1、电气英文自我评价范文电气英文自我评价范文电气英文自我评价范文篇一My name is *, engaged in electrical equipment repair work has been 5 years. Since * * * years to * * company, has been working for more than two years. From entering the company has been engaged in substation operation and maintenance and management. Has participated
2、in and organized a high-pressure measurement and relay protection setting and calibration; reactive power compensation and voltage setting; DC screen inspection and maintenance; substation secondary circuit fault and processing; high-voltage cabinet failure and treatment; high-voltage cable head Pro
3、duction and processing; substation in the spring and autumn all overhaul and maintenance; outdoor high voltage overhead line fault handling and maintenance. I always assiduously with high-voltage technology to improve the operating rate of the combination, and actively study the principles of high-v
4、oltage equipment and maintenance experience, and insist on constantly improve their theoretical and practical skills to solve the substation running a lot Technical problems, in order to improve the power transmission and transmission equipment operating rate and laid a good foundation. Substation i
5、s the power system in the power of the voltage and current transformation, concentration and distribution of the place. In order to ensure the quality of electrical energy and the safety of the equipment, voltage regulation, power flow and voltage distribution, distribution of power, current and pow
6、er in each node and branch of the power system and control of transmission and distribution lines and Protection of major electrical equipment. Now substation over the past two years have experienced the work summarized as follows:1, vacuum circuit breakers in the daily operation of the fault types
7、and treatment.November 8, 2018 due to power company line fault on my company large power outage for 3 hours. After receiving the notice, we press the power substation regular power outage procedures for power outages. When the power company to deal with failure after transmission, according to power
8、 transmission step. Then found the 35KV main transformer vacuum circuit breaker refused to close, this is my company has just put into operation for two months the first time the substation problems, our company substation 35KV high voltage cabinet vacuum circuit breaker is applied Chint ZN85-40.5 c
9、ircuit breakers. In the experimental state found after closing the circuit breaker command, closing electromagnet action, the core plunger will close the pawl top open, closing the spring release energy, driving the circuit breaker closing, but the circuit breaker interrupter can not be together bra
10、ke. After analysis, indicating that mechanical failure has been excluded, indicating that the secondary line fault, found in the secondary auxiliary plug has a needle and control wire desoldering, vacuum breaker to deal with after closing, fault problem solving. Vacuum circuit breakers in the daily
11、work of the most prone to failure to be summed up: 1. Positive air circuit breaker refused to sub (gate)2. Vacuum circuit breaker body energy storage, energy storage motor stop 3. Vacuum interrupter interrupter can not be disconnected 2, the current transformer secondary open and deal with* * The en
12、d of the month, the power company came in February of the electricity details, with my company substation measured by the amount of difference 20182KW.h. I led the technical staff to conduct a comprehensive inspection of high-pressure measurement, due to limited conditions, failed to find fault prob
13、lems. The company invited the power company metering and testing center substation secondary circuit test. The current transformer, voltage transformer, secondary voltage drop and secondary load, electric energy meter of 35KV and 10KV each switch cabinet are tested. In the power company equipment te
14、sting found 35KV high back-up protection of the terminal has an indirect open phenomenon. After processing, in the specified time with the power company metering center, the problem has been resolved. Current transformer CT primary winding number of turns is small, the use of a winding in series in
15、the measured line, the secondary winding turns, and measuring instruments and relays and other current coil in series, measuring instruments and relays and other current coil impedance is very small , So the normal operation of CT is close to short-circuit state. CT secondary current size determined
16、 by the primary current, secondary current generated by the magnetic potential, is to balance the current magnetic potential. If the secondary open circuit, the impedance is infinite, the secondary current is equal to zero, the magnetic potential is equal to zero, can not balance the current generat
17、ed by a magnetic potential, then a current will act on the excitation, the core serious saturation. Magnetic saturation increases the iron loss, CT fever, CT coil insulation will be burned by overheating. But also in the core to produce remanence, increasing the transformer error. The most serious i
18、s due to the magnetic saturation, alternating sine wave into a trapezoidal wave, the rapid changes in flux moment, the secondary coil will induce a high voltage, the peak up to several thousand volts, so high Of the voltage on the secondary coil and the secondary circuit, the person and equipment ar
19、e a serious threat.3, to complete the good leadership of the other basic and temporary work assigned.Over the past year, I am learning and working in the gradual growth and maturity, but I know there are many deficiencies, such as lack of ability to work and innovation, lack of political theory to b
20、e improved and so on. In the future I will try to do the following, I hope the leadership and comrades of my supervision and guidance:1, consciously strengthen the study, to the theory of learning, to professional knowledge learning, learning to colleagues around, and gradually improve their theoret
21、ical level and operational capacity.2, to overcome the young gas impatient, so down to earth, improve work initiative, not afraid to do more things, not afraid to do small things, improve the practice in the bit to improve themselves.3, continue to improve their political accomplishment, strengthen
22、the sense of purpose of serving the people, and strive to become an outstanding national civil servants.电气英文自我评价范文篇二This year is coming to an end, in order to be able to work better in the next year, sum up experience, adhere to the advantages and correct deficiencies, according to company requireme
23、nts, summarized as follows: in a year's work, through the summary, although made some progress, A lot of shortcomings and deficiencies. As an electrical and mechanical workshop electrical technicians, in the production of work is only constantly sum up the lessons learned and found that in order
24、 to make their own faster progress.First, in-depth, solid workAs an electrical technician in the electromechanical workshop of the coal preparation plant, my main responsibility is to be responsible for the management of electrical technology in the electromechanical workshop, to work out the mainte
25、nance arrangement of the electrical equipment and the corresponding management rules and technical operation measures, organize the staff to do well in the business training; Often in-depth site, continue to promote new technology and new technologies.Over the past year, I have been working hard, fu
26、lfilling my duties seriously, constantly improving myself from the technical and management level, and have made great achievements in all aspects. I work in the workshop with the same below the master of the workers, equipment problems encountered actively to the scene to deal with failures, elimin
27、ate hidden dangers. Insist on the scene every day to check the operation of equipment, high and low voltage equipment for power supply and distribution; master production process of coal preparation to learn the principle of centralized control; understand the control signal routing layout, informat
28、ion transmission. Now many aspects have made great progress, for example: the communication 2 × × station system, the elevator running system, automatic control system concentrator, filter closed-loop control system, King configuration system, pressurized filter system, the main Plant an
29、d new plant coal washing system, from shallow to deep grasp the basic control structure and principle of the system. So I have a very thorough understanding of the production process of coal washing, and have learned the knowledge and the actual production of effective combination for the future to
30、better theory with practice, better promote the production, better reduce the workers The master of the labor intensity, more effective to improve labor productivity, for enterprises and the community to create more benefits laid a solid foundation. Other aspects of meticulous improvement and comple
31、tion of electrical safety regulations and measures to seriously monitor the implementation of the annual maintenance in the XX 11, through the replacement and overhaul of the transformer, but also learned a lot of things usually do not see, so I coal washing Plant electrical equipment with a deeper
32、understanding.Material plan to provide timely, comprehensive, accurate spare parts parameters is the guarantee of normal operation of the equipment, I am responsible for the electrical equipment materials plan to report work, at work, I ran the scene, check the problem, so that spare parts can be more comprehensive and reliable , To avoid the lack of spare parts and delay the status of production. And through the low-voltage power distribution room to find the problem, and other technical staff together proposed the transformation of low-voltage distribution room e
copyright@ 2008-2022 冰豆网网站版权所有
经营许可证编号:鄂ICP备2022015515号-1