1、150kV升压站受电方案附电气主接线图课件项目编号密 级专业代号目录号印尼Batam TJK 265MW燃煤电站工程150kV升压站受电方案 150kV Energizing of 150kV Switching Station Commissioning Procedure二一二年三月March 2012编制:Complied by:审核:Reviewed by:批准:Approved by:华电电力科学研究院Huadian Electric Power Research Institute2012年3月March 2011 1 受电范围及目标.11 Scope of energizing.
2、12 引用标准及规范.12 Referring standard & regulation.13 受电设备调度命名与编号.23 Name & index of energized equipments.24 受电组织及技术措施. .74 Organizational measures for Energizing.75 受电前设备运行方式要求.145 Pre-requirements of operation mode before energizing for energized equipments.146 150kV线路及母线受电步骤.196 Energized procedure fo
3、r 150kV line & busbar.197 安全注意事项.337 Safety precaution.338 危险点预控措施.358 Prevention measures for dangerous points.351 受电范围及目标 Scope & object of energizing1.1 受电范围 Scope of energizing印尼巴淡Tanjung Kasam燃煤电站开关站受电范围:Energizing scope for Tanjung Kasam substation of 265MW coal-fired power plant:1) Muka Kunin
4、g线路1(7间隔);Line 1 to Muka Kuning substation (bay 7)2) Batu Besar线路2(9间隔);Line 2 to Batu Besar substation(bay 9)3) Tanjung Kasam开关站母线I;Busbar I4) Tanjung Kasam开关站母线II;Busbar II5) 母联线路(5间隔)。Busbar coupler(bay 5)注:根据工程进度上述受电过程可能分几个阶段完成。Note:energizing of substation may be finally completed in some stage
5、s according to the progress of project.1.2 受电目标 Energizing object1) 通过对150kV升压站、6kV设备进行必要的调整和试运,来考察相关电气设备的设计、安装质量,了解系统设备的运行特性,以便厂用电系统能够长期、安全和稳定地运行,为下一步机组的分部试运提供安全可靠的电源,满足机组正常运行的要求。 Necessary test and adjustment of 150kV substation and 6kV equipment are done for checking quality of equipment design a
6、nd installation, at the same time operation characteristic of these equipment is gotten, but the final aim is keeping auxiliary power supply in long-term, safe and steady operation and providing the safe and reliable power for next subsystem commissioning step.2) 保证验评表优良率达到100%。Ensure that items in
7、acceptance and assessment sheet are all upto excellent standard.3) 在调试过程中严格按照控制措施对重要环境因素和不可容许风险进行控制,防止发生火灾及高空坠落,防止CT开路、PT短路,防止变压器损坏。Important environment factor and nonpermit venture are monitored according to the procedure in commissioning stage, in order to prevent fire, falling from a height, CT
8、in opened, PT in short-circuit and transformer damaged.2 引用标准及规范 火电工程调整试运质量检验及评定标准(2006年版); Inspection and Assessment Standard of Thermal Power Plant Project Commissioning 中国华电集团火电达标投产考核办法(2008年版); China Huadian Group Evaluation Method for Thermal Power Plant Putting into Production Standard 火力发电厂基本
9、建设工程启动及竣工验收规程(2009版); Code for Fossil Power Construction Project from the Unit Startup to Complete Acceptance 火电机组启动调试工作规定(1996版); Thermal Power Plant Startup and Commissioning Work Rule除上述国家及电力工业部颁发的规范、规程以外,检查验收仍需遵照如下图纸、文件:Following documents and drawings are covered besides those abovementioned 经会
