1、Copyright 2015,2018,Hitachi,Ltd.DW800Hitachi ProprietaryREP00-00Rev.0REP00-00REPLACEMENT SECTIONCopyright 2015,2018,Hitachi,Ltd.DW800Hitachi ProprietaryREP00-10Rev.9REP00-10Contents1.Before Starting Replacement Work.REP01-01-101.1 Before Starting Replacement Work.REP01-01-101.1.1 Note at the Time of
2、 the Unpacking.REP01-01-101.1.2 Note on Turning Off the Power.REP01-01-101.1.3 Note on Installing and Removing Parts.REP01-01-201.1.4 Notes at the Time of the Replacement.REP01-01-301.1.5 Note on Cable Routing.REP01-01-401.1.6 Note on Restarting.REP01-01-401.1.7 Note on Completing the Work.REP01-01-
3、401.1.8 Notes while the Storage System Is Being Started.REP01-01-401.1.9 Note at the Time of Replacement Work.REP01-01-401.1.10 Notes when Handling the Flash Module Drive(FMD).REP01-01-501.1.11 Note on Deleting Remote Paths.REP01-01-801.2 Hot Replacement Flowchart.REP01-02-101.3 Concept of Drive Mai
4、ntenance.REP01-03-101.3.1 Copy Back Mode.REP01-03-101.3.2 Drive Maintenance.REP01-03-201.4 Concept of Cache Memory Maintenance.REP01-04-101.5 How to Interpret the Replace Procedure.REP01-05-101.5.1 In Case of Replacement when SIM Has Occurred.REP01-05-101.5.2 In Case of Replacement when SIM Has Not
5、Occurred.REP01-05-101.5.3 Procedure before PDEV Replacement and Correction Copy.REP01-05-201.5.4 Confirmation Procedure.REP01-05-301.5.5 How to Search a Work ID to Replace a Drive.REP01-05-401.6 Parts Replacement Processing List.REP01-06-101.7 Availability of the Online Maintenance When TrueCopy Is
6、Used.REP01-07-101.8 Availability of the Online Maintenance When ShadowImage Is Used.REP01-08-101.9 Availability of the Online Maintenance When UR Is Used.REP01-09-101.10 Availability of the Online Maintenance When GAD Is Used.REP01-10-101.11 About the Storage Media Used for Installation/Maintenance
7、Process.REP01-11-101.12 Specifying the Installation Location by Using the Locate LED.REP01-12-101.12.1 Turn on Locate LED.REP01-12-101.12.2 Turn off Locate LED.REP01-12-102.Replacement Processing.REP02-01-102.1 Connecting the Maintenance PC.REP02-01-102.1.1 Attachment/Removal Procedure of Maintenanc
8、e PC.REP02-01-102.1.1.1 Attachment Procedure of Maintenance PC.REP02-01-102.1.1.2 Removal Procedure of Maintenance PC.REP02-01-302.1.2 Connecting to the Storage System.REP02-01-402.1.3 Starting Web Console.REP02-01-802.1.4 Stopping Web Console.REP02-01-91Copyright 2015,2018,Hitachi,Ltd.DW800Hitachi
9、ProprietaryREP00-20Rev.9REP00-202.2 How to Open/Close Door or Attach/Remove Front Bezel/Rear Door.REP02-02-102.2.1 How to Attach/Remove Front Bezel.REP02-02-102.2.1.1 CBSS/CBSL/DBL/DBS/DBF/CHBB.REP02-02-202.2.1.2 CBLM/CBLH.REP02-02-402.2.1.3 DB60.REP02-02-602.2.2 How to Open/Close the Rear Door of R
10、KU Rack Frame.REP02-02-1002.2.3 Mounting Lifter on Rack Frame.REP02-02-1102.3 Replacing a Drive.REP02-03-102.3.1 Before Replacing Drive.REP02-03-102.3.2 Replacing a Drive.REP02-03-802.4 Replacing a Controller Board.REP02-04-102.4.1 Replacing a Controller Board for CBSS/CBSL.REP02-04-102.4.2 Replacin
11、g a Controller Board for CBLM/CBLH.REP02-04-1802.5 Replacing a Cache Memory.REP02-05-102.5.1 Replacing a Cache Memory for CBSS/CBSL.REP02-05-102.5.2 Replacing a Cache Memory for CBLM/CBLH.REP02-05-1302.6 Replacing a FAN.REP02-06-102.7 Replacing a BKMF.REP02-07-102.8 Replacing a Battery.REP02-08-102.
