基础施工技术要求英文翻译
TECHNICALSPECIFICATIONSFORCONSTRUCTIONQUALITYOFBUILDINGGRADE&FOUNDATIONS
1keypointSofqualitycontrol
1.1Basicconstructionconditionsofbuildingfoundations
1.1.1Geotechnicalexplorationdataofrockandearthengineering.
1.1.2Thedesigndocumentandothertechnicaldocumentsareavailable,theconstructiondrawingshavebeenjointlycheckedup,thenecessarytechnicaldeliveryandtraininghavebeenaccomplished.
1.2Earthwork
1.2.1Generalrequirement:
(1)Balancecalculationonexcavatingandfillingshouldbeaccomplishedbeforeearthworkconstruction,consideringminimumtransportingdistance,reasonabletransportingpathandreasonableconstructionprocedureandotherfactorssynthetically,properlyallocatetheearthwork,reducerepeatedexcavationandtransportation.
(2)Grounddrainageanddewateringshouldbedonebeforeexcavation
(3)Thegradientofthesitesurfaceshouldbeinaccordancewithdesigningrequirement,ifwithoutspecificrequirement,thegradientofdrainagedirectionshouldnotbelessthan2‰.Thesitesurfaceshouldbecheckedperpoint.Setonecheckingpointevery100~400m2,andcheckpointsshouldnotbelessthan10points;set1pointevery20matlength,widthandedgeslope,notlessthan1pointeachside.
(4)Theplanposition,levelelevationandsideslopegradeshouldbemeasuredoftenduringearthworkconstruction.Reliableprotectingmeasurementshouldbeappliedtoplan-controlpilingandlevel-controlpoint,andcheckorreviewshouldbedoneperiodically.Soilshouldn’tbeplacedattheedgeoffoundationpit.
1.2.2Excavationofsoil:
(1)Beforeexcavation,setting-out,drainageanddewateringshouldbechecked,andtransportingroadofvehiclesanddumpareaofsoilshouldbearrangedreasonably.
(2)Theconstructionscheme,environmentprotectingmeasurementandsupervisionschemeshouldbeworkedoutaccordingtoexcavatingdepth,geologicalconditions,constructionmethod,environment,projectperiod,climateandgroundloadingandotherinformation,andtheexcavationoffoundationpit(groove)andundergroundpipingtrenchshouldapprovedbygeneralcontractorbeforeexcavation.
(3)Checkplanposition,horizontalelevation,gradeofsideslope,compactness,,drainage,dewateringsystemduringconstruction,andobserveenvironmentalchangesfromtimetotime.
(4)Sideslopevalueoftemporaryearthworkexcavationshouldbeinaccordancewiththerequirementofthefollowingtable1:
Table1Sideslopevalueoftemporaryearthworkexcavation
Sortofsoil
Sideslopevalue(Height:
width)
Sandysoil(notincludingfinesandandpowdersand)
1:
1.25~1:
1.5
Commonclay
Hard
1:
0.75~1:
1.00
Hard,plasticity
1:
1.00~1:
1.25
Soft
1:
1.50orevensoft
Gravel
Fillingrigid,hardplasticclay
1:
0.50~1:
1.00
Fillingsandysoil
1:
1.00~1:
1.50
Notes:
1.Inaccordancewithdesignrequirementwhenthereisany.
2.Ifapplywater-decreaseorotherreinforcesmeasurement,thelimitofthistablecouldbenotapplied,butcalculatedtocheckmustbedone.
3.Theexcavationdepthshouldn’texceed4mforsoftsoiland8mforhardersoil.
(5)Thequalityinspectionstandardofearthworkexcavationshouldbeinaccordancewithrequirementoffollowingtable2:
Table2Thequalityinspectionstandardofearthworkexcavation(mm)
Sort
No.
Item
Permittedtolerance
Testingmethod
ColumnFoundation
Foundationpit
Foundationgroove
Trimandoftheexcavationsite
Pipe
Trench
Foundation
Ofground
Manual
Mechanical
Maincontrolitems
1
Elevation
-50
±30
±50
-50
-50
Spiritlevel
2
Length,width(measurefromcentertosides)
+200
-50
+300
-100
+500
-150
+100
——
Transitinstrument,measuredbysteelrule
3
Sideslope
Refertotable1
Checkedbygraderuler
Commoncontrolitems
1
Levelofsurface
20
20
20
20
20
Checkedbyleaningrulerof2mandwedge-shapedfillingruler
2
Soilchar-
acteristicsofFound-
ation
Byobserveoranalyzeonsoilsample
Note:
Thedeviationsofground(road)FoundationonlyapplicabletoFoundationsthatmakeground(road)surfaceonexcavateandfilldirectly.
1.2.3Backfilloftheearthwork
(1)Clearawaygarbage,rootandothersundriesatbottom,takeoutseepageandsilt,andcheckandacceptbottombeforebackfilling..Backfillonploughedsoilorsoftsoilshouldbemadeafterthefoundationhasbeencompacteddensely.
(2)Checkdrainagemeasurement,fillingthicknessofeachlayer,water-containingcontrolandcompactdegreeduringbackfilling,Thefillingthicknessandcompacttimesshouldbedeterminedbysoiltexture,compactcoefficientandappliedequipment.Ifwithoutexperimentalbasis,theninaccordancewithrequirementoffollowingtable3:
Table3Delaminatingthicknessandcompacttimesduringbackfillconstruction
Compactequipment
Delaminatingthickness(mm)
Compacttimesofeachlayer
Flatgrind
250-300
6-8
Vibratingcompactmachine
250-350
3-4
Dieseloilrammingmachine
200-250
3-4
Manualtamping
<200
3-4
(3)Checkelevation,gradeofsideslope,compactnessandotheritemsafterbackfillingconstructionwithstandardinaccordancewithrequirementofthefollowingtable4:
Table4QualityinspectionstandardofBackfilling(mm)
Sort
No.
