基础施工技术要求英文翻译

TECHNICALSPECIFICATIONSFORCONSTRUCTIONQUALITYOFBUILDINGGRADE&FOUNDATIONS

1keypointSofqualitycontrol

1.1Basicconstructionconditionsofbuildingfoundations

1.1.1Geotechnicalexplorationdataofrockandearthengineering.

1.1.2Thedesigndocumentandothertechnicaldocumentsareavailable,theconstructiondrawingshavebeenjointlycheckedup,thenecessarytechnicaldeliveryandtraininghavebeenaccomplished.

1.2Earthwork

1.2.1Generalrequirement:

(1)Balancecalculationonexcavatingandfillingshouldbeaccomplishedbeforeearthworkconstruction,consideringminimumtransportingdistance,reasonabletransportingpathandreasonableconstructionprocedureandotherfactorssynthetically,properlyallocatetheearthwork,reducerepeatedexcavationandtransportation.

(2)Grounddrainageanddewateringshouldbedonebeforeexcavation

(3)Thegradientofthesitesurfaceshouldbeinaccordancewithdesigningrequirement,ifwithoutspecificrequirement,thegradientofdrainagedirectionshouldnotbelessthan2‰.Thesitesurfaceshouldbecheckedperpoint.Setonecheckingpointevery100~400m2,andcheckpointsshouldnotbelessthan10points;set1pointevery20matlength,widthandedgeslope,notlessthan1pointeachside.

(4)Theplanposition,levelelevationandsideslopegradeshouldbemeasuredoftenduringearthworkconstruction.Reliableprotectingmeasurementshouldbeappliedtoplan-controlpilingandlevel-controlpoint,andcheckorreviewshouldbedoneperiodically.Soilshouldn’tbeplacedattheedgeoffoundationpit.

1.2.2Excavationofsoil:

(1)Beforeexcavation,setting-out,drainageanddewateringshouldbechecked,andtransportingroadofvehiclesanddumpareaofsoilshouldbearrangedreasonably.

(2)Theconstructionscheme,environmentprotectingmeasurementandsupervisionschemeshouldbeworkedoutaccordingtoexcavatingdepth,geologicalconditions,constructionmethod,environment,projectperiod,climateandgroundloadingandotherinformation,andtheexcavationoffoundationpit(groove)andundergroundpipingtrenchshouldapprovedbygeneralcontractorbeforeexcavation.

(3)Checkplanposition,horizontalelevation,gradeofsideslope,compactness,,drainage,dewateringsystemduringconstruction,andobserveenvironmentalchangesfromtimetotime.

(4)Sideslopevalueoftemporaryearthworkexcavationshouldbeinaccordancewiththerequirementofthefollowingtable1:

Table1Sideslopevalueoftemporaryearthworkexcavation

Sortofsoil

Sideslopevalue(Height:

width)

Sandysoil(notincludingfinesandandpowdersand)

1:

1.25~1:

1.5

Commonclay

Hard

1:

0.75~1:

1.00

Hard,plasticity

1:

1.00~1:

1.25

Soft

1:

1.50orevensoft

Gravel

Fillingrigid,hardplasticclay

1:

0.50~1:

1.00

Fillingsandysoil

1:

1.00~1:

1.50

Notes:

1.Inaccordancewithdesignrequirementwhenthereisany.

2.Ifapplywater-decreaseorotherreinforcesmeasurement,thelimitofthistablecouldbenotapplied,butcalculatedtocheckmustbedone.

3.Theexcavationdepthshouldn’texceed4mforsoftsoiland8mforhardersoil.

(5)Thequalityinspectionstandardofearthworkexcavationshouldbeinaccordancewithrequirementoffollowingtable2:

Table2Thequalityinspectionstandardofearthworkexcavation(mm)

Sort

 

No.

Item

Permittedtolerance

Testingmethod

ColumnFoundation

Foundationpit

Foundationgroove

Trimandoftheexcavationsite

Pipe

Trench

Foundation

Ofground

Manual

Mechanical

Maincontrolitems

1

Elevation

-50

±30

±50

-50

-50

Spiritlevel

2

Length,width(measurefromcentertosides)

+200

-50

+300

-100

+500

-150

+100

——

Transitinstrument,measuredbysteelrule

3

Sideslope

Refertotable1

Checkedbygraderuler

Commoncontrolitems

1

Levelofsurface

20

20

20

20

20

Checkedbyleaningrulerof2mandwedge-shapedfillingruler

2

Soilchar-

acteristicsofFound-

ation

Byobserveoranalyzeonsoilsample

Note:

Thedeviationsofground(road)FoundationonlyapplicabletoFoundationsthatmakeground(road)surfaceonexcavateandfilldirectly.

1.2.3Backfilloftheearthwork

(1)Clearawaygarbage,rootandothersundriesatbottom,takeoutseepageandsilt,andcheckandacceptbottombeforebackfilling..Backfillonploughedsoilorsoftsoilshouldbemadeafterthefoundationhasbeencompacteddensely.

(2)Checkdrainagemeasurement,fillingthicknessofeachlayer,water-containingcontrolandcompactdegreeduringbackfilling,Thefillingthicknessandcompacttimesshouldbedeterminedbysoiltexture,compactcoefficientandappliedequipment.Ifwithoutexperimentalbasis,theninaccordancewithrequirementoffollowingtable3:

Table3Delaminatingthicknessandcompacttimesduringbackfillconstruction

Compactequipment

Delaminatingthickness(mm)

Compacttimesofeachlayer

Flatgrind

250-300

6-8

Vibratingcompactmachine

250-350

3-4

Dieseloilrammingmachine

200-250

3-4

Manualtamping

<200

3-4

(3)Checkelevation,gradeofsideslope,compactnessandotheritemsafterbackfillingconstructionwithstandardinaccordancewithrequirementofthefollowingtable4:

Table4QualityinspectionstandardofBackfilling(mm)

Sort

No.

