the environmental guideline and other relating documents.7) To responsible for the organization work of external audit.8) To responsible for publicity of environmental guideline and objectives.现场健康安全与环境(HSE)经理:现场HSE经理负责项目健康安全与环境(HSE)的整体功能管理。现场健康安全与环境(HSE)经理还负责保证周会的进
24、行。具体职责为:1).协助项目经理管理环境管理体系;2.). 参与制订并贯彻执行环境方针、环境目标和指标;3). 负责组织项目管理人员学习与环境相关的法律、法规;4). 负责环境管理体系标准、环境管理体系文件的培训和指导实施;5). 负责环境信息的沟通工作;6). 负责向相关方提供环境方针及相关文件;7). 负责接待外部审核的组织工作;8). 负责环境方针、目标的对外宣传。Site Environmental Engineer: Shall be responsible for the establishment, implementation, and maintenance of the
25、EMP. Regardless of any other duties, he shall be responsible for reporting to management on the performance of the EMP, review, and recommendations for improvement. The main duties are :1. To participate in establishment of project environmental management plan.2. To assist site manager training the
26、 management staff about environmental management system standard and other documents relating to it.3. To responsible for assigning the environmental objectives and indexes to each staff, and ensure the implement of specific management measure.4. To responsible for monitoring the work of each respon
27、sible staffs implementation of environmental management plan. If any work is unqualified, proposing reform and ensure to complete it.5. To responsible for the training of potential accident or emergency situation, and emergency measure. 6. To establish an environment account, inspect the implementat
28、ion of budget. And keep the expense record relating to the environmental cost.7. To responsible for organize the investigation, analysis, solution and report of environmental accident.8. To responsible for the internal audit of project environmental management system.现场环境工程师:应负责建立、实施及维护环境管理计划。除其他任何职
29、责外,现场环境工程师应负责向环境管理计划实施的管理人员报告,审核、并提出改进建议。具体职责:1. 参与编制项目环境管理计划;2. 协助现场经理对管理人员进行环境管理体系标准、环境管理体系文件的培训;3. 负责分解各项环境目标和指标至相关责任人,并落实具体管理措施;4. 负责监督各相关责任人执行环境管理计划的情况,对出现的不合格项及时提出整改,并督促落实到位;5. 负责对全体人员进行潜在事故、紧急情况及应急措施的培训;6. 建立环保台帐,检查预算的落实情况,保存有关环保费用的支出记录;7. 负责组织环境事故的调查、分析、处理和报告。8. 负责项目环境管理体系的内部审核。Project Engin
30、eering: Shall be responsible to ensure that all engineering and procurement is conducted in support of the EMP.项目工程:应负责确保所有工程及采购活动的实施以环境管理计划的配套为基础。Materials Managers: Shall be responsible for ensuring that all chemical products procured for and/or received on site are accompanied by a Material Safety Data Sheet.物料经理:应负责确保为现场采购和/或收到的所有化学品都附有物料安全数据表。Document Control: Shall be responsible for the formal notification and distribution of documents supporting the EMP.文件管控:应负责支持环境管理计划的文件的正式通知及分发。NFC-HSE Staff: Shall be respon
copyright@ 2008-2022 冰豆网网站版权所有