Item
Permittedtolerance
Testingmethod
ColumnFoundation
Foundationpit
Foundationgroove
Levelingofexcavationsite
Pipetrench
FDN.Ground(road)Base
Manual
Mechanical
Majorcontrolitems
1
Elevation
-50
±30
±50
-50
-50
Spiritlevel
2
Eachlayercompact–ness
Designrequirement
1
Backfillearthwork
Designrequirement
Sampletestordirectview
Generalitems
2
LayerThicknessandmoisture
Designrequirement
SampletestandSpiritlevel
3
Levelnessofthesurface
20
20
20
20
20
Checkedbyrulerorspiritlevel
1.2.4
1.2.5Fore-controlofPilingWork
1.2.6Checkandacceptofdata:
qualitycertificateofprecast-pilingprovidedbymanufacturer
1.2.7Checkandacceptofarrivedmaterials:
Appearanceanddimensioncheckingofpilesarrivedatconstructionsite.
1.2.8Preparationofpilingwork:
(1)MeasurementofcontrolnetworkandFoundationpointoflevel:
(thepermissibledeviationofpilingpositionis:
20mmforgrouppiling,10mmforsingle-linedpiling.
(2)Ifbuildingsexistnearby,anti-shocktrench(withwidthof0.5-0.8mm)andothershock-isolatingmeasurementshouldbeappliedtodecreasetheinfluencetothem.
(3)Determinepilingsequence:
generallyproceedfromcentertobothsymmetricsidesorinonedirection,fromcentertothearound,fromdeeptoshallow,frombigtosmallandfromlongtoshort.
(4)Checkpillingmechanism:
(a)Settingmeasuringscaleatsidesorframeofthepiling;
(b)Settingspringpadbetweenhammerandpilingcap,pilingcapandpiling,suchashardwood,sack,mat,etc.
(5)Forpilesoflargelengthorsubjecttomorethan500timesofhammering,hammeringcannotbedoneuntilcheckedthepilebodystrengthisqualifiedandafter28daysagingtime.
1.3Middlecontrolofpilingwork:
1.3.1Liftingcontrolofpre-madepiling:
theconcretepre-madepilingshouldonlybeliftedtillthestrengthofwhichislargerthan70%designvalue,andbetransportedtillthestrengthofwhichisupto100%designvalue.
1.3.2Processcontrolofpiling:
(1)Heavyhammerandlowbeating;
(2)Theclearancebetweenpilingcapanditscircumstanceshouldbe5~10mm;
(3)Pilinghammer,pilingcapandpilingbodyshallbeonthesamecenterline;
(4)Thedeviationofverticalityatpilinginsertingshouldnotexceed0.5%;
(5)Whenpilingtipisintohardclayorsandysoil,focusoncontrollingtheinsertingotherthanthedesignedpiletopelevation.Whenpilingtipentersintosoftsoil,focusoncontrollingpiletopelevationotherthaninsertingdepth.However,theimplementationshallfollowtherequirementsofdesigndrawings.
(6)Whenreachingtheinsertingdepthbutnotthedesignedtopelevation,hammer3groupsmorewith10strokesineachgroupandinsertingdepthofeachgroupshallnotexceedthedesigneddatatoverify.Thecontrolledinsertingdepthshallbedefinedwithrelatedorganizationswhennecessary.
(7)Suspendpilingincaseofthefollowingconditions,whilereporttosupervisorintime:
(a)Sharpchangeofinserting;
(b)Suddeninclining/shiftingorseriousreboundingofpile.
(c)Severecrackorcrashoccurredatpiletoporpilebody.
1.3.3Controlofpileconnection:
(1)Theweldingmaterialshallmeetthefollowingregulationsincaseofweldingconnectionandsteelsheetshallbeoflowcarbonsteel.
(2)Whenapplyweldingconnection,fixfouranglesfirstlywithspotwelding,thenweldsymmetrically,whileensurequalityandsizeofwelding.
(3)RefertoTable5forqualityofweldingofpileconnection.
Table5:
No.
Items
AllowableTolerance
Testingmethod
Unit
Value
1
Weldingseamofelectro-weldedpilingconnection:
Upanddownendscrossing
Innerdiameter<700
(2)Undercutdepth
(3)Reinforcementlayerthickness
(4)Reinforcementlayerwidth
mm
mm
mm
mm
≤2
≤0.5
2
2
Measuredbysteelrule
Weldingjointtester
Weldingjointtester
Weldingjointtester
2
Theceasedtimeafterelectro-welding
min
>1
Measuredbystopwatch
1.4CheckandacceptofConstructionQualityforPiling(refertotable7)
1.4.1Thequalitycheckofpre-madepilinginclude:
piling-making,infiltratedepth,standardofhammerstopping,pilingpositionandverticality;
1.4.2Asforgrade1buildingfoundationsorpilefoundationsofpoorgeologicalconditionsorunreliablepilingquality,carryoutpilingqualitytest.
1.4.3Checkingmethodcouldbedynamictestingmethod,ortakingdrillrockcor