1、11.8 Work after the project stand-alone commissioning单机试车后的工作;11.9Difficulties and countermeasures of the project stand-alone commissioning项目单机试车的难点及对策11 Project Commissioning Execution Plan 项目单机试车执行计划11.1 Overview of the project stand-alone commissioning项目单机试车概述Requirements in accordance with the c
2、urrent owners of tender documents, the project total of:依据目前业主招标文件要求,本项目共有:11.1.1 Amount of devices设备数量No. 序号Equipment Category设备类别Amount (units / sets)工程量(台/套)Remark备注1Column塔类设备 62Reactors反应器 103Heat Exchangers换热设备 334Vessels罐295Mixer混合器9Separators分离器7Reboiler再沸器8Filter过滤器 11Pumps机泵 52Geosynclinal
3、地槽Evaporator蒸发器12Hoist起重葫芦 13Ejector喷射器14Dryer干燥器 15Electrical Heater电加热器16General Equipment其他设备 Total 总计18111.2.1 Construction contract content and the parties negotiated matters approved工程建设合同内容及合同双方洽商认可的事项11.2.2 Various types of equipment manufacturers technical data各类设备厂家技术资料11.2.3 Approved engi
4、neering construction design documents, drawings and change;批准的工程建设设计文件、图纸及变更;11.2.4 The relevant laws and regulations, mandatory standards for construction projects and other agreed implementation standards有关的法律法规、工程建设强制性标准及其它约定执行的标准11.2.5 Various state rules of construction inspection国家各类施工验收规范11.2
5、.6 The overall project construction organization design项目整体施工组织设计11.3 Organization of the project stand-alone commissioning项目单机试车的组织11.3.1 Division of work工作分工 The project stand-alone commissioning organized by CNF, coordinated by owner, supervised by supervision units, equipment manufacturers and t
6、echnical personnel on-site guidance.单机试车由核五公司组织,业主单位配合,监理单位监督确认,设备厂家技术人员现场指导进行。11.3.2 Working bodies工作机构:Leader: Project ManagerSafety ManagerTechnical ManagerConstruction ManagerQuality ManagerPurchasing ManagerMembers: the construction team, professional engineerOwners teamSuppliers组长:项目经理安全经理技术经理
7、施工经理质量经理采购经理组员:各施工队、各专业工程师业主团队供货厂家11.4 Process of the project stand-alone commissioning项目单机试车的流程11.4.1 According to the characteristics of the project and the system, according to the progress of the transfer of the owners tender documents clearly succession requirements, CNF companies determined th
8、e project stand-alone commissioning strategy is:依照本项目特点和系统,根据业主招标文件中明确系统陆续移交的进度要求,核五公司确定的本项目单机试车策略是:(1) Complete system mechanical completion priority, one by one according to the system divided优先、逐一根据系统划分完成具备条件的系统机械竣工;(2) After all system mechanical completion, do the acceptance of project overall
9、mechanical completion所有系统机械竣工后,进行工程整体机械竣工验收。11.4.2 Project mechanical completion of the implementation of the flow chart项目机械竣工实施流程图System handover order to determine No: 2Materials ManagementDatabaseSchedule DeterminePressure Test Package Dipartition DatabasePurge Package Dipartition Database 1 NDev
10、ice system partitioning databaseWelding and non-destructive testing databaseSystem piping heat tracing, insulation completedSystem all the container is opened, check, clean, closedSystem installation completedSystem electrical, instrumentation installation and commissioning completedSubmit No: 2 mec
11、hanical completion notice N mechanical completion notice 1 mechanical completion noticeSystem No: 2 ConstructionSystem piping pressure test, purge, reset is completedSystem electrical, instrumentation installed partially completedPartial completion of system installationHeat tracing, insulation bega
12、n constructionSystem construction records for follow-upSystem piping soapy water, helium leakSubmission System No.:Mechanical notice of completion 2 last item Close 2 checksSubmitted to the completion of construction machinery applicationsContract workers within the total range of pressure vessels, piping special in