1、配电箱维护手册完成版Operation and Maintenance Manual(Electrical-Distribution Board)维 护 操 作 手 册(电气-配电箱)Project Name: Andreas Stihl Powertools(QingDao) New Plant项 目 名 称: 安德烈斯蒂尔动力工具(青岛)有限公司新建厂房Construction Company: Shanghai Changjiang Zblin JV施 工 单 位: 上海长江旭普林建筑工程有限公司Submitted by:编 制 单 位:Date:日期: Table of Content
2、s1.0General Description of Project工程概况 2.0Main Materials Used in Project工程主要材料构成3.0Improtant Notices during installation of distribution boards配电箱安装注意事项:4.0Ambient Conditions and Notices for LV Distribution Boards:低压配电柜使用环境、注意事项5.0Instructions to Operation and Maintenance for LV Distribution Boards低
3、压配电柜操作、维护说明:6.0Trouble Shooting常见故障及处理方法:Maintenance Manual维护手册1.General Description of Project工程概况:Project name : Andreas Stihl Powertools (Qingdao) Co., Ltd. New Production Project项目名称: 安德烈斯蒂尔动力工具青岛有限公司新建厂房项目Employer: Andreas stihl Powertools (Qingdao) Co., Ltd.业主: 安德烈斯蒂尔动力工具(青岛)有限公司General contra
4、ctor: Changjiang zublin JV总包方: 上海长江旭普林建筑工程有限公司Subcontractor: The Fourth Construction Co., Ltd. of China Electronics System Engineering专业承包公司: 中国电子系统工程第四建设有限公司Scope of Contract: LV Distribution System承包内容: 低压配电系统。Started: Apr. 1, 2006 Completed: Jun. 21, 2006工程开竣工日期: 2006-4-1至2006-6-212.Main Material
5、s Used in Project工程主要材料构成: In this project, the distribution boards can be divided into two kinds, one is LV switchboard, of which the body is from Zhenjiang Moller and inner components from German Moller, while the other is MCC, of which the body is from Shanghai Huatong and inner components from A
6、BB.本工程配电柜为镇江默勒电气有限公司和上海华通输配电有限公司产品。可以分成低压开关柜及MCC控制柜两类。低压开关柜为镇江默勒成套配电柜,内部器件为德国默勒公司产品。MCC柜为上海华通输配电公司产品,柜体为德国施奈德产品,内部器件为ABB产品。 Description of Functions of Each Distribution Boards各配电柜主要功能描述:S/N序号No. of Distribution Board配电箱编号Location位置Detailed Datas and Description of Functions详细参数和功能描述16ALFuel oil pum
7、p house 190190燃油泵房Refer to systematic drawings and wiring drawings见配电箱系统图、接线图2AMHV distribution room高压配电室Refer to systematic drawings and wiring drawings见配电箱系统图、接线图34AL1Material packaging room390-01-01-01材料包装间Refer to systematic drawings and wiring drawings见配电箱系统图、接线图44AL2Waste collecting room390-01
8、-02-01 废料收集室Refer to systematic drawings and wiring drawings见配电箱系统图、接线图54AP1Waste collecting room390-01-02-01 废料收集室Refer to systematic drawings and wiring drawings见配电箱系统图、接线图6KTJ2Waste collecting room390-01-02-01 废料收集室Refer to systematic drawings and wiring drawings见配电箱系统图、接线图74AP2Back-up server roo
9、m hall 1390-01-60-01 备用服务器房门厅1Refer to systematic drawings and wiring drawings见配电箱系统图、接线图94ALE2Back-up server room hall 1390-01-60-01 备用服务器房门厅1Refer to systematic drawings and wiring drawings见配电箱系统图、接线图10EPS(30KW)Back-up server room hall 1390-01-60-01 备用服务器房门厅1Refer to systematic drawings and wiring
10、 drawings见配电箱系统图、接线图11Exhaust fan control box in back-up server room备用服务器室排风机控制箱Back-up server room hall 1390-01-60-01 备用服务器房门厅1Refer to systematic drawings and wiring drawings见配电箱系统图、接线图12UPSBack-up server room hall 2390-01-61-01 备用服务器房门厅2Refer to systematic drawings and wiring drawings见配电箱系统图、接线图1
