30万吨某污水处理厂设计(论文计算图纸)
2.3.4初沉池、二沉池.......................................................................142.3.5曝气池.......................................................................................142.3.6接触池.......................................................................................152.3.7计量槽.......................................................................................162.3.8浓缩池.......................................................................................162.3.9消化池.......................................................................................162.3.10污泥脱水.................................................................................173污水处理系统工艺设计.......................................................................173.1格栅的计算.....................................................................................173.1.1粗格栅.......................................................................................173.1.2格栅的计算...............................................................................183.1.3选型...........................................................................................213.2泵房.................................................................................................213.2.1泵房的选择...............................................................................213.2.2泵的选择及集水池的计算.......................................................213.2.3扬程估算...................................................................................223.3细格栅.............................................................................................223.3.1细格栅的计算:
.......................................................................223.3.2格栅的计算...............................................................................233.3.3选型...........................................................................................253.4沉砂池的计算.................................................................................263.4.1池体计算...................................................................................263.4.2沉砂室尺寸计算.......................................................................27
2
3.4.3排砂...........................................................................................293.4.4出水水质...................................................................................303.5初沉池.............................................................................................303.5.1池体尺寸计算...........................................................................303.5.2中心管计算...............................................................................333.5.3出水堰的计算...........................................................................343.5.4集配水井计算...........................................................................353.5.5出水水质...................................................................................353.5.6选型...........................................................................................363.6曝气池.............................................................................................363.6.1池体计算...................................................................................363.6.2曝气系统设计与计算...............................................................393.6.3供气量.......................................................................................403.6.4空气管道系统计算...................................................................433.6.5空压机的选择...........................................................................463.6.6污泥回流系统...........................................................................463.7二沉池.............................................................................................473.7.1池体尺寸计算...........................................................................473.7.2中心管计算...............................................................................503.7.3出水堰的计算...........................................................................513.7.4集配水井计算...........................................................................513.7.5出水水质...................................................................................533.7.6选型...........................................................................................533.8接触池.............................................................................................53
3
