1、Delegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Asse
2、mbly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the partys 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve,
3、smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.8
4、15 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. -Security measures: unplanned outages 2.5 times. No pe
5、rsonal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207
6、 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. -Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions perfo
7、rmance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. -Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduc
8、tion over the same period a year earlier. Major achievements: first, we should adhere to the two management system basis, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two management system for improvement. F
9、ocus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management networ
10、k role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supervis
11、ion of production safety and the Olympic Games and other312工程48号建筑物钢结构吊装方案施工单位: 山西建筑工程(集团)总公司编制日期:2011年10月06号目 录1. 编制说明32. 编制依据33. 工程概况34. 施工准备45. 主要工序和施工方法46. 主要施工工具157.主要技术措施材料 158.施工进度计划及劳动力组织169.安全保证体系1710. 安全保证措施 1811. 质量保证措施2212.施工进度保证措施2313. 季节性施工措施2414钢结构施工应急预案291. 编制说明 本方案为屋架制作、焊接、涂装、吊装施工专项
12、方案,本方案对钢屋架等构件的吊装提出的要求具体施工步骤,施工中须遵守执行。本施工方案编制的目的是:用以指导工程施工与管理,确保优质、高效、安全、文明地完成该工程的建设任务。2. 编制依据 2.1 建筑工程施工质量验收统一标准(GB50300-2001); 2.2 钢结构工程施工质量验收规范(GB50205-2001;)2.3 轻型屋面梯形钢屋架(圆钢管、方钢管)(06SG515-1);2.4 建筑钢结构焊接技术规程(JGJ81-2002);2.5 冷弯薄壁型钢结构技术规范(GB50018-2002);2.6 碳钢焊条(GB/T5117-95);2.7 建筑施工手册(第四版,建工出版社);2.8
13、 业主提供的施工蓝图。3. 工程概况 该工程位于怀柔桥梓镇,东西边界轴线长126m,南北边界轴线长24m,建筑总面积3199.14m2。工程为全预制混凝土排架结构,主体一层高约19 m。屋面为角钢梯形钢屋架、钢骨架轻型屋面板结构,钢屋架跨度为24.00米,总共23榀屋架组装,屋面面积3024m2。建筑物耐火等级二级,抗震设防烈度为7度,建筑物耐久年限为50年。梯形钢屋架设计参数:钢屋架:跨度24m,双坡屋面。檐高18.55m,脊高(峰)2.85m,材料为Q235-B角钢焊接制造,约3.5吨/榀,总重共计约为80.5t榀。4. 施工准备4.1 组织有关工程管理和技术人员熟悉设计图纸。4.2 根据
14、施工图纸及设备和技术条件,提出材料计划。4.3 对钢结构工程所使用的机械和辅助设备的性能进行检验,保证施工过程中各种设备的工作状态良好,使用功能齐全。4.4 钢结构工程所使用的材料应有质量证明书,符合标准后方可使用。4.5 在钢屋架工程施工前,应对各工序的施工人员进行必要的岗位培训,并对其进行技术、质量、安全交底,预防发生安全和质量事故。4.6 钢屋架制作好后应按安装顺序堆放在支撑上。所垫支撑应有足够的支承面,应防止支点下沉及过重、过高堆积。4.7 准备好必须的施工机具,且运行良好。4.8 各构件在吊装前应认真检查,并对各部位尺寸进行核对。钢构件应完成防腐工作。4.9 现场吊装前,应在柱顶埋件上(檩托板预埋)弹好十字线,同时将标高控制点设置好。现场场地应平整夯实,没有积水,并且要预留车道。5. 主要工序及施工方法5.1 钢屋架的制作5.1.1材质控制1)钢屋架支座连接用地脚螺栓为M24,所采用的连接螺栓为普通螺栓,安装定位螺栓采用M16,材质级别为Q235-B级钢。2)向正规生产厂家订购钢材、焊材。而且必须具备原始材质证明(物理性能、化学成份)及出厂合格证。3)钢材进场后按规定检查合格后才能投入使用。 4)钢材进场前由质安部门对其表面状态(锈、麻坑等缺陷)按规范标准严格把关,凡超标者不得投入使用。5)焊材在使用前按规范进行烘焙处理。5.1.2工艺过程: 加工准备及下料零件加工