1、 2.2 Engineers Representative 2.3 Engineers Authority to Delegate 2.4 Appointment of Assistants 2.5 Instructions in writing 2.6 Engineer to Act Impartially Assignment and Subcontracting 3.1 Assignment of Contract 4.1 Subcontracting 4.2 Assignment of Subcontractors Obligations Contract Documents 5.1
2、Language/s and Law 5.2 Priority of Contract Documents 6.1 Custody and Supply of Drawings and Documents 6.2 One Copy of Drawings to be Kept on Site 6.3 Disruption of Progress 6.4 Delays and Cost of Delay of Drawings 6.5 Failure by Contractor to Submit Drawings 7.1 Supplementary Drawings and Instructi
3、ons 7.2 Permanent Works Designed by Contractor 7.3 Responsibility Unaffected by Approval General Obligations 8.1 Contractors General Responsibilities 8.2 Site Operations and Methods of Construction 9.1 Contract Agreement 10.1 Performance Security 10.2 Period of Validity of Performance Security 10.3
4、Claims under Performance Security 11.1 Inspection of Site 12.1 Sufficiency of Tender 12.2 Not Foreseeable Physical Obstructions or Conditions 13.1 Work to be in Accordance with Contract 14.1 Programme to be Submitted 14.2 Revised Programme 14.3 Cash Flow Estimate to be Submitted 14.4 Contractor not
5、Relieved of Duties or Responsibilities 15.1 Contractors Superintendence 16.1 Contractors Employees 16.2 Engineer at Liberty to Object 17.1 Settingout 18.1 Boreholes and Exploratory Excavation 19.1 Safety, Security and Protection of the Environment 19.2 Employers Responsibilities 20.1 Care of Works 2
6、0.2 Responsibility to Rectify Loss or Damage 20.3 Loss or Damage Due to Employers Risks 20.4 Employers Risks 21.1 Insurance of Works and Contractors Equipment 21.2 Scope of Cover 21.3 Responsibility for Amounts not Recovered 21.4 Exclusions 22.1 Damage to Persons and Property 22.2 Exceptions 22.3 In
7、demnity by Employer 23.1 Third Party Insurance (including Employers Property) 23.2 Minimum Amount of Insurance 23.3 Cross Liabilities 24.1 Accident or Injury to Workmen 24.2 Insurance Against Accident to Workmen 25.1 Evidence and Terms of Insurances 25.2 Adequacy of Insurances 25.3 Remedy on Contrac
8、tors Failure to Insure 25.4 Compliance with Policy Conditions 26.1 Compliance with Statutes, Regulations 27.1 Fossils 28.1 Patent Rights 28.2 Royalties 29.1 Interference with Traffic and Adjoining Properties 30.1 Avoidance of Damage to Roads 30.2 Transport of Contractors Equipment or Temporary Works
9、 30.3 Transport of Materials or Plant 30.4 Waterborne Traffic 31.1 Opportunities for Other Contractors 31.2 Facilities for Other Contractors 32.1 Contractor to Keep Site Clear 33.1 Clearance of Site on Completion Labour 34.1 Engagement of Staff and Labour 35.1 Returns of Labour and Contractors Equip
10、ment Materials, Plant and Workmanship 36.1 Quality of Materials, Plant and Workmanship 36.2 Cost of Samples 36.3 Cost of Tests 36.4 Cost of Tests not Provided for 36.5 Engineers Determination where Tests not Provided for 37.1 Inspection of Operations 37.2 Inspection and Testing 37.3 Dates for Inspec
11、tion and Testing 37.4 Rejection 37.5 Independent Inspection 38.1 Examination of Work before Covering up 38.2 Uncovering and Making Openings 39.1 Removal of Improper Work, Materials or Plant 39.2 Default of Contractor in Compliance Suspension 40.1 Suspension of Work 40.2 Engineers Determination follo
12、wing Suspension 40.3 Suspension lasting more than 84 Days Commencement and Delays 41.1 Commencement of Works 42.1 Possession of Site and Access Thereto 42.2 Failure to Give Possession 42.3 Rights of Way and Facilities 43.1 Time for Completion 44.1 Extension of Time for Completion 44.2 Contractor to
13、Provide Notification and Detailed Particulars 44.3 Interim Determination of Extension 45.1 Restriction on Working Hours 46.1 Rate of Progress 47.1 Liquidated Damages for Delay 47.2 Reduction of Liquidated Damages 48.1 TakingOver Certificate 48.2 TakingOver of Sections or Parts 48.3 Substantial Compl
14、etion of Parts 48.4 Surfaces Requiring Reinstatement Defects Liability 49.1 Defects Liability Period 49.2 Completion of Outstanding Work and Remedying Defects 49.3 Cost of Remedying Defects 49.4 Contractors Failure to Carry Out Instructions 50.1 Contractor to Search Alterations, Additions and Omissi
