1、BL-巴勒斯坦() BN-文莱(BRUNEI DARUSSALAM) BO-玻利维亚(BOLIVIA) BR-巴西(BRAZIL) BW-博茨瓦纳(BOTSWANA) BY-白俄罗斯(BYELORUSSIA) C字头 CA-加拿大(CANADA) CF-中非(CENTRAL AFRICA) CG-刚果(CONGO) CH-瑞士(SWITZERLAND) CL-智利(CHILE) CM-喀麦隆(CAMEROON) CN-中国(CHINA) CO-哥伦比亚(COLOMBIA) CR-哥斯达黎加(COSTA RICA) CS-捷克(CZECH REPUBIC) CU-古巴(CUBA) CY-塞浦路斯
2、(CYPRUS) D字头 DE-德 国(GERMANY) slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wea
3、r into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes ste
4、am end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor. 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general unders
5、tand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this
6、class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, DK-丹麦(DENMARK) DO-多米尼加共和国(DOMINICAN REPUBLIC) DZ-阿尔及利亚(ALGER
7、IA) E字头 EC-厄瓜多尔(ECUADOR) EE-爱沙尼亚(ESTONIA) EG-埃及(EGYPT) ES-西班牙(SPAIN) ET-埃塞俄比亚(ETHIOPIA) F字头 FI-芬兰(FINLAND) FJ-斐济(FIJI) FR-法国(FRANCE) G字头 GA-加蓬(GABON) GB-英国(UNITED KINGDOM) GD-格林纳达(GRENADA) GE-格鲁吉亚(GEORGIA) GH-加纳(GHANA) GN-几内亚(GUINEA) GR-希腊(GREECE) GT-危地马拉(GUATEMALA) H字头 HK-香港特别行政区(HONG KONG) HN-洪都拉斯
8、(HONDURAS) HU-匈牙利(HUNGARY) I字头 ID-印度尼西亚(INDONESIA) IE-爱尔兰(IRELAND) IL-以色列(ISRAEL) IN-印度(INDIA) IQ-伊拉克(IRAQ) IR-伊朗(IRAN) IS-冰岛(ICELAND) IT-意大利(ITALY) J字头 JM-牙买加(JAMAICA) JO-约旦(JORDAN) JP-日本(JAPAN) K字头 KG-吉尔吉斯坦(KYRGYZSTAN) KH-柬埔寨(KAMPUCHEA(CAMBODIA) KP-北朝鲜(KOREA,DEM.PEOPLES) KR-韩国(REPUBLIC OF KOREA) K
9、T-科特迪瓦共和国(COTE OIVOIRE) KW-科威特(KUWATI) KZ-哈萨克(KAZAKHSTAN) L 字头 LA-老挝(LAOS) LB-黎巴嫩(LEBANON) LC-圣卢西亚(SAINT LUEIA) LI-列支敦士登(LIECHTENSTEIN) LK-斯里兰卡(SRI LANKA) LR-利比里亚(LIBERIA) LT-立陶宛(LITHUANIA) LU-卢森堡(LUXEMBOURG) 拉脱维亚(LATVIA) LV-LY-利比亚(LIBYAN) M字头 MA-摩洛哥(MOROCCO) MC-摩纳哥(MONACO) MD-摩尔多瓦(MOLDOVA,REPUBLIC
10、OF) MG-马达加斯加(MADAGASCAR) ML-马里(MALI) MM-缅甸(BURMA(MYANMAR) MN-蒙古(MONGOLIA) MO-澳门地区(MACAU) MT-马耳他(MALTA) MU-毛里求斯(MAURITIUS) MW-马拉维(MALAWI) MX-墨西哥(MEXICO) MY-马来西亚(MALAYSIA) MZ-莫桑比克(MOZAMBIQUE) N字头 NA-纳米比亚(NAMIBIA) NE-尼日尔(NIGER) NG-尼日利亚(NIGERIA) NI-尼加拉瓜(NICARAGUA) slightly lowered the field side, the st
11、eam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outsi
12、de wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using
13、 two Taiwan lane synchronization up high rotor. 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against
14、system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping t
15、rend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, NL-荷兰(NETHERLANDS) NO-挪威(NORWAY) NP-尼泊尔(NEPAL) NZ-新西兰(NEW ZEALAND) O字头 OM-阿曼(OMAN) P字头 PA-巴拿马(PANAMA) PE-秘鲁(PERU) PG-巴布亚新几内亚(PAP
16、UA NEW GUINEA) PH-菲律宾(PHILIPPINES) PK-巴基斯坦(PAKISTAN) PL-波兰(POLAND) PT-葡萄牙(PORTUGAL) PY-巴拉圭(PARAGUAY) Q字头 QA-卡塔尔(QATAR) R RO-罗马尼亚(ROMANIA) RU-俄罗斯(RUSSIAN FEDERATION) S字头 SA-沙特阿拉伯(SAUDI ARABIA) SC-塞舌尔(SEYCHELLES) SD-苏丹(SUDAN) SE-瑞典(SWEDEN) SG-新加坡(SINGAPORE) SI-斯洛文尼亚(SLOVENIA) SK-斯洛伐克(SLOVAKIA) SM-圣马力诺
17、(SAN MARINO) SN-塞内加尔(SENEGAL) SO-索马里(SOMALIA) SY-叙利亚(SYRIA) SZ-斯威士兰(SWAZILAND) T 字头 TD-乍得(CHAD) TG-多哥(TOGO) TH-泰国(THAILAND) TJ-塔吉克斯坦(TAJIKISTAN) slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and
18、steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note li
19、fting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor. 6.5 unit main plant soda small pipeline laying 6.5.12 times design d
20、esign principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse wa
21、ter any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installati
22、on of the valve firmly. Depending on the circumstances, TM-土库曼(TURKMENISTAN) TN-突尼斯(TUNISIA) TR-土耳其(TURKEY) TW-台湾省(TAIWAN) TZ-坦桑尼亚(TANZANIA) U字头 UA-乌克兰(UKRAINE) UG-乌干达(UGANDA) US-美国(UNITED STATES) UY-乌拉圭(URUGUAY) UZ-乌兹别克(UZBEKISTAN) V 字头 VC-圣文森特岛(SAINT VINCENT) VE-委内瑞拉(VENEZUELA) VN-越南(VIET NAM) Y 字
23、头 YE-也门(YEMEN) YU-南斯拉夫联盟(YUGOSLAVIA) Z 字头 ZA-南非(SOUTH AFRICA) ZM-赞比亚(ZAMBIA) ZR-扎伊尔(ZAIRE) ZW-津巴布韦(ZIMBABWE) slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, remov
24、ing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam
25、end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor. 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system p
26、ipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified an
copyright@ 2008-2022 冰豆网网站版权所有
经营许可证编号:鄂ICP备2022015515号-1