1、Part Quality Assurance Planning零件质量保证策划Part Quality Assurance Planning Process(PQAP Process)/ 零件质量保证策划流程 PQAP - Part Quality Assurance Planning/零件质量保证策划Introduction & Communication Channels/介绍&沟通渠道Purpose/目的The purpose of part quality assurance planning is to ensure that suppliers can manufacture th
2、e parts in a capable way, with the correct quality, at the right price and the right time.零件质量保证策划的目的是确保供应商有能力在正确的时间以正确的价格制造正确的质量的零件。It also provides an opportunity for the suppliers to express their points of view about the design of the parts and the manufacturing requirements.它也给供应商提供了一个表达他们对于零件设
3、计和制造要求的观点的机会。Scope/范围Parts can be used on the mass production after have implemented PQAP process and get final approvalas below:/下列几种情况下,需通过零件质量保证策划流程并最终批准后,零件方可投入批量生产:1. New parts./新零件。2. New supplier./新供应商3. Engineering change./设计变更。4. Supplier key processes change./供应商关键流程变更。5. New manufacturing
4、 place./新的生产地点。Wirtgen(China) purchasing department in consultation with the design department, quality department and others, select the parts to be included in PQAP. The scope is defined in “Part Quality Assurance Planning”. The exempted requirements are marked in the column titled “Not Applicable
5、 (N/A)”.维特根(中国)采购部和设计部、质量部及其他部门协商后选择包括在PQAP中的零件。这个范围在PQAP中已经定义出。免除的要求标识在标题为“不适用”一列中。The supplier can use the forms mentioned in this PQAP, or if the supplier has its own systems / forms, for example a APQP/PPAP, its permitted to be used as a substitute process and documentation, provided prior agree
6、ment has been received from Wirtgen(China) purchasing department.供应商可以使用在这个PQAP中提到的表格,或者如果供应商有自己的系统/表格,比如先期产品质量策划/生产件批准程序,允许作为替代流程和文件,供应商提供从维特根(中国)采购部收到的事先协定。Communication channels/沟通渠道To simplify the communication between Wirtgen(China) and the supplier, both Wirtgen(China) as well as the supplier
7、must fill in their contact persons. The minimum for Wirtgen(China) is to fill in contact persons for Purchasing engineer, Design engineer and Quality engineer. When applicable the supplier is to fill in Project Manager, Quality, Logistics and Sales.为了简化维特根(中国)和供应商之间的沟通,维特根(中国)和供应商双方须填写他们的联系人。维特根(中国)
8、至少要填写采购工程师、设计工程师和质量工程师。如果合适,供应商需填写项目经理、质量经理、物流经理和销售经理。Part No/零件号码: Date/日期:Part Name/零件名称:Supplier/供应商:Supplier No/供应商代码:Inquiry No/调查号码:Contact person, Wirtgen China/维特根中国联系人Name/姓名E-mail/邮箱Mobile phone NO./手机号码Purchasing engineer/采购工程师Design engineer/ 设计工程师Quality engineer/ 质量工程师Contact person, S
9、upplier/供应商联系人NameE-mailTel. NumberProject Manager/项目经理Qualit Manager/ 质量经理Logistics Manager/物流经理Sales Manager/ 销售经理PQAP - Part Quality Assurance Planning/零件质量保证策划1. Planning Phase/策划阶段1.1 Review of Technical Specification RTS/技术规格回顾The supplier must review the technical specification in a critical
10、way and advise Wirtgen(China) of his findings and viewpoints. The review is implemented partly to ensure that the requirements are understood and partly so that the supplier can give advice to Wirtgen(China), based on their experience about the production process.供应商必须以挑剔的方法回顾技术规格并且给维特根(中国)建议他的发现和观点
11、。技术规格的回顾在一定程度上保证了要求是理解了还是部分的理解,因此供应商可以基于他们对于生产流程的经验给维特根(中国)以建议。Notes can be recorded on additional documents or in the suppliers standard documentation. Even if a joint design review is not required the supplier must verify their review of the technical specification.说明可以记录在另外的文件上或在供应商标准的文件里。即使是一个联合
