1、成套设备出口合同范本附 Contract for Exporting Mining Equipment Contract No. _ This Contract is made and entered into on the 15th,Oct. in Sulaiminiyh by and between Mass Iraq Cement Co,Ltd ( as the Buyer) and China Jiangsu Grand Economic Devolpment Co.,Ltd. a company incorporated under the laws of China(hereina
2、fter referred to as the seller). Whereas, the Buyer desires to engage the Seller to provide the Mining Equipment, all related design, technical document, technical service and technical training and to obtain from the Seller a license of know-how and other technical information in relation with the
3、Equipments design, erection, commissioning, operation and maintenance. Now it is hereby mutually agreed as follows: Article 1 Definitions1.1 “Acceptance ”means the Buyer accepted the Equipment in accordance with Article xx. 1.2 “Commissioning” means the operation of the Equipment in accordance with
4、Article 9.4 for the purpose of carrying out Performance Test.1.3 “Contract” means this Contract signed by and between the Buyer and the Seller, including Appendices attached which shall form an integral part of this Contract.1.4 “Effective Date of the Contract” means the date when the Contract enter
5、s into force upon fulfillment of all the conditions stated in Article 16.1.1.5 “Equipment” means the equipment, machinery, instruments, spare parts and materials supplied by the Seller as listed in Appendix 3.1.6 “Erection” means the installation of the Equipment including placing and connecting par
6、ts to their positions according to the design drawing.1.7 “Job Site” means the site where the Equipment shall be located and/or erected, namely Mass Iraq Cement Plant. 1.8 “Last Shipment” means the shipment with which the accumulated invoice value of shipped goods has reached 100 percent of the tota
7、l the Equipment price.1.9 “Performance Test” means the tests for examining whether the Equipment is able to meet guarantee figures . 1.10 “Technical Document” means the technical indices, specifications, drawings, manual and instructions related to the design, erection, test-run, commissioning, acce
8、ptance, operation and maintenance of the Equipment to be provided by the Seller.1.11 “Technical Service” means the technical instruction, assistance and guidance rendered by the Seller. 1.12 “Technical Training ” means the training rendered by the Seller.1.13 “Test Run” means the initial run of a si
9、ngle machine or the whole system of the Equipment without materials.1.14 “Warranty Period” means the period of the warranty given by the Seller as specified in Article 10.2, during which the Seller is responsible for the defects of the Equipment as per Article 10. Article 2 Scope of the Contract2.1
10、The Sellers Obligation 2.1.1 The Seller shall supply the Equipment and spare parts, provide the design, Technical Document, and conduct the Technical Service and Technical Training, and grant a non-exclusive and non-transferable right to use the know-how and other technical information related to th
11、e Equipments design, Erection, Commission, operation and maintenance. 2.1.2 The Seller shall procure and supply the Equipment and spare parts which is listed in Appendix , the specification is detailed in Appendix . 2.1.3 The Seller shall provide design in respect to the Equipment and submit to the
12、Buyer the Technical Document .2.1.4 The Seller shall conduct the Technical Services at the Job Site.2.1.5 The Seller shall conduct the Technical Training of the Buyers trainees as per Appendix .2.1.6 The Seller agrees to grant non-exclusive and non-transferable right to use the know-how, other techn
13、ical information related to the Equipments design, Erection, Commission, operation and maintenance free of charge, which the Seller provides and discloses to the Buyer during the implementation of the Contract period.2.2 The Buyers Obligation2.2.1 The Buyer shall at his own costs and expenses, provi
14、de the Seller with all information and data concerning the design as per Appendix. The Buyer shall ensure the correctness and exactitude of all such information and data.2.2.2 The Buyer shall at his own costs and expenses, obtain all necessary import permits, undertake customs clearance, take delive
15、ry of the Equipment to be supplied by the Seller and transport them from port to the Job Site in time.2.2.3 The Buyer shall at his own costs and expenses, perform all the civil works, construction, Erection, Test Run and Commissioning in accordance with the Technical Document and under the Technical
16、 Services rendered by the Seller. 2.2.4 The Buyer shall at his own costs and expenses, perform necessary administration and security guard at the Job Site.Article 3 Price 3.1 The Buyer agrees to pay the total Contract price to the seller, Technical Training and Service fee is free .3.2 The total Con
