ImageVerifierCode 换一换
格式:DOCX , 页数:9 ,大小:94.50KB ,
资源ID:19808240      下载积分:3 金币
快捷下载
登录下载
邮箱/手机:
温馨提示:
快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。 如填写123,账号就是123,密码也是123。
特别说明:
请自助下载,系统不会自动发送文件的哦; 如果您已付费,想二次下载,请登录后访问:我的下载记录
支付方式: 支付宝    微信支付   
验证码:   换一换

加入VIP,免费下载
 

温馨提示:由于个人手机设置不同,如果发现不能下载,请复制以下地址【https://www.bdocx.com/down/19808240.html】到电脑端继续下载(重复下载不扣费)。

已注册用户请登录:
账号:
密码:
验证码:   换一换
  忘记密码?
三方登录: 微信登录   QQ登录  

下载须知

1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。
2: 试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。
3: 文件的所有权益归上传用户所有。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 本站仅提供交流平台,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

版权提示 | 免责声明

本文(T0 Monthly ReportSample月报样本Word文档格式.docx)为本站会员(b****5)主动上传,冰豆网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知冰豆网(发送邮件至service@bdocx.com或直接QQ联系客服),我们立即给予删除!

T0 Monthly ReportSample月报样本Word文档格式.docx

1、2.1.3 Design 42.1.4 Construction 52.2 Cost 52.3 Quality 62.4 Environmental Health & Safety 63 Forward View: Management of Key Risks & Opportunities 73.1 Schedule 73.1.1 Authority 73.1.2 Procurement 73.1.3 Design 83.1.4 Construction 83.2 Cost 83.3 Quality 93.4 Environmental Health & Safety 94 Client

2、Actions Required in Next Period 10Appendix 1. Master Schedule 11Appendix 2. Cost Management, Budget Estimation 12Appendix 3. Risk Register 13Appendix 4. Progress Photographs 14Appendix 5. Governmental Approval flowchart and list of necessary documents with status 15Appendix 6. List of Non-conformiti

3、es 16Appendix 7. Safety Rounds 171 Executive SummaryThis report provides a record of the current progress on the project, as documented in the Appendices. The main body of the report highlights: The key concerns arising from the progress to date and the remedial actions they require; The key risks a

4、nd opportunities that will need to be managed in moving forward; and The actions that Sandvik needs to take within the next reporting period, and when they will be required, to maintain progress. A design Meeting was held on October 21st to clarify outstanding issues. Comments on the Transformer roo

5、m have been given for BADI to revise.The Master schedule has been updated with the latest progress of the works; Works on site go smoothly. Main Contractor is facing some delays which are not too critical for the overall progress.MEP contractor has submitted a revised schedule, his overall schedule

6、is exceeding contract schedule for more than one month. Jirong plans to finish their installation works before the Chinese New Year at the end of January. Testing and commissioning will be done after that.Total Delay of the project is around 7 months from the original schedule at the beginning of th

7、e project. Further delay of one month according to Jirongs submitted schedule. Finish of installation works shall be before Spring Festival at the end of January 2009.The Main Structure including Steel structure has been finished during October. Roof waterproofing, Faade and Internal Fit out are del

8、ayed. Main Contractor wants to catch up with the delay and finish their works by end of December.Jirong has started works on site with the renovation of LF1. They have a slow start into the construction and SSBA is monitoring them closely and pushing them in order to be able to deliver on time. Risk

9、 for delay of Jirongs finish of the works is still high.There have been no Quality issues so far. Non conformities were rectified by Main contractor.The forecast for the Project cost is now about 29.4 Million Rmb. 1 Million to be committed has been added for Claims from the Main contractor for Varia

10、tion and Material price increase. SSBA Fee cost has been adjusted to match the additional time for the project.Beijing October 7th, 2008Stephan Hernandez Key Concerns / Remedial Actions Required2.1 ScheduleThe Master Schedule can be found in Appendix 1. The Master schedule has been updated according

11、 to the latest Schedule of the General Contractor and the revised schedule of M&E contractor. Schedule of Fire Fighting contractor was added to the Schedule as well.2.1.1 AuthoritySD approval has been acquired.PD was approved on 28th March.Fire fighting approval has been obtained on May 27th.3rd Par

12、ty Review Report was issued out at the end of MayConstruction planning permit was acquired on June 6th.Construction permit was issued out on July 3rd.Environmental-impact assessment report can be done at the same time with LF3, and the staff from environment protection bureau said this report will n

13、ot influence the construction permit, so the time schedule doesnt need to consider revising.Project ApprovalSolvedSchematic Design ApprovalApproved!Approval of Preliminary Design of Individual BuildingPlanning Certificate for Land Use and Project Location SuggestionNot neededPlanning Certificate for