12、的设计回顾,也不要求供应商必须验证他们的技术规格回顾。Any additional and clarifying comments related to the questions 1.1.1 1.1.22 to be filled-inthe attached table 5.1 below.任何关于1.1.1到1.1.22的问题的另外的和澄清的解释,需填写在附件的5.1的表格中。 Yes No N/A1.1.1 Drawings/图纸 Are all drawings that are needed to produce the product to the latest revision
13、 level available at the supplier for review?/在供应商处回顾的所有图纸是最新版本的吗?1.1.2 Technical Norm /技术规范 Has the supplier reviewed the Wirtgen(China) “Technical Regulations” affecting the part and can confirm that they can be achieved through the process planned?供应商已经回顾了影响零件的维特根(中国)的技术规范并且能确认可以通过有计划的流程达到要求。1.1.3
14、 Wirtgen(China) Standards/维特根(中国)标准 Has the supplier reviewed the Wirtgen(China) Standards affecting the part and can confirm that they can be achieved through the process planned? 供应商已经回顾了影响零件的维特根(中国)的标准并且能确认可以通过有计划的流程达到要求。1.1.4 PDF file/PDF文件 Is the PDF file available and be read by the supplier?供
15、应商是否能阅读PDF文件?1.1.5 Legislative requirements/法律要求 Must the part/system fulfil any government requirements? If so, can these requirements be fulfilled?零件/系统必须满足政府法律要求?如果是,这些要求能满足吗?1.1.6 Black & Grey list/黑名单&灰色名单 Can the supplier demonstrate and guarantee that there are no components on the Black and
16、Grey list used in the product?/供应商能证明并且保证在黑名单和灰色名单中的部件没有使用在零件上吗?1.1.7 Dimensions/尺寸 The supplier has reviewed that the drawings contain all necessary dimensions required to produce the product and that all the dimensions stated on the drawing can be fulfilled by the supplier to the quality and volum
17、e requirements stated by Wirtgen(China), in line with the bid price submitted by the supplier?/供应商已经回顾了图纸,包括所有制造零件必要的尺寸,供应商可以满足所有在图纸中规定的尺寸,并且以供应商提交的报价达到维特根(中国)规定的质量和产量要求?1.1.8 Tolerances/公差 The supplier has reviewed that the tolerances on the drawing can be fulfilled by the planned process?/供应商已经回顾了
18、图纸上的公差并且通过策划的流程来满足要求?1.1.9 Critical characteristics/关键特性 If there are Significant or Critical Characteristics stated on the drawings the supplier should have evaluated these characteristics for manufacturing feasibility to a capability of Cpk 1.33 or with Poka-Yoke?在图纸上是否规定了重大的或关键的特性,供应商应该评估这些特性的生产可
19、行性以保证达到过程能力指数Cpk 1.33或采取防错。1.1.10 Datum system and reference points/数据系统和参照点 Are all datum system and measurement reference points clear and understandable and has the supplier confirmed that they have the measurement capability to ensure the dimensions and tolerances?所有的数据系统和测量参照点是否清晰并理解?供应商是否已经确认他
20、们有测量能力来保证尺寸和公差。1.1.11 Material specification/材料规格 Have materials been evaluated for manufacturing feasibility including confirmation that the materials fulfill the prescribed requirements set forth by Wirtgen(China) drawings?材料是否已经评估了生产的可行性?包括确认材料是否满足维特根(中国)在图纸上规定的要求?1.1.12 Strength of joining/连接强度
21、Have all joining points been evaluated for manufacturing feasibility including Confirmation that they will fulfill the prescribed requirements set forth by Wirtgen(China) drawings?/所有连接点是否已经评估其生产可行性?包括确认他们是否能满足维特根(中国)在图纸上规定的要求? Yes No N/A1.1.13 Cleanliness/清洁度 Can the supplier achieve the Wirtgen(Ch
22、ina) cleanliness specifications?/供应商是否能满足维特根(中国)清洁度规格?1.1.14 Surface treatment/表面处理 Have any (and all) “Surface/Heat Treatment” requirements stated on the drawing been reviewed and evaluated for feasibility of production and the supplier confirms that these requirements can be fulfilled?是否所有在图纸上规定的“