Item

Permittedtolerance

Testingmethod

ColumnFoundation

Foundationpit

Foundationgroove

Levelingofexcavationsite

Pipetrench

FDN.Ground(road)Base

Manual

Mechanical

Majorcontrolitems

1

Elevation

-50

±30

±50

-50

-50

Spiritlevel

2

Eachlayercompact–ness

Designrequirement

1

Backfillearthwork

Designrequirement

Sampletestordirectview

Generalitems

2

LayerThicknessandmoisture

Designrequirement

SampletestandSpiritlevel

3

Levelnessofthesurface

20

20

20

20

20

Checkedbyrulerorspiritlevel

1.2.4

1.2.5Fore-controlofPilingWork

1.2.6Checkandacceptofdata:

qualitycertificateofprecast-pilingprovidedbymanufacturer

1.2.7Checkandacceptofarrivedmaterials:

Appearanceanddimensioncheckingofpilesarrivedatconstructionsite.

1.2.8Preparationofpilingwork:

(1)MeasurementofcontrolnetworkandFoundationpointoflevel:

(thepermissibledeviationofpilingpositionis:

20mmforgrouppiling,10mmforsingle-linedpiling.

(2)Ifbuildingsexistnearby,anti-shocktrench(withwidthof0.5-0.8mm)andothershock-isolatingmeasurementshouldbeappliedtodecreasetheinfluencetothem.

(3)Determinepilingsequence:

generallyproceedfromcentertobothsymmetricsidesorinonedirection,fromcentertothearound,fromdeeptoshallow,frombigtosmallandfromlongtoshort.

(4)Checkpillingmechanism:

(a)Settingmeasuringscaleatsidesorframeofthepiling;

(b)Settingspringpadbetweenhammerandpilingcap,pilingcapandpiling,suchashardwood,sack,mat,etc.

(5)Forpilesoflargelengthorsubjecttomorethan500timesofhammering,hammeringcannotbedoneuntilcheckedthepilebodystrengthisqualifiedandafter28daysagingtime.

1.3Middlecontrolofpilingwork:

1.3.1Liftingcontrolofpre-madepiling:

theconcretepre-madepilingshouldonlybeliftedtillthestrengthofwhichislargerthan70%designvalue,andbetransportedtillthestrengthofwhichisupto100%designvalue.

1.3.2Processcontrolofpiling:

(1)Heavyhammerandlowbeating;

(2)Theclearancebetweenpilingcapanditscircumstanceshouldbe5~10mm;

(3)Pilinghammer,pilingcapandpilingbodyshallbeonthesamecenterline;

(4)Thedeviationofverticalityatpilinginsertingshouldnotexceed0.5%;

(5)Whenpilingtipisintohardclayorsandysoil,focusoncontrollingtheinsertingotherthanthedesignedpiletopelevation.Whenpilingtipentersintosoftsoil,focusoncontrollingpiletopelevationotherthaninsertingdepth.However,theimplementationshallfollowtherequirementsofdesigndrawings.

(6)Whenreachingtheinsertingdepthbutnotthedesignedtopelevation,hammer3groupsmorewith10strokesineachgroupandinsertingdepthofeachgroupshallnotexceedthedesigneddatatoverify.Thecontrolledinsertingdepthshallbedefinedwithrelatedorganizationswhennecessary.

(7)Suspendpilingincaseofthefollowingconditions,whilereporttosupervisorintime:

(a)Sharpchangeofinserting;

(b)Suddeninclining/shiftingorseriousreboundingofpile.

(c)Severecrackorcrashoccurredatpiletoporpilebody.

1.3.3Controlofpileconnection:

(1)Theweldingmaterialshallmeetthefollowingregulationsincaseofweldingconnectionandsteelsheetshallbeoflowcarbonsteel.

(2)Whenapplyweldingconnection,fixfouranglesfirstlywithspotwelding,thenweldsymmetrically,whileensurequalityandsizeofwelding.

(3)RefertoTable5forqualityofweldingofpileconnection.

Table5:

No.

Items

AllowableTolerance

Testingmethod

Unit

Value

1

Weldingseamofelectro-weldedpilingconnection:

Upanddownendscrossing

Innerdiameter<700

(2)Undercutdepth

(3)Reinforcementlayerthickness

(4)Reinforcementlayerwidth

 

mm

mm

mm

mm

 

≤2

≤0.5

2

2

 

Measuredbysteelrule

Weldingjointtester

Weldingjointtester

Weldingjointtester

2

Theceasedtimeafterelectro-welding

min

   >1

Measuredbystopwatch

1.4CheckandacceptofConstructionQualityforPiling(refertotable7)

1.4.1Thequalitycheckofpre-madepilinginclude:

piling-making,infiltratedepth,standardofhammerstopping,pilingpositionandverticality;

1.4.2Asforgrade1buildingfoundationsorpilefoundationsofpoorgeologicalconditionsorunreliablepilingquality,carryoutpilingqualitytest.

1.4.3Checkingmethodcouldbedynamictestingmethod,ortakingdrillrockcor