900P00803 CA Hold Tank cleaningprocedure.docx

《900P00803 CA Hold Tank cleaningprocedure.docx》由会员分享,可在线阅读,更多相关《900P00803 CA Hold Tank cleaningprocedure.docx(12页珍藏版)》请在冰豆网上搜索。

900P00803 CA Hold Tank cleaningprocedure.docx

900P00803CAHoldTankcleaningprocedure

 

CACATHoldTank

(900-P-008-03)

 

 

1

10-Mar-09

RevisedBySKComments

C.G.Jung

C.G.Jung

H.S.Yang

0

22-Feb-09

IssuedforApproval

C.G.Jung

C.G.Jung

H.SYang

REV.

DATE

DESCRIPTION

ORIGINALBY

CHECKEDBY

APPROVEDBY

CLIENTAPPROVAL

 

INDEXOFCONTENTS

 

1.0PURPOSEpage3

2.0REFERENCEpage3

3.0SPECIALTOOLSpage3

4.0PRECAUTIONONPLANNINGpage3~4

5.0PREPARATIONFORWASHINGANDBLOWINGpage4~7

6.0OPERATINGPROCEDUREpage7~9

7.0ACCEPTANCECRITERIApage9

8.0REINSTATEMENTpage9

9.0PRESERVATIONpage9~10

10.0ATTACHMENTpage10

 

1.0PURPOSE

Thissectioncoverstherequirementsforcleaningoftankandrelevantlinesfromthesand,dust,rustparticles,afterhydrotestofCACATTankandconnectedpipesasasupplementofcleaningprocedure.

Thewatercirculation/flushingandblowingoperationsshallbecarriedoutsystematicallyuntilbeingsurethatnoforeignmatteriscirculatingatthemomentofStartUp.

 

Material

Washing/Blowing

Pressure(K/G)

Washing/Blowing

Temperature(℃)

Remark

CACAT

Tank

5.0~14.0

Ambient

Flushing:

Demiwater

Nitrogen/WF

Line

5.0~7.0

Ambient

Blowing:

IA(N2)

 

2.0REFERENCE

Thefollowingdocumentsshallbereferred.

Marked-uplatestP&ID(Greencolor:

WaterFlushing,Redcolor:

AirBlowing)

Lineschedule

Tank&Pipinglayoutdrawing

Detailedwashing/flushing/blowingprocedure

Requests,informationandconfirmationitems

 

3.0SPECIALTOOLS

Rubberhoseforwater/airsupply(Flexiblehose)

Varioussizesofwrenches

Varioussizesofpipewrenches

Personnelsafetyequipment

Safetyequipment(safetyrope,safetysignboard,etc)

Ladders(ifnecessary)

4.0PRECAUTIONONPLANNING

CleaningplansshouldbepreparedinaccordancewithPre-commissioningprocedureandspecificjobspecification.

Forwatercleaningbycirculation,prepareaschemedrawingbyenteringthe

informationintheduplicatesoftheP&IDdiagramandutilityflowdiagram.

Astomaterialsconsiderednecessaryindesigningacleaningplan,prepareamateriallisttoarrangeforobtainingnecessarymaterials.

Openandclosetheventanddrainvalvesatthepropertimetocheckforclogging.

Forwater/aircleaning,markthedischargepoint“Danger”ormakeabarricadetapearounditbyasuitablemeans.

Plandisposalofsludgeandwasteliquidsduringthetankwashingandlineflushing

Fortemporarypiping,usepipingmaterialsthatarefreefromrustandcontamination.

Airblowingisahazardousoperation,veryhighforcesaregeneratedattheoutletpipe.

therefore,specificsafetyproceduresmustbecloselyadheredto;

anareaofatleast10metersaroundoutletpointswillberopedoffatthereleaseof

airespeciallyduringsummerseason

 

5.0PREPARATIONFORWASHINGANDBLOWING

 

Beforethewaterflushing/blowingthroughthetankandconnectedlines,theyshallberequiredtopreparethecircuitsbycarryingoutfollowingoperations.

Fieldsupervisorwillprovideanytemporaryandsuitablereinforcementonthesupportsinordertoavoidanypipingmovementduringthecleaning.

Opentheflangeatconnection,andinstallablindplatetothedrumsuctionanddischargenozzlestopreventtheentryofforeignmatterintothem.

Allmeasurementelement,diaphragm,instrument,PSVcontrolandcheckvalvethatmightbepluggedbydirt,shallberemovedfromtheflushinglinesandwashingtanks.

Fortemporaryflushing/blowing,usecompressedasbestosgaskets.

Insertpropergasketsonlyforthefinalreassemblingofthecircuit.

IfnotsupplybyfixedtemporarydemiwaterfromU&O,usethealternativewater,whichshouldbeprepared.

Waterconsumptionisestimatedtobemoredoublethevolumeofpipingandtank.

IfnotsupplybypermanentaircompressorfromU&O,usethetemporaryaircompressor,whichshouldbepreparedinthefollowingway.

a.Installanoilfiltertothedischargesideoftemporarycompressortopreventtheentranceofoilintoequipmentoruseanoil-freecompressor

b.Temporarycompressorwillbeequippedwithconnectionhose,engineoil,coolingsystemandtemporarydryeretc.

Fortemporaryflushing/blowing,usecompressedasbestosgaskets.

Insertpropergasketsonlyforthefinalreassemblingofthecircuit.

Confirmalwayscleaningwater/airofsourcethroughLABanalysis,beforeinitialstartforblowingandwashing.

