1、贵州省河道管理条例doc贵州省河道管理条例Standing Committee of the peoples Congress of Guizhou province (promulgated by units)19971121 (time of promulgation)19980101 (time of implementation)Regulations of Guizhou Province on the administration of river courses(adopted at the thirty-first meeting of the Standing Committ
2、ee of the Eighth Peoples Congress of Guizhou Province on November 21, 1997) and effective as of January 1, 1998Chapter I General ProvisionsThe second chapter is regulation and constructionThe third chapter protection and repairThe fourth chapter, legal responsibilityIn accordance with the amendment
3、to the provisions of some local laws and regulations of the Guizhou Province, the following regulations shall be amended as follows:Twenty-seven regulations on the administration of rivers in GuizhouDelete the sixteenth in the after you can handle the procedures and fifth words.Chapter I General Pro
4、visionsThe first is to strengthen the river management, guarantee the safety of flood control, prevent water pollution, the rational development and utilization of rivers, give full play to the comprehensive benefits of rivers and lakes, according to the Peoples Republic of China water law, Peoples
5、Republic of China flood prevention law and relevant laws and regulations, combined with the actual situation of this province, the enactment of this ordinance.Second these Regulations shall apply to the administrative area of the province (including reservoirs, lakes, rivers, waterways and flood can
6、al in Karst River).The waterway within the river shall be governed by the regulations of the peoples Republic of China on the administration of air lanes.Third, the development and utilization of river regulation, should be subject to the overall planning of river basin comprehensive planning and fl
7、ood control, and the combination of pesticides hennessy. Overall planning, overall planning, comprehensive utilization, emphasis on efficiency, and promote the development of various undertakings.Fourth departments of water administration under the peoples governments at or above the county level (h
8、ereinafter referred to as the administrative departments for water administration) are the competent departments of rivers within their respective administrative areas.Relevant departments shall, in accordance with the division of functions and responsibilities, assist in the management of river cou
9、rses.The management of the fifth rivers shall be conducted in accordance with the principle of unified management of water system and hierarchical management.(a) the Yangtze River in Wujiang, three, six red river, Qingshui River River, Chishui River, Furong River, river water, dance (with sound danc
10、e) Yang River; the Pearl River Basin, Yellow River, North Panjiang, Li (sound with Mongolia), Nanpanjiang River, the Red River, river river, management by the provincial administrative department of implementation;(two) the river courses across the administrative areas shall be administered by their
11、 respective administrative departments at the next higher level;(three) this paragraph (a), (two) outside the river, management by the competent department of water administration at the county level.The water administrative department at a higher level may authorize or entrust the lower water admin
12、istrative department to manage the river course.Sixth River flood control and repair work to implement the peoples governments at all levels responsible for the system.Seventh units and individuals who have made outstanding achievements in the regulation, construction, protection and management of r
13、ivers, shall be commended and rewarded by the peoples governments at or above the county level or by the administrative departments of water administration.All levels of the water administrative department and censorial personnel must perform their duties according to law, accept social supervision.
14、The second chapter is regulation and constructionEighth water administrative departments at all levels shall, in conjunction with the relevant departments, according to the requirements of river basin comprehensive planning and national standards for flood control and navigation and other related te
15、chnology, preparation of river regulation and construction plan, approved by the peoples government at the same level, and report on the level of water administrative departments and relevant departments for the record.Renovation and utilization of river and river management in construction, shall b
16、e subject to the river remediation planning, maintenance of levee safety, maintain the stability of river flood, shipping and smooth.The development, utilization, protection and construction of the coastline of the ninth rivers and beaches shall be subject to the river channel regulation plan, the o
17、verall land use planning and the urban construction planning. The river sections that run through towns and large and medium-sized factories and mines shall, in accordance with the jurisdiction of the river management, be prepared by the administrative departments of water in conjunction with the de
18、partments concerned, and shall be implemented after the approval of the peoples governments at the corresponding levels.In tenth administrative regions across the river, river river to build drainage, water blocking, water diversion, water storage, water engineering and river regulation project, the
19、 parties concerned shall solicit opinions, and approved by the water administration department for examination.Eleventh the construction of the water conservancy development, prevention and control of water disasters, river regulation engineering and all kinds of river and wear River, embankment, ri
20、ver bridge, docks, roads, ferries, pipelines, cables and other buildings and facilities, the construction units in the preparation of project documents, according to the river management authority will be submitted to the construction scheme of water administrative department for examination agree,
21、can according to the basic construction procedures of examination and approval procedures.When a construction project is arranged for construction, it shall be carried out in accordance with the approved design or plan. During the construction period, the administrative department of water shall che
22、ck whether it conforms to the river regulation plan.The water conservancy administrative department shall take part in the completion acceptance of the construction project, and the construction unit shall submit the relevant documents and materials to the water administrative department 30 days bef
23、ore the acceptance.The twelfth water administrative departments shall, within 30 days from the date of receipt of the application for the construction project of the construction unit, notify the applicant in writing of the application.The construction unit has objections to the examination opinions
24、, at the date of the receipt of the notice within 15 days on the level of water administrative departments submit an application for review, review by the Department in conjunction with the competent department of planning in accordance with the regulations.Thirteenth bridges, docks and water and dr
25、ainage facilities, must be carried out in accordance with the requirements of the provisions of the national flood control standard, shoreline planning and other technologies, not narrow channel flood.The beam bottom of bridges and Zhanqiao must be higher than the designed flood water level, and kee
26、p a certain height according to the requirements of flood control and shipping.The clearance height of pipelines and lines across the river must meet the requirements of flood control and navigation.The third chapter protection and repairThe scope of the management of the fourteenth rivers shall be
27、determined in accordance with the following principles:(a) with the embankment of the river on both sides of the embankment between the waters, sandbanks, beaches (including arable land), and river dyke;(two) the river without dikes shall be determined according to the designed flood level or the hi
28、ghest flood level in history;(three) within a week, the boundary waters of lake beach, access channel and karst river at the highest flood level is determined;(four) the reservoir is determined according to the check flood level.Delineation of the specific management of the river, by the water admin
29、istrative department at or above the county level in conjunction with the relevant departments, approved by the peoples government at the same level, and pile and bound.Article fifteenth the following activities are prohibited within the scope of river management:(a) the construction of flood and bl
30、ocking karst River and flood channel of buildings and structures;(two) planting water resistance of tall plants (except embankment shelterbelt);(three) set the river fishing and debris disposal of slag, slag, ash, mud and garbage etc.;(four) removal or river embankments, dams and other water enginee
31、ring revetment, and all kinds of measurement, monitoring and other ancillary facilities;(five) in dam and dike safety protection area of wells, drilling, blasting, digging, quarrying, earth and other building ponds safety hazard activities;(six) on both sides of the river and landslides, collapse, l
32、andslides and other natural disasters are a lot of deforestation, reclamation, quarrying, soil, mining and other activities endangering the slope stability;(seven) diverted rivers.Sixteenth the following activities in the area of river management, shall be approved by the Department of water administration, shall go through the relevant formalities:(a) mining, mining, quarrying, earth, gold;(two) blasting, drilling, reclamation, dig ponds, built roads, canals, wells;(three) storage materials such as wood, in the river beach to build factories or other bui