11、34ALE2Back-up server room hall 2390-01-61-01 备用服务器房门厅2Refer to systematic drawings and wiring drawings见配电箱系统图、接线图144AL8Back-up server room hall 2390-01-61-01 备用服务器房门厅2Refer to systematic drawings and wiring drawings见配电箱系统图、接线图154AP3Lobby room390-01-80-01 休息室Refer to systematic drawings and wiring dr
12、awings见配电箱系统图、接线图164AL4Lobby room390-01-80-01 休息室Refer to systematic drawings and wiring drawings见配电箱系统图、接线图174AL5FM factroy490-01-01-01 FM车间Refer to systematic drawings and wiring drawings见配电箱系统图、接线图184AP4Boiler house490-01-20-01锅炉房Refer to systematic drawings and wiring drawings见配电箱系统图、接线图19XH1Boi
13、ler house490-01-20-01锅炉房Refer to systematic drawings and wiring drawings见配电箱系统图、接线图20Soft water control box软化水控制箱Boiler house490-01-20-01锅炉房Refer to systematic drawings and wiring drawings见配电箱系统图、接线图214AL6Boiler house490-01-20-01锅炉房Refer to systematic drawings and wiring drawings见配电箱系统图、接线图224ALE3Fi
14、re protection pump house490-01-50-01 消防泵房Refer to systematic drawings and wiring drawings见配电箱系统图、接线图234AT1Fire protection pump house490-01-50-01 消防泵房Refer to systematic drawings and wiring drawings见配电箱系统图、接线图244AT2Fire protection pump house490-01-50-01 消防泵房Refer to systematic drawings and wiring dra
15、wings见配电箱系统图、接线图25PS1 Fire protection pump house490-01-50-01 消防泵房Sprinkler pump control box, Refer to systematic drawings and wiring drawings喷淋泵控制箱 见配电箱系统图、接线图26WY1 Fire protection pump house490-01-50-01 消防泵房Sprinkler pump control box, Refer to systematic drawings and wiring drawings喷淋泵控制箱 见配电箱系统图、接
16、线图27WY2 Fire protection pump house490-01-50-01 消防泵房Fire protection control box, Refer to systematic drawings and wiring drawings消防稳压泵控制箱 见配电箱系统图、接线图28XF1 Fire protection pump house490-01-50-01 消防泵房Fire protection control box, Refer to systematic drawings and wiring drawings消防泵控制箱 见配电箱系统图、接线图29QW Fir
17、e protection pump house490-01-50-01 消防泵房Submersible pump control box, Refer to systematic drawings and wiring drawings潜污泵控制箱 见配电箱系统图、接线图30PS2Fire protection pump house490-01-50-01 消防泵房Diesel sprinkler pump control box, Refer to systematic drawings and wiring drawings柴油喷淋泵控制箱 见配电箱系统图、接线图31XF2Diesel p
18、ump house490-01-30-01 柴油泵房Diesel fire protection pump control box, Refer to systematic drawings and wiring drawings柴油消防泵控制箱 见配电箱系统图、接线图334AL7490-01-60-01 Room for future 490-01-60-01 预留房Refer to systematic drawings and wiring drawings见配电箱系统图、接线图344ALE4Generator room490-01-70-01 发电机房Refer to systemat
19、ic drawings and wiring drawings见配电箱系统图、接线图35AL04Western-style food making area030-01-81-01 西餐制作区Refer to systematic drawings and wiring drawings见配电箱系统图、接线图36AL04-1Canteen030-01-70-01 厨房Refer to systematic drawings and wiring drawings见配电箱系统图、接线图37AL04-2Ventilator room030-02-70-01 通风机房Refer to systema
20、tic drawings and wiring drawings见配电箱系统图、接线图38AL04-3Canteen030-01-70-01 厨房Refer to systematic drawings and wiring drawings见配电箱系统图、接线图39KTJ1Ventilator room030-02-70-01 通风机房Refer to systematic drawings and wiring drawings见配电箱系统图、接线图40AL03Techincal room020-01-10-01 技术室Refer to systematic drawings and wi