14、 EngineeringFire Fighting System Detail Design ApprovalAudit of shop drawingConstruction Permit2.1.2 ProcurementPower supply contractor Layout for the Transformer room has been agreed by Leon. BADI has prepared the drawings and uploaded them to Aconex for approval. Approval process was ongoing durin

15、g October as there were further Requirements and comments on design or the Transformer room. Power supply contractor did not have any comments on the Layout. They will finish their final design accordingly.2.1.3 DesignDrawing revisions will undergo the workflow process through Aconex. The Quality of

16、 the drawings is not satisfying. With M&E contractor it was agreed that they will follow the standard of Sandviks installation even some drawings might not be clear about it.Drawings for PVD room change and cancellation of water boiler on the roof have been done by BADI and uploaded to Aconex. Comme

17、nts were given by Rolf and Kent for revision. Water boiler shall be kept as originally designed. Drawings for the Transformer were discussed in the design meeting on Oct.21 and BADI has revised the drawings accordingly.2.1.4 ConstructionConstruction progress was normal during October. We had Main Co

18、ntractor, M&E Contractor and Fire Fighting Contractor working on site.Main Structure has been finished and inspected by the authorities.2.1.4.1 Civil WorkFollowing civil works have been finished during last period: Concrete Structure Steel Structure Steel structure installation has been delayed for

19、about one week. Roof decking (without waterproofing)Other works that have started and are still ongoing Brick works and partitions External wall plastering and painting2.1.4.2 M&E InstallationFollowing works have been finished during the last period LF1 Level 2: Air duct installation, power cable tr

20、ay installation, power conduit installation, hot water pipe installation. LF1-E Level 1: Water pipe installation. LF1-E Level 2: LF1-E Level 3: Air duct installation.2.1.4.3 Fire fighting worksFire fighting contractor started works during October.LF1 Level 2 sprinkler pipe and fire fighting alarm co

21、nduit installation have been finished during the last period.2.2 CostBudget for the project was estimated by SSBA to be 19,091,150.73 Rmb.1. Around RMB4,200,000 was be added into HVAC part, because a. HVAC of Lang Fang 1 part are not included in the preliminary budget, and b. According to the new de

22、sign, both new and old part of the factory HVAC pipes are stainless steel, but old design is seamless pipe.c. High price of Equipment (e.g. Air-condition units by ALKO)2. Around RMB70, 000 was be added into Plumbing part; cost of plumbing rebuild old factory is not included in preliminary budget.3.

23、Around RMB2, 800,000 was be added into Electric work, according to old design, automatic control system is not included, but it is in the new design.4. Around RMB498,498 was be added into SSBA PM Fee, according to extended period of the project.Layout of the transformer room has been confirmed. Desi

24、gn change was given to BADI after the design fee had been agreed with BADI. Extra design will cost 25.000 Rmb. Main contractor will be asked for Quotation of the structure as soon as they design drawings are finalized. The extra cost shall not be included into the project cost.Claims from BADI for e

25、xtra design works need further discussion together with BADI and Sandvik in order to get an agreement how to handle.2.3 QualityTwo Non-conformities were issued out to the Main contractor. Both have been rectified and closed. Another Non-conformity belongs to the M&E contractor, it has been solved as

26、 well.Please see Attachment 6. Safety Health and safety rounds are being held every Friday. Last Safety round can be seen in Attachment 7 Opportunities3.1 ScheduleInitial delays of the schedule (2 months) were caused by the slow design process due to coordination with planning bureaus requirements a

27、nd the right implementation of Clients requirements. These have been implemented in the previous version.Further delays were caused by the procedures for approvals from the authorities. After submittal of SD application it was stated by the planning bureau that they need 1 month for their internal p

28、rocedure and this does influence the schedule.The Business planning Bureau was considering taking away part of the land for other development as Sandvik had not developed the land for a long time. This process made the whole approval progress stopped in the beginning on 2008. Only at the end of Febr

29、uary the Development bureau agreed to Sandviks extension plans so the authorities start to process Sandviks submissions.The lengthy authorities approval processes are causing a lot of delay which is also affecting the design. Construction permit has not been obtained on July 3rd which caused one mon

30、th delay.Construction was supposed not to be permitted for 2 months from July 25th to September 20th during the Olympics in Beijing. Construction was permitted again at the beginning of August; Main contractor revised their schedule accordingly. Finish 1 month earlier compared to prior schedule.M&E Contractor is revising their schedule accordingly as well. Jirong was granted a total construction time of 95 days which is one month longer than originally planned.Preconstruct

copyright@ 2008-2022 冰豆网网站版权所有

经营许可证编号:鄂ICP备2022015515号-1