12、8.1 Failure Replacement of a Battery(CBLM/CBLH).REP02-08-102.8.1.1 Failure Replacement of a Battery for BKMF.REP02-08-802.8.2 Preventive Replacement of a Battery(CBLM/CBLH).REP02-08-1602.8.2.1 Preventive Replacement of a Battery for BKMF.REP02-08-2402.8.3 Replacement of a Battery for BKM(Factory and
13、 distribution center only).REP02-08-3302.9 Replacing/Preventive Replacement of a BKM.REP02-09-102.9.1 Replacing a BKM.REP02-09-102.9.2 Preventive Replacement of a BKM.REP02-09-602.10 Replacing a Cache Flash Memory(CFM).REP02-10-102.10.1 Replacing a Cache Flash Memory for CBSS/CBSL.REP02-10-102.10.2
14、Replacing a Cache Flash Memory for CBLM/CBLH.REP02-10-802.11 Replacing a LAN Board.REP02-11-102.11.1 Replacing a LAN Board for CBLM/CBLH.REP02-11-102.12 Replacing a Channel Board(CHB).REP02-12-102.12.1 Replacing a Channel Board for CBSS/CBSL.REP02-12-102.12.2 Replacing a Channel Board for CBLM/CBLH.
15、REP02-12-902.12.3 Replacing a Channel Board for Channel Board Box.REP02-12-1802.13 Replacing a Small Form-Factor Pluggable(SFP).REP02-13-102.13.1 Replacing a Small Form-Factor Pluggable(SFP)for CBSS/CBSL.REP02-13-112.13.2 Replacing a Small Form-Factor Pluggable(SFP)for CBLM/CBLH.REP02-13-702.13.3 Re
16、placing a Small Form-Factor Pluggable(SFP)for Channel Board Box.REP02-13-1302.14 Replacing a Disk Board(DKB).REP02-14-102.14.1 Replacing a Disk Board for CBLM/CBLH.REP02-14-102.15 Replacing a Power Supply.REP02-15-102.15.1 Replacing a Power Supply(DKCPS)for CBSS/CBSL .REP02-15-102.15.2 Replacing a P
17、ower Supply(DKCPS)for CBLM/CBLH.REP02-15-70Copyright 2015,2018,Hitachi,Ltd.DW800Hitachi ProprietaryREP00-30Rev.9REP00-302.15.3 Replacing a Power Supply(DBPS)for DBS/DBL.REP02-15-1302.15.4 Replacing a Power Supply(DBPS)for DB60.REP02-15-1902.15.5 Replacing a Power Supply(DBPS)for DBF.REP02-15-2502.15
18、.6 Replacing a Power Supply(CHBBPS)for CHBB.REP02-15-3102.16 Replacing an ENC.REP02-16-102.16.1 Replacing an ENC for DBS/DBL.REP02-16-102.16.2 Replacing an ENC for DB60.REP02-16-902.16.3 Replacing an ENC for DBF.REP02-16-1702.17 Replacing a Controller Chassis/Drive Box.REP02-17-102.17.1 Replacing a
19、CBSS/CBSL.REP02-17-102.17.1.1 Replacement of Controller Chassis.REP02-17-202.17.2 Replacing a CBLM/CBLH.REP02-17-1402.17.2.1 Replacement of Controller Chassis.REP02-17-1502.17.3 Replacing a DBS/DBL Drive Box.REP02-17-2602.17.3.1 Replacement of Drive Box.REP02-17-2702.17.4 Replacing a DB60 Drive Box.
