1、0.24m2=12m3电缆沟抹灰:2+27.7m2+320.40.8=122.1 m2电缆沟C25混凝土:V=4.3m2+4.30.3+4.30.90.2=4m3(注:过公路电缆沟为钢筋混凝土,有模板)0.8m2=6.88m2 03 35kV110 kV开关场基础施工端子箱安装27个700500开挖土石方:V=1m16=11.52 m3650开挖土石方:V=1.2m1m11=11 m3500垫层混凝土:0.15m16个=2.16 m3650垫层混凝土: V=1.2m11个=1.98 m3500砖砌体:V=(0.9m0.12m0.6m2+0.35m216个=3 m3650砖砌体:V=(1.1m2
2、+0.5m2)11个=2.53m3500压顶混凝土: V=(0.9m0.3m16个=1.44 m3650压顶混凝土:11个=1.3 m3 (注:有模板)500抹灰:V1=(0.9m0.7m2+0.7m2+0.9m16个=61m2650抹灰:V1=(1.1m2+0.8m2+1.1m11个=51.2 m2 新增工程量签证单04 110 kV开关场110kV#2主变压器102断路器技改1基土方开挖:V=1.44.31=6.02 m3垫层混凝土:0.2 =1.2m3基础混凝土: V=1.240.8=3.84m3抹灰:S=40.82+1.22+41.2 = 13.12m2拆除混凝土:V=5.20.50.
3、2+1.81.20.2+61.30.2+3.11.10.2+4.51.70.2= 4.7m3碎石回填:110 kV开关场:V=294.20.3+4140.3+160.3 = 68.3m335 kV开关场:V=630.6+71=22.2 m30510kV出线侧10kV出线侧电缆沟改造工程工程量29m(电缆井)V=4291.2 =139.2m39电缆沟V=1.31.2=45.2m3拆除混凝土地板:V=2.50.229=14.5 m3混凝土垫层:电缆沟及电缆井:V=5.329=31m3电缆井上线电缆沟V=1.80.710=3m3砖砌体:电缆井:V=282.71-3.1412110+3.140.621
4、0=55.5m3电缆沟:0.351=9.8m3电缆井出线电缆沟:V=(1.80.6-0.461.80.5)10个=3.42 m3S=282.7-3.1410个+23.140.310个+3.1410= 137.1m2 电缆沟:2+0.3528=65.8m20.63面+0.464面)10个=43.44m20610kV出线侧排水改造工程35m土方开挖:V=0.635=7.7m3垫层混凝土:35=4.2 m3砖砌体: V=0.30.12352+0.30.362= 2.32m3抹灰:S=0.32= 19.42m3盖板:混凝土预制盖板规格500300,全长32米,共计64块110kV回龙变电站10kV高压
5、开关柜改造工程 编号:0710kV高压室装修及排水沟增加工程10kV高压室装修及增加排水设施 排水沟 :V=0.85=5.2 m3 集水井:V=1.51.51.6=3.6 m3C25垫层混凝土:排水沟 :50.2=1.04m3集水井:V=1.70.2 =0.6m3V=0.30.242=5.6m32 +1.062 =2m3拖把池:V=1.52=.m32+1.062+1.54 =10m2排水管埋设开挖土方V=281.2= 33.6m3更换高压室排水管50米,10KV场地排水至厂区围墙外排水管埋设33米高压室小门封堵:0.372=1.11 m3高压室门洞补砌:V=(1.70.37+2.50.37)2
6、=1.62m3(两道)高压室窗子补砌:2=0.6 m3(两扇)高压室小门封堵:S=1.52.52=7.5m2高压室门洞补砌:S=(1.72+2.52=12.5 m2(两道)S=(0.82+0.82=4.4 m2(两扇)刮腻子粉:内墙:S=26m6m2+6m5m2-1.72(门)-1.73.2(门)-110(窗子)-14(窗子)+(12+0.610(窗檐)+(14(窗檐)+(2.52+1.72+3.20.37=366.1 m2屋顶:5m+56(梁)=154m2 外墙:S=5.85=29 m2挑檐:S=27.42+7.22=48.44 m2门外框:S=(0.73.20.7)2+22=12.62 m
7、2高压室原粉层脱落处:V=2.13+24=14.3 m2(两处)站外排水土方开挖:共清运177车(每车可运2.1m3)V=1772.1=371 m310kV高压室照明改造12盏0810kV高压开关柜改造电缆沟及盘柜基础工程量(m3)23.4m开挖土石方:V=23.41.41.2+13.451.721.2=67.1 m31.2+26.540.154.4=28.7 m3回填土石方:V=26.540.8= 12.7m3 V=23.42+13.452= 15m30.65+1.040.65+1.720.652+8.7350.65+0.83.870.65+11.850.65= 10.5m3C25压顶混凝土
8、:0.2+1.040.2+1.720.2+0.80.2+11.850.2= 3.23m3盘柜端子混凝土:V=0.270.8510个=1.84 m3高压室地坪混凝土:V=230.2+34.80.2=11.2S=23.40.9+1.040.9+1.720.9+0.8950.9+11.450.9+8.7350.9+3.8722面+0.2720面+48.70.24+0.2710个+3.870.8+4.826.4=215.4 m209屋外配电装置电缆井电缆井改造工程6处110kV 2#主变低压侧:6面+0.43面+1.10.4+0.62=0.5 m3高压室进线侧:0.4=0.33 m3V=0.356=0
9、.1 m3110kV 1#主变中压侧:V=32=0.51 m3C25垫层:3+1.10.15=0.17 m30.15=0.3m30.15=0.4 m3110kV 2#主变低压:S=0.62面+0.68面+0.40.24=4.54 m2S=1.40.4+3.40.24+3.40.3=3.2m2110kV 1#主变低压:S=0.2412+0.356=2 m22+32=5.2 m2年月日10110kV配电装置断路器操作机构检修110kV断路器操作机构检修1组工程内容:110kV#1主变高压侧101断路器操作机构检修11电流互感安装及调试35kV间隔技改工程组1、35kV德厚冶炼厂线381间隔2、35kV回阿回线线392间隔3、35kV回阿回线线393间隔4、35kV力创铁合金厂线394间隔、12辅助开关安装及调试隔离开关位置信号改造工程56把隔离开关位置信号改造56把13通信接入110kV回龙变电站通信改造500 m通信接入500 m