5.1InternalWashingforTank

InternalwashingofdrumisgenerallyperformedbyaspecializedSUBcontractor,whichwillberequestedtoissuetherelevantcleaningdetailedprocedure.

ForFloatingRoofTank(FRT)madebythestainlesssteel,itisnecessaryto

Chemicaltreatmentphasetoremoveironoxidesbysubcontractor

Finallyinternalsurfaceshouldbecompletelycleanedwiththewashingwater

Thewashingofwallinsideoftankwithpressuredspraywateriseffectiveinremovingloosedebris,rustandmillscale.

Elementsofinsideoftankinthevicinityshallbeprotectedfromthewaterspray,ifnecessary

Adequatemeasuresshallbetakentoensuresafeandenvironmentallyacceptabledisposalofeffluent

Aftercleaningtheinsidedrum,wipethemoistureofthedrumbottombyclothes,ifpossible

 

5.2Drying-outforTank(ifneed)

 

Beforechargingtheprocessfluidssuchasproductsandfeedstockintothestoragetanks,thesystemincludingthepipesandaccessories,shouldbedriedoutthoroughlytoavoidthecontaminationofwashedwater.

Afterthewaterwashingandhydrostatictestofthestoragetanks,theremainedwatershouldbedrainedoutcompletelythroughtheeachpoint

Takecarenottogetvacuumtankduringthewaterdraining.Ventvalveormanholecovershallbefullyopenedforthatpurpose.

Dryingiscarriedoutbyblowingtheairtotheatmospherethroughtheventanddrainvalves,inthatcaseblowingcanbeperformedwithtemporarilyinstalledequipmentsuchasblower,compressorandfanetc.

Ifthedewpointofthegasinthetankreachestotherequiredvalue,dryingiscompleted

Thedryplantairispreferableforthedryingoutoftheatmospherictankshouldremovedduringthedryingoutoperationtoavoidthepluggingofthembythedustaccompaniedwithblownair

5.3InternalInspectionforTank

Beforetostartanyactivityonstaticequipmentitisnecessarytoinspectinternallyforcleanliness,

Internalatmosphereshallbetestedtochecktheoxygencontentanddetectthepresenceofanydangeroussubstancebeforeenteringinthedrumandtheconfinedspaceentryprocedureshallbefollowed.

Tankshallbesufficientlycleanedtoallowvisualinspectionofallinternalsurfaces(ifanylighting,ventilationunitorscaffoldingisrequired,theyshallbeproperlyprovideasperrelevantsiteprocedures).

Tankshallbecheckedforcorrosion,erosion,anddamage;incasestartingcorrosionevidencewillbefounditwillbereportedtoContractorCorrosionSpecialist.

Tankconnectionsshallbeinspectedtoensurethatapropernumberofthreadsareengagedbasedonsupplierrequirementsandpipingspecification.

Allopeningsleadingtoanyexternalfittingsorcontrolsshallbeexaminedasthoroughlyaspossibletoensuretheyarefreefromobstructions.

Tankclosures,whichareusedfrequentlyintheoperationofapressuretank,shallbecheckedforadequacyandwear.

 

5.4FinalBox-up

Boxupisthefinalactivitytobeperformedonstaticequipmenttoensurethemechanicalrequirementshavebeenachievedtomaketheequipmentreadytocontainhydrocarbonsandutilities

Performfinalinspectionbeforemanholeclosing.Appropriateactionshallbetakenifanyfurthercleaningisrequired;

Beforeboxingup,verifymanholeflangefinishesandcleanliness.Properfinalgasketsandboltsmustbeusedforfinalboxingup;

EquipmentoffinalboxingisuptobeapprovedbyOwner.

 

5.5RotatingEquipment

ItincludesalltheseactivitiesrequiredtoachievetheREADYFORSTART.

Duringthisphaseelectricalequipmentwillbefinallyenergizedandequipment/circuitwillbepressurizedandtestedtocheckasfaraspossibletheirperformancebyconstructionteam

∙Preoperationalchecks

∙Bearingpreparation

∙Pipingcleaning

∙Driverpre-rotationalcheck

∙Motorsolorun

∙Re-coupling&Finalshaftalignment

∙Finalloop&functioncheck

 

6OPERATINGPROCEDURE

 

6.1Waterflushingbydirectsupplyofwater

 

Theplanforcleaningeachpipingwithwaterdirectlysuppliedfromthewatersource,withtemporarypiping,shouldbepreparedinthefollowingway:

Decidethevalvestobeoperatedforwatercleaningandentertheoperatingprocedureintheplan.

Enterthewaterflowdirection

Forvalvesandinstrumentsinstalledinthepipingtobecleaned,plantheirhandlinginaccordancewithpre-commissioningprocedureandspecificjobspecification.

Cleanbranchpipesaftercleaningmainpipes.

Markthedrainpointsandenterthenumbersshowingthedrainingorder.

Wherethedrainpointinvolvesthepossibilityofcausingdamagetootherparts,drainwatertoadrainageditch,throughtemporarypiping.

Checktoseeifthedrainageditchintheplantcancovercleaninganddrainingrequirements,andifnecessary,investigateaplanfordrainingwateroffdependingonitsquantity

6.2Waterflushingbyoperatingapermanentpump

Theplanforcleaningpipingwithwaterbyoperatingapermanentpumpshouldbepreparedinthefollowingway:

Ensurethatdemiwaterisavailableatnear