23、表面/热处理”要求已经回顾并评估了生产可行性?供应商是否已确认他们能满足这些要求。1.1.15 Marking/标记 Have any requirements for special markings on parts (components and assemblies) that are indicated on the drawings and specifications of Wirtgen (China) been applied to the parts?/是否维特根(中国)在图纸和规范上标示出的零件(部件和总成)上所有特殊的标记适用于零件?1.1.16 Identificat
24、ion/识别 Have any requirements for identification on parts (components and assemblies) been evaluated for feasibility of production and the supplier confirms that these requirements can be fulfilled?是否所有在零件(部件和总成)上识别的要求已经评估了其生产可行性并且供应商已经确认可以满足这些要求?1.1.17 Traceability/可追溯性 Do all parts/assemblies have
25、traceability to the raw material deliveries?所有零件/总成的原材料有可追溯性?1.1.18 Packaging in Wirtgen standard packaging material/用维特根标准包装材料包装 Are the parts that the supplier is to produce suitable for packaging in Wirtgen standard pallets and frames? (For transport from the supplier to Wirtgen(China)供应商生产的零件是否能
26、用维特根标准的包装材料进行包装?(从供应商转运到维特根(中国)。If the answer is No please enclose a proposed detailed specification regarding packaging and calculated cost.如果答案是不,请附上推荐的详细的关于包装的规格和计算出的成本。1.1.19 Product Application Agreement/产品应用协议 If the supplier is design responsible, has necessary information concerning interfac
27、e/parameters of installation for their product been provided and can the full function of the product be guaranteed to the requested specifications?如果供应商负责设计,关于装配他们的零件的接口/参数的必要的信息已经提供给我们并且零件的功能能保证满足要求的规格?1.1.20 Installation approval/装配批准 Has the supplier advice to give relating to any proposed handl
28、ing guidelines? If the answer is Yes then an installation approval activity may need to be planned./供应商是否给我们提出一些关于操作指导方面的建议?如果答案是“是”,那么应该计划开展装配批准的活动。1.1.21 Supplier advice and recommendations/供应商建议和推荐 Has the supplier reviewed all requirements stated by Wirtgen(China) and submitted any issue points
29、(commercial or manufacturing) and/or any recommendations to simplify or guaranty the production of a quality product?供应商是否已经回顾了维特根(中国)规定的所有要求并且提交了一些问题点(商务或制造)和/或一些建议来简化或保证高质量零件的生产?1.1.22 Manufacturability & Specification Review Meeting/可制造性和规格回顾会议 Does the supplier request a face to face meeting wit
30、h Purchase, quality and Engineering, either to gain more clarity of the specification and design requirements or want to propose a Value Analysis / Value Engineering activity on the current part design to improve the ease of manufacture or reduce costs?供应商是否要求一个和采购部、质量部、设计部 面对面的会议?或者获得更加清晰的规格和设计要求或者
31、想要对目前的零件设计提出价值分析/价值过程活动的建议来改进易制造型或降低成本?1.1.23 Local parts installation application /国产样件试装 Do we need local parts installation application before Initial Sample Approval? /在样件批准前国产零件是否需要进行试装?Any additional and clarifying comments related to the questions above to be filled in enclosed RTS form(See a
32、ppendix 5.1)/任何关于以上问题的额外的和澄清的解释需填写在附件的RTS表里(见附件5.1)1.2 Process Flow Chart/流程图A process flow chart must be drawn up including all the production steps. The flow chart must refer to the inspection instructions, audit program, and work instructions./必须编制包括所有生产步骤的流程图。流程图必须参考检验指导书、审核程序和作业指导书。The process flow chart must include all activities, starting
copyright@ 2008-2022 冰豆网网站版权所有