1、电气试验记录表格中英文表 H-421母线安装记录 Bus installation record项目:Project装置:Unit工号: Section名称 Name施工日期Date电压等级VoltagekV图号 Drawing No.母线型号、规格 Bus model and spec.套管、绝缘子型号 Bushing insulator model1、一般安装检查:General installation inspection序号 No.检查调整项目 Inspection and adjustment item安装检查结果 Inspection result1母线型号、规格、材质核对Bus
2、 model, spec, and mat. Inspection型号 规格 材质 Model Specification Material2绝缘子、穿墙套管检查Insulator and lead-in insulator型号规格 油位、密封 绝缘 Model Oil level, seal Insulation3母线支架制作安装Bus support fabrication and installation规格 安装尺寸 防腐 Spec. Dimension Anti-corrosion4母线安装检查 Bus installation排列、相色 弯曲倍率 伸缩节 Arrangement,
3、color Curve radius Expansion joint5连接螺栓、垫圈检查Bolt and washer inspection规格 热镀锌 露出长度 Spec. Galvanization Left length6母线接触面Bus contact area inspection光洁平整 搪锡 电力复合脂 Smooth. Enam. Polymer7硬母线焊接检查Rigid bus welding inspection焊工合格证号 Weldor No.8软母线、组合母线安装Flexible and combine bus installation2、母线接触面连接紧密检测: Bus
4、 contact. Tightness inspection螺栓规格 ( mm) Bolt spec.实测力矩值Actual( N.m ) torque螺栓规格 ( mm) Bolt spec.实测力矩值( N.m) Actual torque螺栓规格 ( mm) Bolt spec.实测力矩值( N.m) Actual torque最小值 Min.最大值 Max.最小值 Min.最大值 Max.最小值 Min.最大值 Max.3、软母线弛度:Flexible bus sag inspection软母线名称 Flexible bus name设计弛度( mm )Design sag实测弛度(
5、mm ) Actual sag4、母线相同、对地最小距离检测:Bus phase and phase to earth min. Distance measure母线类别 Bus type主母线 Main分支母线Branch实测最小相间距离( mm) Min. Phase to phase distance实测最小对地距离Min. Phase to earth distance备注:Remarks结论:Conclusion技术负责人Check施工人Operator表 H-422蓄电池充(放)电记录 Storage battery charging/Discharging record项目:Pr
6、oject装置:Unit工号: Section名称 Name型号Model出厂日期 Manuf. Date电压 VoltageV容量 capacityAh电池总数 Number of battery电解液Electrolyte电解液化验单或合格证号 Electrolyte report or certification No.蒸馏水化验单或合格证号 Distilled water report or certification No.注入时电解液温度 Electrolyte temp. at filling电解液比重Specific gravity of electrolyte开始注入时间 F
7、illing start time结束时间 End time初充电 First charging充电开始时间 Charging start time结束时间 End time单独补充充电的电池编号 Separately charged cell No.放电Discharging放电开始时间 Discharge start time结束时间 End time放电电流 Discharge current放电容量 Discharging capacity为额定容量的 %(换算到 25时)% of rated capacity ( at 25)充(放)电特性曲线图: (充放电记录见附表) Chargi
8、ng/Discharging characteristic curve备注:Remarks结论:Conclusion技术负责人Check施工人 Operator表 H-423蓄电池充(放)电 记录附表 Attached table for storage battery charging/Discharging record项目:Project装置:Unit工号:Section名称Name型号 Model出厂日期 Manufacture date电压 VoltageV容量CapacityAh电池总数 Number of battery时间 Time充(放)电 电压( V) Charge/Dis
9、charge voltage充(放)电 电流( A) Charge/Discharge currentNoNoNoNoNoNoUDTUDTUDTUDTUDTUDT技术负责人Check施工人 Operator日期Date表 H-424Mo记录 ction record项目:Project电机抽芯检查 or loose-core inspe装置: Unit 工号: Section名称Name位号 Tag. No.检查日期 Inspection Date型号Type额定容量 Rated capacitykW额定电压 Rated voltagekV额定电流 Rated currentA接法Connec
