1.Object
Thisdocumentintendstodescribealltheinspectionworksrelatedtosolarpanelqualitycontrolservices
2.Scope
Thisdocumentappliestotheinspectionofcrystallinesiliconterrestrialphotovoltaic(PV)modulesforlong-termoperationingeneralopen-airclimates.
2.1Typeofpanel
Polycrystalline
Monocrystalline
Amorph
3.Relevantstandards
2005
Photovoltaic(PV)modules–Designqualificationandtypeapproval
2004
Photovoltaic(PV)modulesafetyqualification
2007
Concentratorphotovoltaic(CPV)modulesandassemblies–Designqualificationandtypeapproval
2001
Recommendedpracticeforqualificationofconcentratorphotovoltaic(PV)receivesectionsandmodules
Flat-platephotovoltaicmodulesandpanels
4.Testpoints
4.1Certificationtest:
Test
Title
Testconditions
4.1.1
Visualinspection
SeeDetailinspectionlistin6.4
4.1.2
Maximumpowerdetermination
Sinceasolarcellhasawavelength-dependentresponse,itsperformanceissignificantlyaffectedbythespectraldistributionoftheincidentradiation,whichinnaturalsunlightvarieswithseveralfactorssuchaslocation,weather,timeofyear,timeofday,orientationofthereceivingsurface,etc.,andwithasimulatorvarieswithitstypeandconditionsofuse.Iftheirradianceismeasuredeitherwithathermopile-typeradiometer(thatisnotspectrallyselective)orwithareferencesolarcell,thespectralirradiancedistributionoftheincominglightmustbeknowninordertomakethenecessarycorrectionstoobtaintheperformanceofthePVdeviceunderthereferencesolarspectraldistributiondefinedinthisstandardasspecified.Itisalsopossibleforauserorarraydesigner,usingthespectralresponseofthecells,tocomputewithinareasonabletolerancetheperformanceofaPVdevicewhenexposedtolightofanyotherknownspectralirradiancedistribution.
4.1.3
Insulationtest
Dielectricwithstandat1000Vd.c.+twicethemaximumsystemsvoltagefor1min.
Formoduleswithanareaoflessthan0.1m2theinsulationresistanceshallbenotlessthan400MΩ.Formoduleswithanarealargerthan0.1m2,themeasuredinsulationresistancetimestheareaofthemoduleshallbenotlessthan40MΩ·
m2measuredat500Vormaximumsystemsvoltage,whicheverisgreater.
4.1.4
Measurementoftemperaturecoefficients
DetailsseeIEC61215
Determinethetemperaturecoefficientsofcurrent(α),voltage(β)andpeakpower(γ)frommodulemeasurementsasspecified.Thecoefficientssodeterminedarevalidattheirradianceatwhichthemeasurementsweremade.Seeevaluationofmoduletemperaturecoefficientsatdifferentirradiancelevels.Forlinearmodules,theyarealsovalidoveranirradiancerangeof±
30%ofthislevel.
4.1.5
Measurementofnominaloperatingcelltemperature(NOCT)
Totalsolarirradiance800Wm-2
Ambienttemperature:
20℃
Windseep:
1m·
s-1
4.1.6
PerformanceatSTCandNOCT
Celltemperature:
25℃andNOCT
Irradiance:
1000and800W·
m-2withIEC60904-3referencesolarspectralirradiancedistributions
4.1.7
Performanceatlowirradiance
25℃
Irradiance:
200W·
m-2withIEC60904-3referencesolarspectralirradiancedistribution
4.1.8
Outdoorexposuretest
60kWh·
m-2totalsolarirradiance
4.1.9
Hot-spotendurancetest
Five-hourexposureto1000W·
m-2irradianceinworst-casehot-spotcondition
4.1.10
UVpreconditioningtest
15kWh·
m-2totalUVirradiationinthewavelengthrangefrom280nmto385nmwith5kWh·
m-2UVirradiationinthewavelengthrangefrom280nmto385nm
4.1.11
Thermalcyclingtest
50to200cyclesfrom-40℃to+85℃withSTCpeakpowercurrentduring200cycles
4.1.12
Humidity-freezetest
10cyclesfrom+85℃,85%RHto-40℃
4.1.13
Damp-heattest
1000hat++85℃,85%RH
4.1.14
Robustnessofterminationstest
SeedetailsinIEC60068-2-21
4.1.15
Wetleakagecurrenttest
Formoduleswithanareaoflessthan0.1m2theinsulationresistanceshallbenotlessthan400MΩ.Formoduleswithanarealargerthan0.1m2themeasureinsulationresistancetimestheareaofmoduleshallbenotless40MΩ·
m2tobemeasuredat500Vormaximumsystemvoltage,whicheverisgreater
4.1.16
Mechanicalloadtest
3cyclesof2400Pauniformload,appliedfor1htofrontandbacksurfacesinturn.
Optionalsnowloadof5400Paduringlastfrontcycle
4.1.17
Hailtest
25mmdiametericeballat23m·
s-1,directedat11impactlocations
4.1.18
Bypassdiodethermaltest
OnehoureatISCand75℃
Onehourat1.25timesISCand75℃
4.2.1Visualinspection
Purpose:
Detectanyvisualdefectsinthemodule.
