PreshipmentInspection of solar panelWord格式文档下载.docx

《PreshipmentInspection of solar panelWord格式文档下载.docx》由会员分享,可在线阅读,更多相关《PreshipmentInspection of solar panelWord格式文档下载.docx(21页珍藏版)》请在冰豆网上搜索。

PreshipmentInspection of solar panelWord格式文档下载.docx

5.1Inspectionsteps6

5.2Sampling7

5.3AcceptCriteria7

5.4Visualinspection:

7

5.5Flashinspection13

5.6ELinspection14

6.Loading15

6.1Checklists16

6.2Loadingprocedure16

 

1.Object

Thisdocumentintendstodescribealltheinspectionworksrelatedtosolarpanelqualitycontrolservices

2.Scope

Thisdocumentappliestotheinspectionofcrystallinesiliconterrestrialphotovoltaic(PV)modulesforlong-termoperationingeneralopen-airclimates.

2.1Typeofpanel

Polycrystalline

Monocrystalline

Amorph

3.Relevantstandards

2005

Photovoltaic(PV)modules–Designqualificationandtypeapproval

2004

Photovoltaic(PV)modulesafetyqualification

2007

Concentratorphotovoltaic(CPV)modulesandassemblies–Designqualificationandtypeapproval

2001

Recommendedpracticeforqualificationofconcentratorphotovoltaic(PV)receivesectionsandmodules

Flat-platephotovoltaicmodulesandpanels

4.Testpoints

4.1Certificationtest:

Test

Title

Testconditions

4.1.1

Visualinspection

SeeDetailinspectionlistin6.4

4.1.2

Maximumpowerdetermination

Sinceasolarcellhasawavelength-dependentresponse,itsperformanceissignificantlyaffectedbythespectraldistributionoftheincidentradiation,whichinnaturalsunlightvarieswithseveralfactorssuchaslocation,weather,timeofyear,timeofday,orientationofthereceivingsurface,etc.,andwithasimulatorvarieswithitstypeandconditionsofuse.Iftheirradianceismeasuredeitherwithathermopile-typeradiometer(thatisnotspectrallyselective)orwithareferencesolarcell,thespectralirradiancedistributionoftheincominglightmustbeknowninordertomakethenecessarycorrectionstoobtaintheperformanceofthePVdeviceunderthereferencesolarspectraldistributiondefinedinthisstandardasspecified.Itisalsopossibleforauserorarraydesigner,usingthespectralresponseofthecells,tocomputewithinareasonabletolerancetheperformanceofaPVdevicewhenexposedtolightofanyotherknownspectralirradiancedistribution.

4.1.3

Insulationtest

Dielectricwithstandat1000Vd.c.+twicethemaximumsystemsvoltagefor1min.

Formoduleswithanareaoflessthan0.1m2theinsulationresistanceshallbenotlessthan400MΩ.Formoduleswithanarealargerthan0.1m2,themeasuredinsulationresistancetimestheareaofthemoduleshallbenotlessthan40MΩ·

m2measuredat500Vormaximumsystemsvoltage,whicheverisgreater.

4.1.4

Measurementoftemperaturecoefficients

DetailsseeIEC61215

Determinethetemperaturecoefficientsofcurrent(α),voltage(β)andpeakpower(γ)frommodulemeasurementsasspecified.Thecoefficientssodeterminedarevalidattheirradianceatwhichthemeasurementsweremade.Seeevaluationofmoduletemperaturecoefficientsatdifferentirradiancelevels.Forlinearmodules,theyarealsovalidoveranirradiancerangeof±

30%ofthislevel.

4.1.5

Measurementofnominaloperatingcelltemperature(NOCT)

Totalsolarirradiance800Wm-2

Ambienttemperature:

20℃

Windseep:

1m·

s-1

4.1.6

PerformanceatSTCandNOCT

Celltemperature:

25℃andNOCT

Irradiance:

1000and800W·

m-2withIEC60904-3referencesolarspectralirradiancedistributions

4.1.7

Performanceatlowirradiance

25℃

Irradiance:

200W·

m-2withIEC60904-3referencesolarspectralirradiancedistribution

4.1.8

Outdoorexposuretest

60kWh·

m-2totalsolarirradiance

4.1.9

Hot-spotendurancetest

Five-hourexposureto1000W·

m-2irradianceinworst-casehot-spotcondition

4.1.10

UVpreconditioningtest

15kWh·

m-2totalUVirradiationinthewavelengthrangefrom280nmto385nmwith5kWh·

m-2UVirradiationinthewavelengthrangefrom280nmto385nm

4.1.11

Thermalcyclingtest

50to200cyclesfrom-40℃to+85℃withSTCpeakpowercurrentduring200cycles

4.1.12

Humidity-freezetest

10cyclesfrom+85℃,85%RHto-40℃

4.1.13

Damp-heattest

1000hat++85℃,85%RH

4.1.14

Robustnessofterminationstest

SeedetailsinIEC60068-2-21

4.1.15

Wetleakagecurrenttest

Formoduleswithanareaoflessthan0.1m2theinsulationresistanceshallbenotlessthan400MΩ.Formoduleswithanarealargerthan0.1m2themeasureinsulationresistancetimestheareaofmoduleshallbenotless40MΩ·

m2tobemeasuredat500Vormaximumsystemvoltage,whicheverisgreater

4.1.16

Mechanicalloadtest

3cyclesof2400Pauniformload,appliedfor1htofrontandbacksurfacesinturn.