21、ring drawings见配电箱系统图、接线图41ATMTechincal room020-01-10-01 技术室Refer to systematic drawings and wiring drawings见配电箱系统图、接线图42ALTechincal room020-01-10-01 技术室Refer to systematic drawings and wiring drawings见配电箱系统图、接线图43AP5Logistics Building配货区Refer to systematic drawings and wiring drawings见配电箱系统图、接线图44AP
22、6Logistics Building配货区Refer to systematic drawings and wiring drawings见配电箱系统图、接线图45AP7Logistics Building配货区Refer to systematic drawings and wiring drawings见配电箱系统图、接线图46AP8Logistics Building配货区Refer to systematic drawings and wiring drawings见配电箱系统图、接线图47AL1-8Logistics Building配货区Refer to systematic d
23、rawings and wiring drawings见配电箱系统图、接线图48AL1-9Logistics Building配货区Refer to systematic drawings and wiring drawings见配电箱系统图、接线图49AL1-9aLogistics Building配货区Refer to systematic drawings and wiring drawings见配电箱系统图、接线图50AL1-10Logistics Building配货区Refer to systematic drawings and wiring drawings见配电箱系统图、接线
24、图51AL1-10aLogistics Building配货区Refer to systematic drawings and wiring drawings见配电箱系统图、接线图52AC15Logistics Building配货区Refer to systematic drawings and wiring drawings见配电箱系统图、接线图53AC23Logistics Building配货区Refer to systematic drawings and wiring drawings见配电箱系统图、接线图54AC24Logistics Building配货区Refer to sy
25、stematic drawings and wiring drawings见配电箱系统图、接线图55AC32Logistics Building配货区Refer to systematic drawings and wiring drawings见配电箱系统图、接线图56AC33Logistics Building, air conditioner配货区 空调机Refer to systematic drawings and wiring drawings见配电箱系统图、接线图57AC34Logistics Building, air conditioner配货区 空调机Refer to sy
26、stematic drawings and wiring drawings见配电箱系统图、接线图58AC35Logistics Building, air conditioner配货区 空调机Refer to systematic drawings and wiring drawings见配电箱系统图、接线图59AL02Office area400-02-70-01 办公区Refer to systematic drawings and wiring drawings见配电箱系统图、接线图60AL02-1Office area400-02-70-01 办公区Refer to systemati
27、c drawings and wiring drawings见配电箱系统图、接线图61AL02-2Office area400-02-70-01 办公区Refer to systematic drawings and wiring drawings见配电箱系统图、接线图62AL01-1Office area400-02-70-01 办公区Refer to systematic drawings and wiring drawings见配电箱系统图、接线图63AL01-2Office area400-02-70-01 办公区Refer to systematic drawings and wir
28、ing drawings见配电箱系统图、接线图64AL3Office area400-02-70-01 办公区Refer to systematic drawings and wiring drawings见配电箱系统图、接线图65AP3-1Grid 10 on Technical Gallery设备平台 10轴Refer to systematic drawings and wiring drawings见配电箱系统图、接线图66AP3-3Grid 10 on Technical Gallery设备平台 10轴Refer to systematic drawings and wiring d
29、rawings见配电箱系统图、接线图67AC3-1Grid 10 on Technical Gallery设备平台 10轴Refer to systematic drawings and wiring drawings见配电箱系统图、接线图68N-FCGrid 10 on Technical Gallery设备平台 10轴Refer to systematic drawings and wiring drawings见配电箱系统图、接线图69N-AHUGrid 13 on Technical Gallery设备平台 13轴Refer to systematic drawings and wir
30、ing drawings见配电箱系统图、接线图70AL1-2Grid 13 on Technical Gallery设备平台 13轴Refer to systematic drawings and wiring drawings见配电箱系统图、接线图71AL3-1Grid 13 on Technical Gallery设备平台 13轴Refer to systematic drawings and wiring drawings见配电箱系统图、接线图72AP1Grid 15 on Technical Gallery设备平台 15轴Refer to systematic drawings and wiri