15、ons 51.1 Variations 51.2 Instructions for Variations 52.1 Valuation of Variations 52.2 Power of Engineer to Fix Rates 52.3 Variations Exceeding 15 percent 52.4 Daywork Procedure for Claims 53.1 Notice of Claims 53.2 Contemporary Records 53.3 Substantiation of Claims 53.4 Failure to Comply 53.5 Payme
16、nt of Claims Contractors Equipment, Temporary Works and Materials 54.1 Contractors Equipment, Temporary Works and Materials; Exclusive Use for the Work 54.2 Employer not Liable for Daage 54.3 Customs Clearance 54.4 Reexport of Contractors Equipment 54.5 Conditions of Hire of Contractors Equipment 54
17、.6 Costs for the Purpose of Clause 63 54.7 Incorporation of Clause in Subcontracts 54.8 Approval of Materials not Implied Measurement 55.1 Quantities 56.1 Works to be Measured 57.1 Method of Measurement 57.2 Breakdown of Lump Sum Items Provisional Sums 58.1 Definition of “Provisional Sum” 58.2 Use o
18、f Provisional Sums 58.3 Production of Vouchers Nominated Subcontractor 59.1 Definition of “Nominated Subcontractors” 59.2 Nominated Subcontractors; Objection to Nomination 59.3 Design Requirements to be Expressly Stated 59.4 Payments to Nominated Subcontractors 59.5 Certification of Payments to Nomi
19、nated Subcontractors Certificates and Payment 60.1 Monthly Statements 60.2 Monthly Payments 60.3 Payment of Retention Money 60.4 Correction of Certificates 60.5 Statement at Completion 60.6 Final Statement 60.7 Discharge 60.8 Final Payment Certificate 60.9 Cessation of Employers Liability 60.10 Time
20、 for Payment 61.1 Approval only by Defects Liability Certificate 62.1 Defects Liability Certificate 62.2 Unfulfilled Obligations Remedies 63.1 Default of Contractor 63.2 Valuation at Date of Termination 63.3 Payment after Termination 63.4 Assignment of Benefit of Agreement 64.1 Urgent Remedial Work
21、Special Risks 65.1 No Liability for Special Risks 65.2 Special Risks 65.3 Damage to Works by Special Risks 65.4 Projectile, Missile 65.5 Increased Costs arising from Special Risks 65.6 Outbreak of War 65.7 Removal of Contractors Equipment on Termination 65.8 Payment if Contract Terminated Release fr
22、om Performance 66.1 Payment in Event of Release from Performance Settlement of Disputes 67.1 Engineers Decision 67.2 Amicable Settlement 67.3 Arbitration 67.4 Failure to Comply with Engineers Decision Notices 68.1 Notice to Contractor 68.2 Notice to Employer and Engineer 68.3 Change of Address Defau
23、lt of Employer 69.1 Default of Employer 69.2 Removal of Contractors Equipment 69.3 Payment on Termination 69.4 Contractors Entitlement to Suspend Work 69.5 Resumption of Work Changes in Cost and Legislation 70.1 Increase or Decrease of Cost 70.2 Subsequent Legislation Currency and Rates of Exchange
24、71.1 Currency Restrictions 72.1 Rates of Exchange 72.2 Currency Proportions 72.3 Currencies of Payment for Provisional Sums REFERENCE TO PART II INDEX TENDER APPENDIX AGREEMENT EDITORIAL AMENDMENTS IN 1988 FURTHER AMENDMENTS IN 1992 PART I GENERAL CONDITIONSDefinitions and InterpretationDefinitions1
25、.1 In the Contract (as hereinafter defined) the following words and expressions shall have the meanings hereby assigned to them, except where the context otherwise requires: (a) (i) “Employer” means the person named as such in Part II of these Conditions and the legal successors in title to such per
26、son, but not (except with the consent of the Contractor) any assignee of such person. (ii) “Contractor” means the person whose tender has been accepted by the Employer and the legal successors in title to such person, but not (except with the consent of the Employer) any assignee of such person. (ii
27、i) “Subcontractor” means any person named in the Contract as a Subcontractor for a part of the Works or any person to whom a part of the Works has been subcontracted with the consent of the Engineer and the legal successors in title to such person, but not any assignee of any such person. (iv) “Engi
28、neer” means the person appointed by the Employer to act as Engineer for the purposes of the Contract and named as such in Part II of these Conditions. (v) “Engineers Representative” means a person appointed from time to time by the Engineer under SubClause 2.2. (b) (i) “Contract” means these Conditions (Parts I and II), the Specification, the Drawings, the Bill of Quantities, the Tender, the Letter of Acceptance, the Contract Agreement (if completed) and such further documents a