Optionalsnowloadof5400Paduringlastfrontcycle

4.1.17

Hailtest

25mmdiametericeballat23m·

s-1,directedat11impactlocations

4.1.18

Bypassdiodethermaltest

OnehoureatISCand75℃

Onehourat1.25timesISCand75℃

4.2.1Visualinspection

Purpose:

Detectanyvisualdefectsinthemodule.

Majorvisualdefects:

1.Verifyingalltheelementsandtheinstallation

2.Broken,cracked,ortornexternalsurfaces,includingsuperstrates,framesandjunctionboxes

3.Bentormisalignedexternalsurfaces,includingsuperstrates,substrates,framesandjunctionboxestotheextentthattheinstallationand/oroperationofthemodulewouldbeimpaired

4.Acrackinacellthepropagationofwhichcouldremovemorethan10%ofthatcell’sareafromtheelectricalcircuitofthemodule

5.Bubblesordelaminationsformingacontinuouspathbetweenanypartoftheelectricalcircuitandtheedgeofthemodule

6.Lossofmechanicalintegrity,totheextentthattheinstallationand/oroperationofthemodulewouldbeimpaired.

4.2.2Flashtest

ToconfirmthePVpanel’sreliabilityandtheveracityoftheflashdatareportgivenbyfromthefactory.

Equipment:

1.Aradiantsourcemachine(naturalsunlightorasolarsimulatorclassBorbettercalibratedinaccordancewithIEC60904-9)

2.APVreferencemodule(calibratedinaccordancewithIEC60904-2orIEC60904-6)

3.Atemperaturedetector(calibratedbylocallab)whichanaccuracyof±

1℃andrepeatabilityof±

0.5℃

4.2.3ELtest

Detectanyinvisibledefectsinthemodule,testspeciallyaimedtodetecthiddencracksinthesiliconcells

ELRXmachine

5.Inspectionprocedure

6.1Inspectionsteps

No.

Inspectionitems

Comments

Picture

1

Checktheflashreport

Flashreportisatestreportgivenbyfactory

2

Checkpackingsolution

Confirmthepackingsolutionisaccordingtothespecificationandingoodcondition

3

Sampling

Selectthequantityofinspectionproduct

4

Detectanyvisualdefectsinthemodule

5

Dimensioninspection

Confirmthemoduleisaccordingtothespecification

6

ELinspection

Detectanyinvisibledefectsinthemodule

7

Powerinspection

Powerinspectionistakenbyaflashequipmentandshowstheperformanceofproduct

8

Loadingsupervising

Insuretheproductproperlystoredbeforeshipping

9

Inspectionpictures

Therecordsandthetraceabilityofinspectionwork

10

Recordunqualifiedmodulesnumber

Rejectproductcontrol

6.2Sampling

AccordingtoAQL(AcceptanceQualityLimit)&

standardofcontact&

clientagreementsrandomlytakesamplesfromeachpath.

6.3AcceptCriteria

AccordingtoAQL&

clientrequirements

6.4Visualinspection:

Procedure

Carefullyinspecteachmoduleunderanilluminationofnotlessthan1000luxforthefollowingconditions:

a)Cracked,bent,misalignedortornexternalsurfaces

b)Brokencells

c)Crackedcells

d)Faultyinterconnectionsorjoints

e)Cellstouchingoneanotherortheframe

f)Failureofadhesivebonds

g)Bubblesordelaminationsformingacontinuouspathbetweenacellandtheedgeofthemodule

h)Tackysurfacesofplasticmaterials

i)Faultyterminations,exposedliveelectricalparts

j)Anyotherconditionswhichmayaffectperformance

Basicrequirements(Detailrequirementaccordingthecontactandclientagreements)

Description

1.

Chippedcell(Nomorethantwo

(2)chippedcellspermodule)

2.

Chippedcell(Max.Totalmissedsurface≤0.5cm2)

3.

Cellimpurities(Foreignconductingparticles;

Area≤4mm²

allowed)

4.

Cellimpurities(Foreignnon-conductingparticles;

Area≤10mmdia.allowed)

Bubbles(Area≤5cm²

allowedper.sq.meterofmodule)

Gapbetweencells(AdjustedinStringingmachine)

Gapbetweencells(Gap≥1.0mm)

Ribbonmisalignment(≤1mmallowed)

Ribbonmisalignment(Theribbonsoneachcellarenotallowedtotoucheachother,andconnectionshouldnotbeclosertothecelledgethanthelastgridline)

Brokencells(Notadmitted)

11

Crackedcells(Notadmitted)

12

Spacebetweencellsandframeedge(Celltoframe≥8±

4mm/Notacceptediflessthan4mm)

13

Scratchesonglass(Noseriousscratchesordamagedglassallowed)

14

Scratchesonglass(Length>

60mm,width>

0.1mm,notallowed)

15

Scratchesonglass(Length<

=60mm,width<

=0.1mm,only1persquaremeterisallowed)

16

Ribbons(Brokenleadsnotadmitted)

17

Label(Missingbarcode)

18

Label(frontlabelCoveringcell)

19

Framescratches(Scratchlongerthan30mmisnotallowed)

20

Frameassembly(FramecornerGaponfrontside;

Gap≥1mmnotallowed.)

21

Framedimensions(Accordingtomoduledatasheet)

22

Frameadhesivetape(Remainsafterpropercuttingwithknifeallowed.)

B