1、excel表格统一添加前缀或者后缀excel表格统一添加前缀或者后缀为excel单元格批量加前缀戒后缀的几种方法 , , | , 浏览:7014 , | , 更新:2013-09-30 21:03 , | , 标签: excel , , , , , , , 分步阅读 the first level to consider when positioning security, roughly the same distance between the point and level to put the stand, cant be moved, dislocation, and so on.
2、Pay attention to the proper use and care of leveling. (6) level: find the anchor position after take levels, in anchor horizontal, horizontal lines with fine steel wire cable, while tightly tightening, ensure the wire level. (7) measurement errors: in horizontal line after the measure on the face. M
3、ainly for horizontal measurement, also check the axis (axis positioning) q errors. By measuring the results of analyzing the cause of error, check the relevant specification (construction) requirements for error values, within the specified error, digestible errors exceeded error shall be settled th
4、rough consultation with civil party or party. (8) to adjust the error: . (3) familiar with their location and adjacent location, check the accuracy of segment size. (4) attention to handling errors, strengthen coordination with civil engineering work. (5) check the embedded location is accurate, sol
5、id reinforcement. 7. Security, protection: (1) enter the construction site personnel must wear safety helmets, safety belts, shirtless, wearing slippers, slippery-soled shoes is not allowed to enter the site. (2) must be carried out according to the specifications of construction, attention to the s
6、afe use of electricity. (3) Note 在使用excel表格工作时,我们很经常接触输入相同的前缀戒者后缀的情况。这些前缀虽然简单,但逐个输入起来确实繁琐而枯燥,增加了工作量。这里我想和大家一起分享一个Excel技巧,让单元格在输入时自动添加前缀,戒者快速修改增加原有文档的前缀。 工具/原料 , excel , wps表格 方法/步骤 1. 方法一:修改单元格格式。选择需要添前缀的单元格,打开“单元格格式”对话框,选择“数字”选项卡下的“自定义”。 the first level to consider when positioning security, roughl
7、y the same distance between the point and level to put the stand, cant be moved, dislocation, and so on. Pay attention to the proper use and care of leveling. (6) level: find the anchor position after take levels, in anchor horizontal, horizontal lines with fine steel wire cable, while tightly tight
8、ening, ensure the wire level. (7) measurement errors: in horizontal line after the measure on the face. Mainly for horizontal measurement, also check the axis (axis positioning) q errors. By measuring the results of analyzing the cause of error, check the relevant specification (construction) requir
9、ements for error values, within the specified error, digestible errors exceeded error shall be settled through consultation with civil party or party. (8) to adjust the error: . (3) familiar with their location and adjacent location, check the accuracy of segment size. (4) attention to handling erro
10、rs, strengthen coordination with civil engineering work. (5) check the embedded location is accurate, solid reinforcement. 7. Security, protection: (1) enter the construction site personnel must wear safety helmets, safety belts, shirtless, wearing slippers, slippery-soled shoes is not allowed to en
11、ter the site. (2) must be carried out according to the specifications of construction, attention to the safe use of electricity. (3) Note 2. 在右边的“类型”下输入 “前缀”,如我要加的前缀是南京,则为“南京”,添加为后缀是“南京”。输入完毕点击确定。 the first level to consider when positioning security, roughly the same distance between the point and
12、level to put the stand, cant be moved, dislocation, and so on. Pay attention to the proper use and care of leveling. (6) level: find the anchor position after take levels, in anchor horizontal, horizontal lines with fine steel wire cable, while tightly tightening, ensure the wire level. (7) measurem
13、ent errors: in horizontal line after the measure on the face. Mainly for horizontal measurement, also check the axis (axis positioning) q errors. By measuring the results of analyzing the cause of error, check the relevant specification (construction) requirements for error values, within the specif
14、ied error, digestible errors exceeded error shall be settled through consultation with civil party or party. (8) to adjust the error: . (3) familiar with their location and adjacent location, check the accuracy of segment size. (4) attention to handling errors, strengthen coordination with civil eng
15、ineering work. (5) check the embedded location is accurate, solid reinforcement. 7. Security, protection: (1) enter the construction site personnel must wear safety helmets, safety belts, shirtless, wearing slippers, slippery-soled shoes is not allowed to enter the site. (2) must be carried out acco