20、REP02-17-4302.17.4.1 Replacement of Drive Box.REP02-17-4402.17.5 Replacing a DBF Drive Box.REP02-17-7102.17.5.1 Replacement of Drive Box(DBF).REP02-17-7202.18 Replacing the Front Bezel.REP02-18-102.18.1 Replacing the Front Bezel of CBSS/CBSL.REP02-18-202.18.2 Replacing the Front Bezel of CBLM/CBLH.R
21、EP02-18-402.18.3 Replacing the Front Bezel of DBS/DBL.REP02-18-502.18.4 Replacing the Front Bezel of DB60.REP02-18-602.18.5 Replacing the Front Bezel of DBF.REP02-18-702.18.6 Replacing the Front Bezel of CHBB.REP02-18-802.19 Replacing PDUs.REP02-19-102.20 Replacing a SAS Cable.REP02-20-102.20.1 Repl
22、acing a SAS Cable of DBS/DBL.REP02-20-1702.20.2 Replacing a SAS Cable of DB60.REP02-20-2502.20.3 Replacing a SAS Cable of DBF.REP02-20-3302.21 Replacing a SVP.REP02-21-102.22 Replacing Air Filters.REP02-22-102.23 Replacing a Channel Board Box.REP02-23-102.24 Replacing a PCIe Channel Board.REP02-24-1
23、02.25 Replacing a PCIe-cable Connecting Package.REP02-25-102.26 Replacing a Switch Package.REP02-26-102.27 Replacing a FAN(CHBBFAN).REP02-27-102.28 Replacing a PCIe Cable.REP02-28-102.29 Replacing a NAS Module.REP02-29-102.29.1 Replacing a NAS Module.REP02-29-102.29.2 Replacing a Cache Memory for NA
24、S Module.REP02-29-1102.29.3 Replacing a Small Form-Factor Pluggable(SFP+)for NAS Module.REP02-29-230Copyright 2015,2018,Hitachi,Ltd.DW800Hitachi ProprietaryREP00-40Rev.5REP00-403.Processing Method of Batteries.REP03-01-103.1 Processing Method of Batteries and Flash Module Drive(FMD).REP03-01-103.2 R
25、ecycling.REP03-02-10Copyright 2015,2018,Hitachi,Ltd.DW800Hitachi ProprietaryREP01-01-10Rev.4REP01-01-10NOTICE:Unless otherwise stated,“firmware version”in this section indicates DKCMAIN firmware.1.Before Starting Replacement WorkThis section explains procedures for replacing parts which are specifie
26、d as maintenance parts and identified as failed parts through troubleshooting,etc.The DW800 is used in a form of rackmount model.NOTICE:During the replacement,the part statuses in the“Web Console”,“Maintenance Utility”,and“Maintenance”windows might be displayed differently from the actual statuses.(
27、Example:The CHBs during the replacement processing are displayed as the Normal status.)In that case,complete the running maintenance operation,and then refresh the display information in each window.1.1 Before Starting Replacement WorkTake notice of the following when performing a maintenance work f
28、or the Storage System.Notes for work are described with“NOTE”.Read and understand them well before performing the maintenance.1.1.1 Note at the Time of the Unpacking Unpack it indoor.Especially,do not unpack it in such places with the outdoor dust,the direct sunlight,and the infiltration of rainwate
29、r.Work on the unpacking in the place where a rapid difference of temperature does not occur.It may have dew condensation when it is unpacked in the place where a difference of temperature is extreme.Further,if the part that remains at high or low temperature in transport is installed in the Storage
30、System,it may not operate normally.1.1.2 Note on Turning Off the Power The user data may be lost unless the power is turned off in the correct procedure.Since the power feeding to the Storage System is duplicated,when turning off the power,remove the power cables from two Power Supply per Storage Sy
31、stem.When doing a hot replacement of a part,do not wear metallic accessories or a watch so as to avoid an electric shock.Be careful not to touch any of live parts with a screwdriver,etc.NOTICE:Do not disassemble or remodel parts for maintenance.Otherwise,a failure or a serious accident may be caused
32、.Be sure to replace parts in units of formally defined maintenance part.When replacing the Power Supply,do it in haste after preparing a replacement Power Supply and arranging cables,etc.so that they do not disturb the replacement.Copyright 2015,2018,Hitachi,Ltd.DW800Hitachi ProprietaryREP01-01-201.
33、1.3 Note on Installing and Removing Parts Generally,each part is installed with high-precision components.Remove and install the part gently so as not to give it any shock.Be sure to wear a wrist strap connected to the Storage System before starting and do not take it off until you finish.When you install a Drive,Controller Board,Channel Board,Disk Board and ENC support its metal part with your ha
copyright@ 2008-2022 冰豆网网站版权所有
经营许可证编号:鄂ICP备2022015515号-1