1、Supervision PlanSupervision PlanFrom October 20, 2004 to September 10, 2005ContentsGeneral description of the projectThe scope of supervision work- goal and basis The organization chart- personnel and responsibilities The details of supervision work- methods and actions The supervisions working regu
2、lations and procedures Supervision facilitiesSupervision Company(Signature): Chief supervisor: Chief engineer: Date: ContentsChapter 1 General description of the project 31. General description of the project 32. The project goal 3Chapter 2 Supervision work 41. The scope of supervision work and perf
3、ormance goal 42. The supervision basis 43. Supervision work and the working procedures 64. Supervision on the critical parts of the project 14Chapter 3 The site supervision organization 151. The figure of organization structure of the site supervision department 152. Supervision personnel responsibi
4、lity 15Chapter 4 Control measures of the supervision goal 171. Construction quality control measure and document information management 171.1 Quality control before execution 171.2 Quality control during the execution .181.3 Quality control after the execution1.4 Quality control of the necessary raw
5、 materials, semi-finished goods and plant and equipment of the project.222. Progress control measures and organization coordination. 232.1 Advance control of the progress.242.2 Course control of the progress.242.3 Following control of the progress.253. Investment control measures and contract manage
6、ment263.1 Advance control of the investment.263.2 Course control of the investment264. Management measures for safety construction295.Management measures for civilization construction.30Chapter 5 Site supervision working regulations.321. Regulations for the two-level examination of the design docume
7、nts and drawings.322. Regulations for the technology communication333. Regulations for the approval of the commencement report 334. Regulations for the examination and re examination of the materials and components.335. Regulations for the design variations.336. Regulations for the examinations of t
8、he concealed work.337. Regulations for the construction quality supervision.348. Regulations for the construction quality test.349. Regulations for the handling of the construction quality accidents.3410 Regulations for the supervision and report of the progress.3511. Regulations for the supervision
9、 of the investment.3512. Regulations for the supervision regular meeting and report.3513. Regulations for the completion acceptance3614. Regulations for the supervision document management3615. Regulations for the supervisory personnel self-discipline.3716. Regulations for the supervision stand-by37
10、17.Regulations for the supervision sample performance and testing.38Chapter 1 The general description of the project1. The General description of the Project1.1 Client: BLP Construction Material (SuZhou) LTD.1.2 Name of the Project: BLP Construction Material (SuZhou) LTD. Factory and Office Building
11、 Project1.3 Site Location: SuZhou SND1.4 Project Scale: About 580001.5 Project Investment: About 70,000,000 RMB1.6 Contractor: China JinYe Construction Engineering Company2. Project Goal2.1 Time schedule: 280 Days2.2 Quality: Construction Quality is satisfactory. Chapter 2 Supervision Work1. The sco
12、pe of supervision work and performance goal1.1 Supervision scopeThe supervision work mainly includes quality control, progress control, contract management, information management, HSE management and comprehensive coordination and track services during the maintenance period on all the civil enginee
13、ring works, M+E installations, decoration works and outdoor works of the project. 1.2 The supervision performance goal1.2.1 The quality control goal: making the project satisfactory in quality.1.2.2 The time schedule control target: meeting the contract requirements. 2. The supervision basis2.1 The
14、laws, legislations, regulations and policies relating to the construction supervision constituted by the nation and local governments and the departments at all levels.2.1.1 Construction Quality Administration Statutes (Order No.279 of State Council)2.1.2 Relevant documents attached to the Construct
15、ion Quality Administration Statutes. 2.1.3 The “Compulsory Construction Standard ” (2002 latest version of the building part)2.1.4 JiangSu provincial construction administration regulations.2.2 The construction supervision contract between the client and the supervision company.2.3 The project desig
16、n documents (including design drawings and variations), memos, minutes and other documents approved by the client.2.4 The construction contract between the client and the contractor, tendering documents and other answering documents. 2.5 The prevailing cost estimate basis and cost administration doc
17、uments.2.6 The main design codes and construction specifications used in the project2.6.1 Construction supervision code GB50319-20002.6.2 Unified standard for the construction quality check.2.6.3 The quality check and acceptance for the foundation works GB50202-20022.6.4 The quality check and accept
18、ance for of the masonry structure works GB50203-20022.6.5 The quality check and acceptance for the concrete structure works GB50204-20022.6.6 The quality check and acceptance for the steel structure works GB50205-20012.6.7 The quality check and acceptance for the roof works GB50207-20022.6.8 The qua
19、lity check and acceptance for floor works GB50209-20022.6.9 The quality check and acceptance for the building decoration works GB50210-20022.6.10 The quality check and acceptance for the water supply and drainage and heating works GB50242-20022.6.11 The quality check and acceptance for the ventilati
20、on and air-conditioning works GB50243-2002 2.6.12 The quality check and acceptance for the electrical installation works GB50303-20022.6.13 Specification for the porous block structure JGJ137-20012.6.14 Unified standard for the reliability of the design of the building structures GB50068-20012.6.15
21、Design Code for foundations GB50007-20022.6.16 Design Code for concrete structures GB50010-20022.6.17 Design Code for anti-earthquake of the building GB50011-20013. Supervision work and working procedures3.1 Preparation period 3.1.1 Examination of the construction drawings.3.1.2 Examination of the n
22、ecessary approvals and qualifications before commencement.3.1.3 Inspection of the construction site.3.2 Construction period3.2.1 To assist the client in organizing the discussion on design drawings and in examining the design changes.3.2.2 To check the preparation work of each contractor, to supervi
23、se them set up and perfect quality assurance system, safety and civilization construction system and ensure their normal operations.3.2.3 Check the contractors Construction Plan, Construction Technical Scheme and Construction Progress Plan and so on, and put forward suggestions and ensure the revise
24、 and implementation, issue the commencement instruction after reporting to the client.3.2.4 Check the subcontracting work which is put forward by the contractor.3.2.5 Help the client to prepare the monthly payment plan, check the completed quantity, approve the monthly payment report, check the vari
25、ation budget, and report the variations during the execution period for approval in time.3.2.6 Check the quality of the materials, semi-manufactured goods and equipment used in the project, require the reexamination or change of the unqualified materials, semi-manufactured goods and equipment.3.2.7
26、Supervise the contractor executes the construction in accordance with the current codes, norms, standards and design requirements strictly. Supervise the execution 24 hours a day on site to control the quality of the work when necessary and during the key point execution.3.2.8 Check the quality of t
27、he work, examine and sign the acceptance of the concealed work and sections, ensure the contractor implement the contract strictly, instruct the contractor correct the work which violates the codes, norms seriously and issue the instruction of stopping work when necessary. Participate in dealing wit
28、h the investigation and analysis of the quality accident and supervise the implementation of the decision.3.2.9 Coordinate the construction progress of each contractor, supervise the contractor implement the contract and deal with the contractors time and cost claims correctly.3.2.10 Keep the copy o
29、f the insurance documents, remind the client or the contractor transact the insurance and assist the client or the contractor carry out the insurance claims.3.2.11 Supervise the implementation of the contract, assist dealing with the contract dispute and claims, settle the dispute between the client
30、 and the contractor and the internal contractors.3.2.12 Examine the contractors progress plan, control the progress and ensure the project completed on time according to the contract. 3.2.13 Examine the design variations strictly and get the clients approval when beyond the agent authority.3.2.14 Issue the payment certificate after the examination of the quality and quantity by the supervisory staff according to the Construction Contract.3.2.15 Supervise the contractor arrange the contract documents and construction technical documents accordi