10、tion绝缘等级 Insulation class转速 Rotation speedr/min转子结构 Rotor structure防爆等级 Explosion proof class出厂编号 Manufacturer No.制造厂 Manufacturer防护等级 Prevention class检查内容 Installation contents标记 Mark备注 Remark铁芯轴颈无伤痕锈蚀No Damage & corrosion on surface of core shaft滑环和换向器无伤痕、锈蚀No Damage & corrosion on surface of comm
11、utator and slip-ring绕组绝缘层完好,绑线无松动Winding insulation coating and fixing inspection绕组连接正确,焊接良好Winding connection and welding inspection绕组电阻检测合格Winding resistance inspection定子槽楔无断裂凸出及松动,端部槽楔牢固Stator slot wedge inspection转子平衡块紧固,平衡螺丝锁车Rotor balance block and bolt fixing inspection风扇完好,方向正确Fan inspection
12、磁极及铁轭固定良好Magnetic pole and hub fixing inspection励磁绕组紧固Exciter winding fixing inspection鼠笼式电机转子导电条和端环焊接良好,浇铸无裂纹 Rotor conductor and end link of squirrel-cage motor轴承滚动体与内、外圈转动灵活无松动、卡涩Bearing rotating flexibility inspection加入轴承内的润滑脂已填满内部空间的三分之二 Internal space of bearing is filled with lubrication grea
13、se电机机部清洁无杂物Motor internal cleanliness inspection结论:Conclusion技术负责人Check施工人Operator表 H-425电机干燥记录 Motor drying record项目:Project装置:Unit工号: Section名称 Name位号 Tag. No.干燥日期 Drying Date型号 Type额定容量 Rated capacitykW绝缘等级 Insulation class定子电压 Stator voltageV转子电压 Rotor voltageV制造厂 Manufacturer定子电流 Stator current
14、A转子电流 Rotor currentA出厂日期 Manuf. Date接线Connection转速Rotation speedr/min出厂编号 Manufacturer No.干燥方法简述Brief discription of drying method干燥开始时间 Drying start time年月日时分Date干燥结束时间 Drying end time年月日时分Date干燥过程最高温度 Max. drying temp.定子 Stator转子 Stator干燥后绝缘电阻及吸收比Insulation resistance and absorptance after drying.
15、测试部位 Test position定子对地 Stator to earth转子对地 Rotor to earth电机温度() Motor temperatureR15 (M)R60(M)KR15( M)R60 (M )K备注:Remarks结论:Conclusion技术负责人Check施工人Operator表 H-426电机干燥记录附表 Attached table for motor drying record项目:Project装置:Unit工号:Section时间Time温度() Temp.定子绝缘电阻 (M) Stator ins. resistance转子绝缘电阻 (M) Roto
16、r ins. resistance干燥电流(A) Drying current备注Remark123456测温点位置: nTemp. measure position1. ;2. ;3. ;4. ;5. ;6. ;技术负责人Check施工人Operator日期Date表 H-427电机Motor记录record项目:Project试车 test run装置:Unit工号:Section序号 No.电机名称或 位号Motor name or tag. No.额定数据 Rated data试车记录数据 Test run record data环境 温度 () Envi-ro nment temp.
17、试车 日期 Date容量 (kW) Capa -city电压 (V)Vol-t age电流 (A) Curr.绝缘 等级 Ins. class绝缘 电阻 (M)Ins.resis.电压 (V)Vol-ta ge空载 电流 (V) Vol-t age负载 电流 (A) No-Lo ad curr.电机 温度 (A)Motor temp.轴承温度() Bearing temp.前Front后Rear备注:Remarks结论:Conclusion技术负责人Check施工人 Operator表 H-428架空线路施工记录 Overhead line stringing record项目:Project
18、装置:Unit工号: Section线路名称 Line name施工日期Date线路电压Voltage线数 Line number线路长度 Length线路起点 Start place线路终点 End place施工记录Stringing record电杆型号、规格及数量 Pole model, spec. Quantity拉线材料及组数Stay material and quantity导线型号及规格 Line model and spec.路灯型号及数量Road lamp model and quantity绝缘子型号及规格 Insulator model and spec.路灯线型号及规格 Road line model and spec.弛度Sag耐张杆号(号一号) Anchor pole (No. No.)设计弛度( mm )Design sag实测驰度( mm ) Real sag环境温度() Environment temp.对地、交叉跨越距离测量:Line to earth and to cross-over objects distance measurement跨越杆号 号一号 Cross-over pole No.-N0.被跨越物名称 Cross-over obje