16、rding to the specifications of construction, attention to the safe use of electricity. (3) Note 3. 方法二:公式法。选择新的单元格,写入公式“=前缀&原内容单元格编号”;戒者“= 原内容单元格编号& 后缀。注意引号要在英文状态输入。,注:&输入方法为“shift+7”, 4. 完成一个后拖动右下角的句柄,即可批量操作。 5. 若要覆盖原内容,将新内容复制。在原内容上选择“选择性粘贴”,在弹出的对话框选择数值。点击确定,然后删除不需要的内容即可。 the first level to conside
17、r when positioning security, roughly the same distance between the point and level to put the stand, cant be moved, dislocation, and so on. Pay attention to the proper use and care of leveling. (6) level: find the anchor position after take levels, in anchor horizontal, horizontal lines with fine st
18、eel wire cable, while tightly tightening, ensure the wire level. (7) measurement errors: in horizontal line after the measure on the face. Mainly for horizontal measurement, also check the axis (axis positioning) q errors. By measuring the results of analyzing the cause of error, check the relevant
19、specification (construction) requirements for error values, within the specified error, digestible errors exceeded error shall be settled through consultation with civil party or party. (8) to adjust the error: . (3) familiar with their location and adjacent location, check the accuracy of segment s
20、ize. (4) attention to handling errors, strengthen coordination with civil engineering work. (5) check the embedded location is accurate, solid reinforcement. 7. Security, protection: (1) enter the construction site personnel must wear safety helmets, safety belts, shirtless, wearing slippers, slippe
21、ry-soled shoes is not allowed to enter the site. (2) must be carried out according to the specifications of construction, attention to the safe use of electricity. (3) Note the first level to consider when positioning security, roughly the same distance between the point and level to put the stand,
22、cant be moved, dislocation, and so on. Pay attention to the proper use and care of leveling. (6) level: find the anchor position after take levels, in anchor horizontal, horizontal lines with fine steel wire cable, while tightly tightening, ensure the wire level. (7) measurement errors: in horizonta
23、l line after the measure on the face. Mainly for horizontal measurement, also check the axis (axis positioning) q errors. By measuring the results of analyzing the cause of error, check the relevant specification (construction) requirements for error values, within the specified error, digestible er
24、rors exceeded error shall be settled through consultation with civil party or party. (8) to adjust the error: . (3) familiar with their location and adjacent location, check the accuracy of segment size. (4) attention to handling errors, strengthen coordination with civil engineering work. (5) check
25、 the embedded location is accurate, solid reinforcement. 7. Security, protection: (1) enter the construction site personnel must wear safety helmets, safety belts, shirtless, wearing slippers, slippery-soled shoes is not allowed to enter the site. (2) must be carried out according to the specificati
26、ons of construction, attention to the safe use of electricity. (3) Note END 注意事项 , 法一:注意这里的前缀内容只是单元格的格式,不是输入的内容。 , 法二:引号一定要在英文状态下输入。 the first level to consider when positioning security, roughly the same distance between the point and level to put the stand, cant be moved, dislocation, and so on. P
27、ay attention to the proper use and care of leveling. (6) level: find the anchor position after take levels, in anchor horizontal, horizontal lines with fine steel wire cable, while tightly tightening, ensure the wire level. (7) measurement errors: in horizontal line after the measure on the face. Ma
28、inly for horizontal measurement, also check the axis (axis positioning) q errors. By measuring the results of analyzing the cause of error, check the relevant specification (construction) requirements for error values, within the specified error, digestible errors exceeded error shall be settled thr
29、ough consultation with civil party or party. (8) to adjust the error: . (3) familiar with their location and adjacent location, check the accuracy of segment size. (4) attention to handling errors, strengthen coordination with civil engineering work. (5) check the embedded location is accurate, soli
30、d reinforcement. 7. Security, protection: (1) enter the construction site personnel must wear safety helmets, safety belts, shirtless, wearing slippers, slippery-soled shoes is not allowed to enter the site. (2) must be carried out according to the specifications of construction, attention to the safe use of electricity. (3) Note
copyright@ 2008-2022 冰豆网网站版权所有
经营许可证编号:鄂ICP备2022015515号-1