10、审签证的施工图纸和设计文件; Installation drawing and design document approved 批准签证的设计变更; Design modification approved 设备制造厂家提供的图纸和技术文件; Drawing and technical documents provide by equipment manufacturer PPA和EPC合同。 PPA and EPC contract3 受电设备调度命名与编号 Name & index of energized equipments.1 Tanjung Kasam开关站 Tanjung Ka
11、sam substation1) Muka Kuning开关站至Tanjung Kasam开关站的架空线路调度命名:Muka Kuning线路1;1)Dispatching name of overhead line from Muka kuning substation to Tanjung Kasam substation: Line 1 to Muka Kuning2) Batu Besar开关站至Tanjung Kasam开关站的架空线路调度命名:Batu Besar线路2;2)Dispatching name of overhead line from Batu Besar subs
12、tation to Tanjung Kasam substation: Line 2 to Batu Besar3)Tanjung Kasam开关站150kV 母线I调度命名:150kV Bus I;3)Dispatching name of 150kV busbar I at Tanjung Kasam substation: 150kV Bus I4)Tanjung Kasam开关站150kV 母线II调度命名:150kV BUS II;4)Dispatching name of 150kV busbar II at Tanjung Kasam substation: 150kV Bus
13、II5) Muka Kuning线路1上150kV断路器编号:CB 150 kV LINE 1 TG KASAM - MUKA KUNING;5)CB index of bay 7: CB 150 kV LINE 1 TG KASAM - MUKA KUNING;6) Muka Kuning线路1上线路侧隔离开关编号:DS 150 kV LINE 1 TG KASAM - MUKA KUNING;6)Index of Line DS on outlet side of CT at bay 7: DS 150 kV LINE 1 TG KASAM - MUKA KUNING;7)Muka Kun
14、ing线路1上线路侧接地开关编号:ES 2 150 kV LINE 1 TG KASAM - MUKA KUNING;7)Index of ES on outlet side of Line DS at bay 7: ES 2 150 kV LINE 1 TG KASAM - MUKA KUNING;8)Muka Kuning线路1上断路器侧接地开关编号:ES 1 150 kV LINE 1 TG KASAM - MUKA KUNING;8)Index of ES on inlet side of Line DS at bay 7: ES 1 150 kV LINE 1 TG KASAM -
15、MUKA KUNING;9)Muka Kuning线路1上母线I侧隔离开关编号:DS 150 kV BUS 1 - LINE 1 TG KASAM - MUKA KUNING9)Index of busbar I DS between line 1 with busbar I at bay 7: DS 150 kV BUS 1 - LINE 1 TG KASAM - MUKA KUNING10)Muka Kuning线路1上母线II侧隔离开关编号:DS 150 kV BUS 2 - LINE 1 TG KASAM - MUKA KUNING;10)Index of busbar II DS b
16、etween line 1 with busbar II at bay 7: DS 150 kV BUS 2 - LINE 1 TG KASAM - MUKA KUNING;11)Muka Kuning线路1上母线侧接地开关编号:ES 150 kV BUS 1 - LINE 1 TG KASAM - MUKA KUNING;11)Index of ES on busbar side at bay 7: ES 150 kV BUS 1 - LINE 1 TG KASAM - MUKA KUNING;12) Batu Besar线路2上150kV断路器编号:CB 150 kV LINE 2 TG
17、KASAM - BATU BESAR;12)CB index of bay 9: CB 150 kV LINE 2 TG KASAM - BATU BESAR;13)Batu Besar线路2上线路侧隔离开关编号:DS 150 kV LINE 2 TG KASAM - BATU BESAR;13)Index of Line DS on outlet side of CT at bay 9: DS 150 kV LINE 2 TG KASAM - BATU BESAR;14)Batu Besar线路2上线路侧接地开关编号:ES 2 150 kV LINE 2 TG KASAM - BATU BE
18、SAR;14)Index of ES on outlet side of line DS at bay 9: ES 2 150 kV LINE 2 TG KASAM - BATU BESAR;15)Batu Besar线路2上断路器侧接地开关编号ES 1 150 Kv LINE 2 TG KASAM - BATU BESAR;15)Index of ES on inlet side of line DS at bay 9: ES 1 150 Kv LINE 2 TG KASAM - BATU BESAR;16) Batu Besar线路2上母线I侧隔离开关编号:DS 150 kV BUS 1
