1、5月6月7月8月9月10月月11月12月3.60.810.017.522.629.726.923.215.210.33.4-111.91.56.117.321.327.324.512.811.33.80.30.63.26.616.621.626.529.214.97.01.62.410.417.121.128.027.524.217.212.26.00.15.510.914.718.727.822.812.13.52.80.911.914.318.628.529.816.812.05.623.911.415.726.230.223.516.211.56.42.34.79.417.621.927
2、.220.04.15.72.69.110.721.529.420.217.012.710.214.821.428.422.114.29.98.912.325.427.125.818.413.14.09.510.813.527.025.023.418.211.8132.12.913.026.720.524.421.08.3142.712.422.226.414.45.18.0157.91.86.315.113.823.625.910.55.31610.119.016.921.727.624.119.24.61718.06.815.517.825.219.6185.25.48.128.829.02
3、0.8191.74.816.319.713.7200.46.520.124.018.12.22111.619.530.822.014.64.52210.624.331.423.819.99.35.86.9237.411.717.918.929.622.420.36.22421.220.99.85.02513.626.622.32615.426.030.328.123.77.63.1273.314.025.17.2281.315.326.18.52931.89.625.526.329.59.2311.1B:气温与施工的关系(表5)项目冬季施工措施夏季施工措施土方填筑间断建筑时 0 (日平均)连续
4、填筑时 5 (日平均)日平均气温 30日最低气温 -3拆模时间 (单位:天)(表6)混凝土强度水泥种类温度()25%400# 普通水泥2.52.01.0500# 普通水泥400# 火山灰水泥50%70%32D:混凝土初凝时间(表7)初凝时间(小时)(3)平湖历年最高水位:一般在20.00米,但施工期间可通过放水将运河水位保持在17.00米左右。(二) 施工条件1 交通运输: 在拟建的拦河坝上游处有一座简易码头,并有简易公路通县城。2 建筑材料运输建议路径:水泥、钢材由县城经公路运来;木材由水路运达简易码头,运距50公里;石料由水路运达简易码头,运距20公里;砂由采砂场水路达简易码头,运距38公
5、里;闸门构件在位于县城城区的工厂制造后经公路运达工地拼装;其它物资由南面县城运来。3 劳动力供应:所需一般民工和掌握一定技术的技工均可充分保证。4 水电资源:工地附近有高压输电线路经过,可在工地修建变电站降压后向工地供电。运河水水质良好可经简单处理后供饮用和施工用水。5 工程期限:上级规定船闸工程于X年三月动工,次年元月完工,为期计11个月。6 施工机械设备:负责施工的工程队有下列设备可供选择:(1)W100正向式挖土机三台;(2)CT6拖带式铲运机二台;(3)T100推土机四辆;(4)解放CA340自卸汽车和黄河QD351自卸汽车,3.5T,8T自卸汽车各6辆;(5)J1800拌和机4台;(
6、6)HZ6P70A震捣器10台;(7)W100履带式起重机和W200履带式起重机各2台;(8)QT6塔式起重机1台;(9)T4510皮带输送机;(10)井式升降塔3台;(11)6JD36和6JD56深井泵各12台;(12)4B20和B20离心泵各12台;(13)井点设备2套;(14)斗车10辆、手推车20辆;(15)3T卷扬机4台。以上机械设备开工前均检修完毕,集中于该工程队常驻地(船闸南面约20公里处的县城),并处于完好待命状态。必要时可以考虑向机械租赁公司租借常规土木建筑施工机械。三、主要工程量计算1. 土方开挖工程(含引航道);(1) 确定开挖线。根据边坡比例,等高线及航道尺寸确定开挖线
7、。取开挖增宽两边各为5m,开挖坡度1:2。(2) 根据地形变化,整个船闸选取20个断面分段进行概算,其中上引航道5段,下引航道5段,上下导航道各2段,闸室4段,闸室各自分别计算。详见图4。根据这些典型断面,分段求出船闸土方开挖量。(详细过程见表八) 图4 船闸工程量计算分断图2. 混凝土工程量根据混凝土断面面积大致估算混凝土用量。3. 粘土铺盖工程量跟混凝土一样,根据回填的断面积大致估算。4. 引航道浆砌块石工程量同样的,浆砌石也是由船闸的断面尺寸大致估算。5. 土方回填工程量土方回填计算与开挖计算相似。1) 确定回填面,按1:2.5坡度回填,同时回填面预留5米作为机械通道或人行道。2) 整个
