1、 Packer rubber for staged fracturing toolSpecification No:Internal Order No:Client: Revised No:GENERAL CONTRACTBETWEENAND OFTHE PACKER RUBBERFOR STAGED FRACTURING TOOLIN ALBERT CANADABYUNIVERSITY OF ALBERTAPrepared By:SheetGENERAL CONTRACT BETWEEN AND UNIVERSITY OF ALBERTA OF THE PACKER RUBBER FOR S
2、TAGED FRACTURING TOOLIntroductionAccompanying with the fast growing of fracturing operation in petroleum industry in China, the usage of the staged fracturing tools will be expanded markedly. By the invitation of Prof. Gu, University of Alberta (shall mean the Party B) will help Poly-Doctor Petroleu
3、m Technology Co. Ltd. Beijing (shall mean the Party A) to develop a packer rubber for staged fracturing tool. The site of the packer rubber manufacturing plant is selected in Alberta. (More information please is noticed in the attachment of the Proposal of the packer rubber production line for stage
4、d fracturing tool in Alberta, Canada. Internal Order No: UAlberta-2012-11)Parties in this ContractEntrusting Party (Party A):Entrusted Party (Party B): University of Alberta116 St, 85 AveEdmonton, ABCanadaT6G 2R3Articles of Rights and Obligations of two PartiesThe following articles have been discus
5、sed and agreed upon between Party A (stands for ) and Party B (stands for University of Alberta):The scope of supply for this Contract is Party B helps Party A to build a packer rubber for staged fracturing tool (required technical specification is attached in the technical index).Party A entrusts P
6、arty B to research and develop technique proposal of a packer rubber for staged fracturing tool. The following articles are reached and abided by the both parties. Article 1: Definitions 1.1 Technique proposal of a packer rubber for staged fracturing tool (hereinafter referred to as “the Solution”)
7、shall mean all the required techniques to construct the general idea which will commit the attached technical index requirements in attachment. The Solution shall include all technical details of all designing schemes and experimental verification for key parameters. 1.2 Technical documentations sha
8、ll mean all the necessary documents to design the Solution and all the verification documents that Party B will use in designing the Solution. 1.3 “R&D” shall mean research and development.Article 2: Contents & Scopes of Contract 2.1 The requirements of the Contract Solution 2.1.1 Technical Content:
9、(a) Design technical proposal;(b) Key features verification;(c) Detailed technical requirements see technical index attachment. 2.2 The obligations of both parties 2.2.1 Party B shall submit the R&D plan to Party A within two months after this Contract comes into effect.2.2.2 With the confirmation o
10、f the both parties, within the validity of the Contract, Party A shall designate Mr. as Party As project contact person. Party B shall appoint Mr. as Party Bs project contact person. If any changes of the contact person occur, one party shall inform the other party based on written materials in due
11、time. If one party fails to promptly inform the other party, it shall be held responsible for any influence or damage caused by the untimely notification during the performance of the Contract. 2.3 Delivery Party B shall deliver the Contract Solution to Party A before November 1st 2012, which shall
12、be in accordance with the contents as specified in the technical index of Internal Order No: UAlberta-2012-11 of the attachment of the Contract. 2.4 Assessment & Acceptance Confirmed by the both parties, Party A shall adopt the signed standards and methods to examine and accept the Contract Solution
13、 by Party B. 2.4.1 To ensure that the Contract Solution supplied by Party B is correct, reliable and advanced,Party A and B shall jointly perform the assessment and acceptance of the technical Solution and core parameters in accordance with the provisions of items 2.1 - 2.3 of the Contract and techn
14、ique attachment. If the technical Solution are qualified, both parties shall jointly sign a certificate of acceptance in two copies, one for each party. 2.4.2 If the Solution is not able to meet the requirements of the Contract, both parties shall hold friendly discussions to analyze the reasons and
15、 take measures to correct any defect and prepare for the second assessment and acceptance of the Contract Solution, and the second assessment shall be delivered to Party A after 120 days of the date of Delivery. If the Solution are still not qualified after the second assessment and acceptance and the responsibility lies in Party B ,Party B shall be responsible for all the losses thus caused, Party A shall have the right to terminate the Contract and raise a claim against Party B according to Article 6;If the responsibility lies in Party A, both parties shall mutually discuss the furth