光伏电站建设项目
资料需求清单
北京智创未来咨询有限公司
2.5.1项目具体地址·····························································································32.5.2项目建设地地质条件··················································································32.5.3项目建设地太阳能资源条件······································································32.5.4项目建设地周边并网条件如何··································································42.6项目周边市政供应································································································42.7项目用地···············································································································42.8项目建设规划········································································································42.9项目总平面布置图······························································································52.10项目设备采购清单······························································································62.11项目建设总周期································································································152.12项目用工计划····································································································153.项目投资·······························································································································04.项目资金筹措方式················································································································15.项目前期规划案(WordorPPT)··················································································1
1.项目承办建设单位背景信息
1.1承办建设单位基本信息表
茶叶和酸奶,包括芹菜,柠檬水都可以帮助排出身体里的毒素。
大量补充维生素的同时,抑制细菌生长的环境,当然如果吃维生素药片的话,里面的添加剂反而会造成消化功能紊乱。
(股东出资、股权占有情况及股东、董事简历/背景介绍)
2.项目基本情况
2.1项目名称
新建or扩建or改建or迁建(新建)
2.3项目法人属性
新设法人还是既有法人实施,如果是新设法人,新设法人的组建方案,股东构成及出资情况请予以说明
2.4项目目的
表项目承建单位实施本项目之目的
2.5.1项目具体地址()
2.5.2项目建设地地质条件2.5.3项目建设地太阳能资源条件
2.5.4项目建设地周边并网条件如何
2.6项目周边市政供应
上表中仅需列入本项目涉及的即可。
2.7项目用地
该地块是否需要进行土地平整整理,若是,整理1亩的价格在当地约为多少?
2.8项目建设规划
表:
范例
是否有建筑构建物?
如有?
是什么?
什么结构,建设成本如何?
以下是举例:
2.9项目总平面布置图
以下仅仅是范例,若贵司业已制作出总平面布置图,请提供:
SEPD第6页
2.10项目设备采购清单
SEPD第7页
SEPD第8页
SEPD第9页
SEPD第10页
SEPD第11页
SEPD第12页
SEPD第13页
可行性研究报告
SEPD第14页
可行性研究报告
SEPD第15页
2.11项目建设总周期
本项目建设周期总计XXX年
2.12项目用工计划
以下仅仅是范例,请根据本项目实际设想填写:
3.项目投资
下表是我司完成的其他项目的投资构成情况,请根据贵司建设本项目的实际设想,列出投资大项目,我们再细化并核实。
4.项目资金筹措方式
若考虑银行贷款,请提供贵司银行资信证明
5.项目前期规划案(WordorPPT)