1、 GJB1410-92 satellite news measure interface requirement the satellite of Q/W364A-97 news performance test equipment terminology the satellite of Q/W113A-2002 news performance test terminology The TC-2.2LC01 satellite technical process of R&D TC-2DG06TC-2 satellite mechanics test outline TCD-2DG04TC
2、-2 straight shape star mechanics test test outline 3 the purpose of mechanics experiment Guarantee satellite in mechanics experiment add news state control and installation, test through vibrating is former , in , rear for satellite news performance test and keep watch on , noise experiment is forme
3、r , in , rear satellite news performance test and keep watch on , inspection satellite news performance whether satisfaction mechanics environmental design requirement. 4 test step Vibration experiment according to Z X 3 Y direction orders go on , every direction according to feature level sine acce
4、ptance level feature level order tests. After being completed , 3 direction vibration experiments carry out noise experiment. Include in which: Before 1 satellites are tested , inspect always;2 Z installs and keeps watch on to vibration state , tests after shaking;3 X installs and keeps watch on to
5、vibration state , tests after shaking;4 Y installs and keeps watch on to vibration state , tests after shaking;5 Noise test state is installed and kept watch on , is tested after shaking;6 After being tested , satellite inspects always;7 Stretch rod to spread out experiment 8 Illumination is tested
6、5 test equipment spreads out debug a. Testing equipment to spread out take the place: Each subsystem tests equipment, take the place according to stipulation between test to spread out;b. Test equipment shell should receive through earthing stake technology land , and using examination electrography
7、 inspect the instrument shell owned, should be not electrified;c. Testing equipment to use satellite equivalent ware or simulator carry out closed circuit or the inspection of open loop according to the program of self check;d. Ground test system unites examination;e. Join debug commander to manage
8、system. 6 test post code name Electricity measures commander 10 Star goes out to drill to make 160 Control always 161 Look controls 162 Let distribution 163 Star affir 165 Measure to control 166 The of power source 168Remotely control , telemetering 169 Effective load 16A 7 test working program reco
9、rd sheet see belowTC-2 Just,shape star mechanics is tested(experiment)work program record sheet Model: TC-1 date :Test project name Before satellite shakes , tests Develop stage ZSequence number Working project Working program content and requirement Test result Carry out person Check person Time 1S
10、atellite state is inspected Satellite takes the place rear,inspection splits switch is in to press the state joined,the fiery work article of-X02B protective plug and the high voltage of-X05B prohibit plug connection is good. a. Satellite takes the place rear,receive satellite earth wire to hall a k
11、ind of earth wire goes up,and inspection joins whether it is reliable guarantee reliable earthing;b. Insert to drop plug-X01B;c. Frame replies well machine take over and dispatch antenna;d. Put up several biography receving antenna;e. Join control subsystem star table plug-X04B. f. Split switch shou
12、ld be in all along in entire process to press the state joined! The protective plug of high voltage is in all along the state that joins! Protective plug joins fiery work article( -X02B( G) Satellite adds news The battery of 163/ receives to enter The record battery voltage of 163/: 2025 V The adjus
13、tment of 166/ measures to control subsystem ground test equipment parameter and establishment is normal to measure to control passageway 161/ supplies power to start;The simulator litre of 168/ news;Record load current:169/ comes from Jian instruction K ;Observe the instruction of self check to carry out cond
copyright@ 2008-2022 冰豆网网站版权所有
经营许可证编号:鄂ICP备2022015515号-1