17、tract price, including price of the Equipment, design and Technical Document, shall be _. The breakdown is as follows: The price for Equipment is _. Fee for design is _. Fee for Technical Document is _.3.2.1 The total Contract price for the Equipment is for delivery CIF Shanghai. CIF term is in acco
18、rdance with INTERNATIONAL RULES OF THE INTERPRETATION OF TRADE TERMS (INCOTERMS), 2000 edition, issued by the INTERNATIONAL CHAMBER OF COMMERCE (ICC).3.2.2 The total Contract price includes the price for spare parts listed in Appendix . However, the total Contract price also cover the supply of any
19、other spare parts used in the Mining construction . At the Buyers request, the Seller may provide with any other spare parts. A separate agreement will be signed between two parties. 3.2.3 The above price is fixed and firm.3.3 The total Contract price cover the Technical Service fee and Technical Tr
20、aining fee. Article 4 Payment 4.1 Down PaymentAfter signing the Contract, the Buyer shall pay 30% percent of the each equipment Contract price by T/T to the Seller when the seller is finished the indent with the factor and inform the Buyer.4.2 The balance of the total Contract price amounting _ ( sa
21、ys _ only ) shall paid by a confirmed irrevocable Letter of Credit at sight, issued within 20 days after signing the Contract by a reputable bank and acceptable to the Sellers Bank in favor of the Seller. The Letter of Credit shall be available upon the presentation of the following documents:4.2.1
22、For 70 percent of the total Contract price amounting _ (say _ only) at delivery: (a) Bill of Lading in one original. (b) Commercial Invoice in three originals (c) Packing list in one original(s) and two copies (d) Certificate of Origin in one original(s) and two copies (e) Insurance Policy in one or
23、iginal(s) and two copies 4.3 All the banking charges incurred in the Sellers bank shall be born by the Seller while those incurred outside the Sellers bank shall be born by the Buyer. Article 5 Delivery 5.1 The Delivery of the Equipment 5.1.1 The delivery of the Equipment listed in Appendix shall be
24、 completed within _ ( ) months from the Effective Date of Contract.5.1.2 With in _ ( ) months after the Effective Date of the Contract, the Seller shall send to the Buyer a preliminary delivery schedule by Email. Not later than _ ( ) days before the first shipment, the Seller shall submit to the Buy
25、er the final delivery schedule in three (3) copies indicating Contract number, dispatch number, name of the Equipment, quantity, approximate dimensions, volume of each package and time of each shipment.5.1.3 The loading port is Shanghai China, while the unloading port is _.5.1.4 Advance shipment, pa
26、rtial shipment and transshipment are allowed, however, the Seller shall inform the Buyer thirty (30) days before such shipment.5.1.5 The date of Bill of Lading for each shipment shall be considered as the actual delivery date. The date of the Last Shipment shall be considered as the actual whole del
27、ivery date of the Equipment to be supplied by the Seller.5.1.6 If the Equipment are shipped on deck, the Seller shall be responsible for their proper packing and take special protective measures.5.1.7 The Seller shall notify the Buyer by Emailbbb of the following within five (5) working days after e
28、ach shipment is effected: (a) Contract number (b) Name of the vessel and loading port (c) Name of the Equipment shipped (d) Number and date of Bill of Lading (e) Total volume (f) Total gross and net weight (g) Total number of packages/cases5.1.8 The Seller shall airmail the following documents in du
29、plicate to the Buyer: (a) Bill of Lading (b) Commercial Invoice (c) Packing List (d) Certificate of Origin (e) Insurance Policy.5.2 The Late Delivery of the Equipment5.2.1 If the Seller fails to deliver the Equipment in accordance with the final delivery schedule, the Seller shall pay to the Buyer l
30、iquidated damages for such delay at the following rates: (a) From the first week to the fourth week, the liquidated damages shall be _ ( ) percent of the value of the delayed portion of the Equipment per week(b) From the fifth week to the eighth week, the liquidated damages shall be _ ( ) percent of
31、 the value of the delayed portion of the Equipment per week (c) From the ninth week, the liquidated damages shall be _ ( ) percent of the value of the delayed portion of the Equipment per week5.2.2 The fractions of four days or more shall be counted as one week and fractions of less than four days shall be omitted. The total aggregate amount of the liquidated damages shall not exceed _ ( ) percent of the value of the delayed portion Equipment.5.2.3 The payment of liquidated damages under Article 5.2.1 above shall be in complete satisfaction of the Seller