Majorvisualdefects:
1.Verifyingalltheelementsandtheinstallation
2.Broken,cracked,ortornexternalsurfaces,includingsuperstrates,framesandjunctionboxes
3.Bentormisalignedexternalsurfaces,includingsuperstrates,substrates,framesandjunctionboxestotheextentthattheinstallationand/oroperationofthemodulewouldbeimpaired
4.Acrackinacellthepropagationofwhichcouldremovemorethan10%ofthatcell’sareafromtheelectricalcircuitofthemodule
5.Bubblesordelaminationsformingacontinuouspathbetweenanypartoftheelectricalcircuitandtheedgeofthemodule
6.Lossofmechanicalintegrity,totheextentthattheinstallationand/oroperationofthemodulewouldbeimpaired.
4.2.2Flashtest
ToconfirmthePVpanel’sreliabilityandtheveracityoftheflashdatareportgivenbyfromthefactory.
Equipment:
1.Aradiantsourcemachine(naturalsunlightorasolarsimulatorclassBorbettercalibratedinaccordancewithIEC60904-9)
2.APVreferencemodule(calibratedinaccordancewithIEC60904-2orIEC60904-6)
3.Atemperaturedetector(calibratedbylocallab)whichanaccuracyof±
1℃andrepeatabilityof±
0.5℃
4.2.3ELtest
Detectanyinvisibledefectsinthemodule,testspeciallyaimedtodetecthiddencracksinthesiliconcells
ELRXmachine
5.Inspectionprocedure
6.1Inspectionsteps
No.
Inspectionitems
Comments
Picture
1
Checktheflashreport
Flashreportisatestreportgivenbyfactory
2
Checkpackingsolution
Confirmthepackingsolutionisaccordingtothespecificationandingoodcondition
3
Sampling
Selectthequantityofinspectionproduct
4
Detectanyvisualdefectsinthemodule
5
Dimensioninspection
Confirmthemoduleisaccordingtothespecification
6
ELinspection
Detectanyinvisibledefectsinthemodule
7
Powerinspection
Powerinspectionistakenbyaflashequipmentandshowstheperformanceofproduct
8
Loadingsupervising
Insuretheproductproperlystoredbeforeshipping
9
Inspectionpictures
Therecordsandthetraceabilityofinspectionwork
10
Recordunqualifiedmodulesnumber
Rejectproductcontrol
6.2Sampling
AccordingtoAQL(AcceptanceQualityLimit)&
standardofcontact&
clientagreementsrandomlytakesamplesfromeachpath.
6.3AcceptCriteria
AccordingtoAQL&
clientrequirements
6.4Visualinspection:
Procedure
Carefullyinspecteachmoduleunderanilluminationofnotlessthan1000luxforthefollowingconditions:
a)Cracked,bent,misalignedortornexternalsurfaces
b)Brokencells
c)Crackedcells
d)Faultyinterconnectionsorjoints
e)Cellstouchingoneanotherortheframe
f)Failureofadhesivebonds
g)Bubblesordelaminationsformingacontinuouspathbetweenacellandtheedgeofthemodule
h)Tackysurfacesofplasticmaterials
i)Faultyterminations,exposedliveelectricalparts
j)Anyotherconditionswhichmayaffectperformance
Basicrequirements(Detailrequirementaccordingthecontactandclientagreements)
Description
1.
Chippedcell(Nomorethantwo
(2)chippedcellspermodule)
2.
Chippedcell(Max.Totalmissedsurface≤0.5cm2)
3.
Cellimpurities(Foreignconductingparticles;
Area≤4mm²
allowed)
4.
Cellimpurities(Foreignnon-conductingparticles;
Area≤10mmdia.allowed)
Bubbles(Area≤5cm²
allowedper.sq.meterofmodule)
Gapbetweencells(AdjustedinStringingmachine)
Gapbetweencells(Gap≥1.0mm)
Ribbonmisalignment(≤1mmallowed)
Ribbonmisalignment(Theribbonsoneachcellarenotallowedtotoucheachother,andconnectionshouldnotbeclosertothecelledgethanthelastgridline)
Brokencells(Notadmitted)
11
Crackedcells(Notadmitted)
12
Spacebetweencellsandframeedge(Celltoframe≥8±
4mm/Notacceptediflessthan4mm)
13
Scratchesonglass(Noseriousscratchesordamagedglassallowed)
14
Scratchesonglass(Length>
60mm,width>
0.1mm,notallowed)
15
Scratchesonglass(Length<
=60mm,width<
=0.1mm,only1persquaremeterisallowed)
16
Ribbons(Brokenleadsnotadmitted)
17
Label(Missingbarcode)
18
Label(frontlabelCoveringcell)
19
Framescratches(Scratchlongerthan30mmisnotallowed)
20
Frameassembly(FramecornerGaponfrontside;
Gap≥1mmnotallowed.)
21
Framedimensions(Accordingtomoduledatasheet)
22
Frameadhesivetape(Remainsafterpropercuttingwithknifeallowed.)