19、- LINE 2 TG KASAM - BATU BESAR16) Index of busbar I DS between line 2 with busbar I at bay 9: DS 150 kV BUS 1 - LINE 2 TG KASAM - BATU BESAR17) Batu Besar线路2上母线II侧隔离开关编号:DS 150 kV BUS 2 - LINE 2 TG KASAM - BATU BESAR;17)Index of busbar I DS between line 2 with busbar II at bay 9: DS 150 kV BUS 2 - L
20、INE 2 TG KASAM - BATU BESAR18)Batu Besar线路2上母线侧接地开关编号:ES 150 kV BUS 1 - LINE 2 TG KASAM - BATU BESAR;18)ES on busbar side at bay 9: ES 150 kV BUS 1 - LINE 2 TG KASAM - BATU BESAR;19)母线I上接地开关编号:ES BUS 1;19)Index of ES on busbar I: ES BUS 1;20)母线I上电压互感器编号: CVT 150 kV BUS 1 COUPLER;20)Index of CVT on b
21、usbar I: CVT 150 kV BUS 1 COUPLER;21)母线II上接地开关编号:ES BUS 2;21)Index of ES on busbar II: ES BUS 2;22)母线II上电压互感器编号: CVT 150 kV BUS 2 COUPLER;22)Index of CVT on busbar II: CVT 150 kV BUS 2 COUPLER;23)Tanjung Kasam开关站母联断路器编号:CB 150 kV COUPLER GI TG KASAM;23) CB index of busbar coupler at bay 5: CB 150 kV
22、 COUPLER GI TG KASAM;24)Tanjung Kasam开关站母联上母线I侧隔离开关编号:DS 150 kV BUS 1 COUPLER;24) Index of DS between busbar coupler(bay 5) with busbar I: DS 150 kV BUS 1 COUPLER;25)Tanjung Kasam开关站母联上母线II侧隔离开关编号:DS 150 kV BUS 2 COUPLER;25)Index of DS between busbar coupler(bay 5) with busbar II: DS 150 kV BUS 2 CO
23、UPLER;26) Tanjung Kasam开关站母联上母线I侧接地开关编号:ES 150 kV BUS 1 COUPLER; 26)ES index on outlet side of DS between busbar coupler with busbar I: ES 150 kV BUS 1 COUPLER;27)Tanjung Kasam开关站母联上母线II侧接地开关编号: ES 150 kV BUS 2 COUPLER。27)ES index on outlet side of DS between busbar coupler with busbar II: ES 150 kV
24、 BUS 2 COUPLER;3.2 Tanjung KASAM电厂 Tanjung Kasam Powerhouse1)号主变命名:1# MT;1) Name of 1# main transformer: 1# MT;2)1#主变高压侧150kV 断路器编号:CB 150 kV HIGH VOLTAGE SIDE MAIN TRANSFORMER 1;2)CB index on outlet side of 1# MT at bay 2: CB 150 kV HIGH VOLTAGE SIDE MAIN TRANSFORMER 1;3)1#主变上母线I侧隔离开关编号:DS 150 kV B
25、US 1 HIGH VOLTAGE SIDE MAIN TRANSFORMER 1;3)Index of DS between 1# MT with busbar I: DS 150 kV BUS 1 HIGH VOLTAGE SIDE MAIN TRANSFORMER 1;4)1#主变上母线II侧隔离开关编号:DS 150 kV BUS 2 HIGH VOLTAGE SIDE MAIN TRANSFORMER 1; 4)Index of DS between 1# MT with busbar II: DS 150 kV BUS 2 HIGH VOLTAGE SIDE MAIN TRANSF
26、ORMER 1;5)1#主变上母线侧接地开关编号:ES 1 150kV HIGH VOLTAGE SIDE MAIN TRANSFORMER 1。 5)Index of ES on busbar side of 1# MT: ES 1 150kV HIGH VOLTAGE SIDE MAIN TRANSFORMER 1。3.3 Muka Kuning开关站 Muka Kuning Substation1)Muka Kuning线路1上150kV断路器编号:PMT L1;1)CB index of line 1 to Tanjung Kasam substation: PMT L1;2)Muka
27、 Kuning线路1上线路侧隔离开关编号:PMS L1;2)Index of line DS on outlet side of line 1 to Tanjung Kasam substation: PMS L1;3)Muka Kuning线路1上线路侧接地开关编号:ES1;3)Index of line ES on outlet side of line 1 to Tanjung Kasam substation: ES1;4)Muka Kuning线路1上母线I侧隔离开关编号:PMS B1.1;4)Index of DS between line 1 with busbar I: PMS B1.1;5)Muka Kuning线路1上母线II侧隔离开关编号:PMS B1.2;5)Index of DS between line 1 with busbar I: PMS B1.2;6)母线I上电压互感器编
copyright@ 2008-2022 冰豆网网站版权所有
经营许可证编号:鄂ICP备2022015515号-1