8、船闸分段计算回填量,取典型断面作回填断面图,详见图5,计算回填量。(详细过程见表十二) 图5 各典型断面回填断面图6. 护坡采用草皮护坡方式。附:计算表一 工程量计算表表八 挖方量计算左截面面积计算表右截面面积计算表土方量计算表左截面高度左截面下底计算宽度左截面上底计算宽度左截面面积F1右截面下底计算宽度右截面高度右截面上底计算宽度右截面面积F1长度土方量总方量上引航道6310588210.25104855.87596.9166784214.53246147.49.75102804.37534.6666728777.67100.2758.8847.537127.31102.2809.48806
9、2734.49.85102.4814.5954133293.54上导航段9.5568.2468.905402567031412.1379.6679.525742.125上闸首4291.6828.3290.8810.0820.0833316452.27闸室段8.262.8380.487.7561352.62561.3333322481.8975819.2160.4343.5243.6666715199.176236814586.166423552下闸首9079211.7589769.62515616.25下导航段77628.6258.764.8412.385205.02521445.538.49
10、6.6670.3216240.5下游引航道8.7598704.37583.3333357278.9620379271.6666752433.397.8699.4871.4166752075.61274.0595.4641.5249.4166722622.21255.1594.6622.5244.1666719381.88总工程量为:610684.8表九 混凝土计算位置截面积长度或宽度混凝土工程量底板侧板210144903987960直线段倾斜段426总工程量31262 表十 浆砌石计算表计算长度浆砌块石工程量上游引航段4830020760下游引航段32022144侧板长度底板厚度上游导航段11
11、9572.52218下游导航段47340表十一 粘土铺盖回填计算长度/宽度/厚度工程量上引航段137.841340左段4951287中段7001820右段34.524.828下引航段4409693306表十二 填方计算填土截面积总填土工程量扣去粘土铺盖后回填总工程量489.7414692.296582.9456.41270123230.7102955.1290132358.9355.3274617.2644.6112892.2617.4812349.6510.465104.615724.8472.769455.25105100总量424152.6330846.6表十三 工程量汇总表工程量汇总工
12、程部位开挖量回填量砌石量混凝土量粘土铺盖量浆砌石块上引航道下引航道闸室3935四、基坑排水设计1)由于地下水位原因,渗流会导致基坑底土体含水量过高,导致土体隆起等不良现象。因此需布置深水井进行排水作业。同时可避免雨水在基坑内留存,影响正常施工。基坑总渗水量统计入下表所示:基坑排水计算表渗流计算按公式 Q=F1q1+ F 2q2计算。段平均高度断面底高程平均高程k平均底面积侧面积Q9.90811.221.1080.009999189005670238.123210.01921.2190.010271154583531.98630.00629684046411.121127.9120.110.00
13、816163003108102.647411.87520.0750.0052884488.5279968.96920.1690.0074180324.20188.52519.7250.005969201604832140.1257556.7335管井数量计算计算段渗流量允许抽水能力抽水能力深水井数井点线总长井间距 总井数m3/h个m上引河段5644.8600100闸室段+闸首段+导航段178.4846 660165下引河段40.1257640注:基坑排水采用深水井,型号为6JD56;抽水能力q取为允许抽水能力的0.8;考虑抽水过程中井管有可能被堵,井数增加10%。2) 设备类型:型 号流 量扬 程H泵管放入井内最大长度最大管径m m6 JD 5632803080125五、施工方法设计先要计算各项工程每月的有效工期。考虑每个月降雨量、温度和节假日的影响综合得出,见下表三月四月五月六月七月八月九月十月十一月腊月正月天数总数240混凝土242221安装1. 土方开挖(1)确定开挖方法,划分开挖区。对上游和下游引航