1、单价(元)合价(元)第一部分:8144541.781.1M7.5浆砌石护坡m3338.33314.58106431.851.2土方开挖(人工)2201.509.5721068.361.3石方开挖(人工)943.5030.3328616.361.4土方回填1942.505.1510003.881.5C15砼垫层29.14362.0310549.551.6C20砼挡墙145.69414.4160375.391.7642.29448.49288060.641.8钢筋T3.407316.0524874.571.9细部结构(砼)817.11108171.10消力池(0+136.00+158.0) (0+
2、207.00+223.0)2.11328.8712707.722.2331.9810068.952.31328.676842.652.4C15砼边墙331.17434.44143872.172.5C20砼底板19.958267.482.6碎石垫层15.9696.701543.332.7钢筋制安10.6077550.132.8351.123511.20海漫段(0+2230+233)22023.453.1100.00957.003.220.00606.603.3土方夯填50.0013.71685.503.4M7.5浆砌石挡墙56.7017836.693.5M7.5浆砌石底板5.25298.8515
3、68.973.6细部结构(浆砌石)61.956.00371.70项目名称计量单位工程数量估算金额第四部分:土围堰围堰拆除架子车道路房屋建筑建筑工程办公、生活及文化福利建筑施工仓库1200.00四10kv临时工程Km五元3.3单价析表单价分析表项目编号: 省(96)概 -3017 项目名称: M7.5浆砌石护坡 拌制砂浆、选料、洗石、找平、砌筑、勾缝、工作内容: 养护、场内运输 单价: 314.58 计算单位:10m3费用名称单价合计备注直接费2688.49基本直接费2585.091人工费工日23.3334.24798.822材料费1784.07块石11.6475973.00砂浆3.65249.
4、61911.073其他费用其他直接费%4103.40间接费20159.76计划利润7199.38税金3.2298.133145.77六每m3(盖单位章) 甘肃生活上东乡族自治县第三建筑工程公司 2013年12 月 15日 省(96)概 -1007 项目名称: 土方开挖(人工) 挖土、抛土于槽边、修边 单价: 9.57 100m3752.31723.3720.232.06712.371128.9316113.9860.6429.85956.78 省(96)概 -2304 项目名称: 土方回填 钻孔、爆破、出渣 单价: 30.33 2494.422398.4835.661257.59788.54合
5、金钻头个1.8245.0081.90空心钢kg0.718.005.68炸药34.238.50290.96雷管1301.50195.00导火线m2151.00215.00机械费330.36手持式风钻台班101.95152.93修钎设备0.06380.3722.82载重汽车5t0.22402.4688.542295.94251.52计划费192.2294.61小计3032.76 省(96)概 -1144 项目名称: 工作内容: 推运、卸除、拖平、空回 单价: 5.15 463.60445.770.5318.69推土机0.49670.34410.5816.517.832.9932.6616.0851
6、5.33 省(96)概 -4064 项目名称: C15砼垫层 模板制作安装、拆除、拌合、浇筑、养护 单价: 362.03 3036.812920.0113.1536.23524.072129.18板枋材0.01240024.00钢模及扣件0.415.502.26型钢0.234.901.13铁件0.374.51.67电焊条6.50.07铁钉50.05砼10.3202.582086.52水913.50258.750.4m3拌和机0.43167.3471.96振捣器2.2kw0.9624.5323.55离心水泵7-17kw0.21143.3630.11风水(砂)枪0.4191.3276.53架子车1
7、.792.714.868116.8046241.07229.45112.943620.26八单位分析表 省(96)概 -4134 项目名称: C20砼底板 模板之谈作安装、拆除、拌合、浇筑、养护 单价: 414.413409.543278.4132.23744.852382.900.0496.008.5847.194.8323.674.50209.332156.0515.00128.650962.737.41131.14342.63262.65129.284144.10 省(96)概 -4117 项目名称: C20砼挡墙 448.49直霎费3591.223453.0925.611020.642
8、285.570.0372.0019.251.999.753.1614.226.500.465.000.35135.894.02电焊机16-30kva0.02215.774.32138.12469.49284.25139.914484.87 省(96)概 -4303 项目名称: 钢筋制安 钢筋加工、安装 单价: 7316.05t6316.156073.2216.8669.534654.931.0245004590.007.2246.93铁丝18.00708.76钢筋调直14kw0.1373.630.3363.14钢筋切断20kw0.08105.278.42钢筋弯曲机6-30KVA86.1219.
9、812.16466.0740242.93307.98463.96228.23(盖单位章)甘肃省东乡族自治州第三建筑工程公司 2013年12月15日 省(96)概 -3009 项目名称: 砂砾石垫层工作内容: 铺填、整平、压实 单价: 96.70 837.14804.955.44191.85612.00砂砾石10.26032.2038.3761.2930.16966.97 省(96)概 -1284 项目名称: 土方夯填 取土、回填、酒水、夯实 单价: 13.711115.731072.8222.29786.081.261.89蛙式打夯机2.8kw2.2499.77279.355.542.91125.7786.9142.771371.183.4增加承包项目分解表总价承包项目分解表说明m2100合计: 3200.00元项目名称:房屋建筑工程10kv临时线路10000项