1、1.Purpose 目的Site Acceptance Testing (SAT), to verify that the proposed testing of specific items of major equipment and system at site meets the requirement of URS. To ensure the HVAC system assembling and commissioning compare with the requirement.在项目现场,测试关键系统和设备的被要求的项目符合URS的要求,保证空调系统已经按要求完成了组装和调试。
2、2.SAT scope 范围This document records the SAT of AHU-402 system该文件记录了AHU-402系统的现场测试。AHU-402 ,the air handling unit provides air flow through the HEPA to provide clear air to rooms :room 4063,buffer room.CNC;room 4075,PAL.CNC;room 4076,PAL,Grade C;room 4077,buffer room,Grade C;room 4078,Limit bacteria
3、detection chamber,Grade C. AHU-402空调机组为4063房间缓冲二,4075房间C级一更,4076房间C级二更,4077房间C级缓冲3,4078房间限度菌检测室提供洁净空气。3.Abbreviations 术语和缩略语Abbreviation缩写Full Name全称QAQuality Assurance 质量保证FATFactory Acceptance Test 工厂验收测试SATSite Acceptance Test 现场验收测试URSUser Requirement Specification 用户需求GDPGood Documentation Prac
4、tice 良好的文件管理规范GTPGood Test Practice 良好的测试规范AHUAir Handling Unit 空气处理机组MAUMakeup Air Handling Unit 新风处理机组MALMaterial Air Lock物流气闸PALPersonnel Air Lock人流气闸HVACHeating Ventilation and Air Conditioning 暖通空调HEPAHigh Efficiency Particulate Air 高效空气过滤器MCMechanical Completion 机电完工BMSBuilding Management Syst
5、em 楼宇自控系统VMPValidation Master Plan 验证总计划4.System Deription 系统描述AHU-402 system is composed of AHU-402 unit, Exhaust fan with fine filter EU-402-01/EU-402-02,constant variable air volume with damper ,H14 terminal high efficiency filter , as well as the corresponding pipeline system.as below drawing :A
6、HU-402系统由空调机组AHU-402、中效过滤风机箱EU-402-01/EU-402-02,定风量阀、H14末端高效过滤器等以及相应的管路系统组成。如下图所示:5.Reference and Regulation 参考文件及规Following documents form the basis of the Site Acceptance Testing:以下是现场验收测试的基础文件:No.编号Document/Regulation Name文件/规范名称Document/Regulation Number文件/规范编号Version版本1Technical Specification o
7、f Air Handling Units空调机组技术规格书CHTBIO-01-05-TS-001_空调机组技术规格书0012Technical Specification of FAN风机技术规格书CHTBIO-01-05-TS-002_风机技术规格书 3Technical Specification of HVAC Installation暖通空调安装技术说明CHTBIO-01-05-TS-003_暖通空调安装技术说明4URS - Grade CC级洁净区用户需求说明18CT121-010-45-URS-640025Code of acceptance for construction qu
8、ality of ventilation and air conditioning works通风与空调工程施工及验收规范GB 50243-201620166Code for construction of ventilation and air conditioning 通风与空调工程施工规范GB 50738-201120117Code for construction and acceptance of cleanroom洁净室施工及验收规范GB 50591-201020108Code for construction and quality acceptance of industria
9、l cleanroom洁净厂房施工及质量验收规范GB 51110-201520159Cleanrooms and associated controlled environments-Part 1: Classification of air cleanliness by particle concentration洁净及相关受控环境 第一部分:空气洁净度分级ISO 14644-110Cleanrooms and associated controlled environments-Part 3: Test methods洁净室及相关受控环境 第三部分:测试方法ISO 14644-320196
10、.Responsibilities 职责To identify the specific responsibilities of each side of author, executor and approver.应明确该方案起草方、执行方、批准方, 各方的具体职责。Contractor 承包商:Draft Commissioning Protocols / Reports.编写调试方案和报告。Development of SAT Protocols / Reports in accordance with the SAT shedule. 根据验证的进度准备现场验收测试方案、报告。Prov
11、ide appropriately resources for the completion of the testing assigned. 提供合适的资源完成约定的测试内容。Plan and qualify the equipment / systems in accordance with approved SAT Protocols.根据批准的SAT方案计划确认设备、系统。Deviation correction execution. 执行偏差的纠正。Management company管理公司Review commissioning protocol and report.审核调试方
12、案和报告。Review commissioning test result. 审核调试测试结果。Review deviation generated during commissioning test.审核调试测试过程中产生的偏差。Project& user 项目和用户Review and approve SAT Protocol and Report 审核及批准 SAT方案及SAT报告GDP/GTP training GDP/GTP 培训Deviation Handling Management training 偏差管理培训SAT execution witness and managem
13、ent 见证及管理现场验收测试Approve deviation record 批准偏差记录Approve deviation report .批准偏差报告7.SAT Execution 系统调试执行7.1.Prerequisites 先决条件Purpose 目的All prerequisites necessary to the SAT execution have been satisfied. 满足系统调试执行的所有先决条件。Procedure 方法The SAT protocol has been approved. SAT方案已完成并审批。The mechanical and ele
14、ctrical installation has been successfully completed. 机电安装已完成。The BMS system commissioning completed.BMS 系统调试完毕。Confirm the deviations in prior has been closed.确认前期的偏差项已关闭。 Acceptance Criteria 接受标准Confirm all the prerequisites must be completed before the beginning of the execution of SAT. 在系统调试开始前所有的先决条件必须满足。Result 结果Fill in Form 7.1. Where requirements results “Not Applicable” fill the cell with “N/A” and explain the
copyright@ 2008-2022 冰豆网网站版权所有