3.8.1接触池尺寸计算.......................................................................533.8.2加氯间.......................................................................................543.9计量槽.............................................................................................554污泥的处理与处置..............................................................................554.1污泥浓缩池....................................................................................554.2污泥消化池....................................................................................594.2.1一级消化池池体部分计算......................................................594.2.2一级消化池池体各部分表面积计算......................................614.2.3二级消化池...............................................................................624.3贮气柜.............................................................................................624.4污泥控制室....................................................................................634.4.1污泥投配泵的选择...................................................................634.4.2污泥循环泵...............................................................................644.4.3污泥控制室布局.......................................................................654.5脱水机房.........................................................................................654.5.1采用带式压滤机除水...............................................................654.5.2选型...........................................................................................664.6事故干化场....................................................................................664.7压缩机房.........................................................................................675污水处理厂总体布置..........................................................................675.1平面布置.........................................................................................675.1.1平面布置的一般原则...............................................................675.1.2平面布置................................................................................67
4
5.2污水处理厂高程布置.....................................................................685.2.1高程布置原则...........................................................................685.2.2污水污泥处理系统高程布置...................................................69总结......................................................................................................70参考文献..................................................................................................72致谢.....................................................................错误!
未定义书签。
附录......................................................................................................73
5
1设计任务及概况
1.1设计任务及依据1.1.1设计任务
30万吨城市污水处理厂初步设计1.1.2设计依据及原则1.1.2.1设计依据
《给水排水工程快速设计手册》1-5,给排水设计规范,《污水处理厂工艺设计手册》,《三废设计手册废水卷》。
1.1.2.2设计原则
(1)执行国家关于环境保护的政策,符合国家地方的有关法规、规范和标准;
(2)采用先进可靠的处理工艺,确保经过处理后的污水能达到排放标准;
(3)采用成熟、高效、优质的设备,并设计较好的自控水平,以方便运行管理;
(4)全面规划、合理布局、整体协调,使污水处理工程与周围环境协调一致;
(5)妥善处理污水净化过程中产生的污泥固体物,以免造成二次污染;
(6)综合考虑环境、经济和社会效益,在保证出水达标的前提下,尽量减少工程投资和运行费用。
6
1.1.3设计范围
设计二级污水处理厂,进行工艺初步设计。
1.2设计水量及水质1.2.1设计水量
污水的平均处理量为Q平=30104m3/d=12500m3/h=3.47m3/;污水的最大处理量为Qma某36.3104m3/d=15125m3/h=4.2m3/;污水的最小处理量为Qmin2.48104m3/d10331m3/h2.87m3/。
日变化系数取K日为1.1,时变化系数取K时为1.1,总变化系数取K总为1.21。
1.2.2设计水质
设计水质如表1.1所示。
表1.1设计水质情况
项目入水(mgL)出水(mgL)去除率(%)BOD5SS200≤2587.5200≤30851.3.3设计人口
(1)按SS浓度折算:
NCQa
式中:
C——废水中SS浓度为200mg/L
Q——平均日污水量为30万m3/da——每人每日SS量,一般在35-55/人g.d,
7
则:
N20030120万人50
(2)按BOD5浓度折算NBOD5CBOD5QaBOD55
式中:
CBOD——废水中BOD5浓度为200mg/L
Q——平均日污水量为30万m3/d
aBOD5——每人每日BOD量,一般在20-35/人gd,取30/
人g.d,
则:
N200302万人00302工艺设计方案的确定
2.1方案确定的原则
该污水处理厂厂址位于某市西北部。
厂址所在地区地势比较平坦。
污水处理厂所在地区地面平均标高为40.50米。
地震基本烈度为7度。
8
某市位于东经123,北纬42属温带半湿润季风型大陆性气候,多年平均温度7.4C,冬季长,气候寒冷,多偏北风,最冷月(一月)平均气温-12.7C;夏季多偏南风,非采暖季节主导风向为东南风,最热月(七月)平均气温24.6C。
降雨集中在7-8月,约占全年降雨的50%,多年平均降雨量75毫米。
地面冻结深度1.2-1.4米。
2.2.3可行性方案的确定
城市污水的生物处理技术是以污水中含有的污染物作为营养源,利用微生物的代谢作用使污染物降解,它是城市污水处理的主要手段,是水资源可持续发展的重要保证。
城市二级污水处理厂常用的方法有:
传统活性污泥法、AB法、氧化沟法、SBR法等等。
下面对传统活性污泥法和SBR法两种方案进行比较(工艺流程见图2.1,2.2),以便确定污水的处理工艺。
传统活性污泥法的方案特点:
(1)工艺成熟,管理运行经验丰富;
(2)曝气时间长,吸附量大,去除效率高90~95%;(3)运行可靠,出水水质稳定;(4)污泥颗粒大,易沉降;(5)不适于水质变化大的水质;(6对氮、磷的处理程度不高;
(7)污泥需进行厌氧消化,可以回收部分能源;SBR法的方案特点:
(1)处理流程简单,构筑物少,可不设沉淀池;
9
(2)处理效果好,不仅能去除有机物,还能有效地进行生物脱氮;(3)占地面积小,造价低;(4)污泥沉降效果好;
(5)自动化程度高,基建投资大;(6)适合于中小水量的污水处理工艺
从上面的对比中我们可以得到如下结论:
从工艺技术角度考虑,普通曝气法和SBR法出水指标均能满足设计要求。
但是,SBR法对自动化控制程度要求较高且处理规模一般小于10万立方米/天,这与实际情况不符(污水厂自动化水平不高且本设计规模属大型污水处理厂)。
故普通曝气法更适合于本设计对污水进、出水水质的要求(对P、N去除要求不高,水质变化小),故可行性研究推荐采用普通曝气法为污水处理厂的工艺方案。
2.2.4工艺流程方案的确定
SBR
法是间歇式活性污泥法或序批式活性污泥法的简称,相对于
传统活性污泥法,SBR法工艺是一种正处于发展、完善阶段的技术,因为从SBR法的再次兴起直至应用到今天只不过十几年的历史,许多研究工作刚刚起步,缺乏科学的设计依据和方法以及成熟的运行管理经验。
SBR法现阶段在基础研究方面、实践应用方面、工程设计方面仍存在问题。
例如:
SBR的适宜规模、合理的设计和运行参数的选择,建立完整的运行维护和管理方法,运行模式的选择于设计方法脱节等等。
污水工艺流程的确定主要依据污水水量、水质及变化规律,以及对出水水质和对污泥的处理要求来确定。
本着上述原则,本设计选
10
传统活性污泥法作为污水处理工艺。
鼓风机房污水粗格栅泵房细格栅沉砂池贮砂池初沉池曝气池回流加氯间二沉池接触池计量槽出水回流污泥泵房沼气柜浓缩池污泥控制室一级消化池二级消化池脱水机房干泥外运事故干化场
图2.1传统活性污泥法
鼓风机房污水粗格栅泵房细格栅沉砂池加氯间初沉池曝气池加氯间接触池计量槽沼气柜出水浓缩池污泥控制室一级消化池二级消化池脱水机房干泥外运事故干化场
图2.2SBR法
11
2.2.5污泥处理工艺流程
根据上述原则,决定污泥采用中温厌氧二级消化,再经机械脱水后运出厂外处置,这时的污泥已基本实现了无害化,不会对环境造成二次污染。
污泥消化产生的沼气用于烧锅炉和发电,热量可满足消化池污泥加热需要,电能供本厂使用。
2.3主要构筑物的选择2.3.1格栅
格栅用以去除废水中较大的悬浮物、漂浮物、纤维物质和固体颗粒物质,以保证后续处理单元和水泵的正常运行,减轻后续处理单元的负荷,防止阻塞排泥管道。
本设计中在泵前和泵后各设置一道格栅。
泵前为粗格栅,泵后为弧形细格栅。
由于污水量大,相应的栅渣量也较大,故采用机械格栅。
栅前栅后各设闸板供格栅检修时用,每个格栅的渠道内设液位计,控制格栅的运行。
格栅间配有一台螺旋输送机输送栅渣。
螺旋格栅压榨输送出的栅渣经螺旋运输机送入渣斗,打包外运。
粗格栅共有三座,两座使用,一台备用。
栅前水深为1.4m,过栅流速0.9m/,栅条间隙为50mm,格栅倾角为60°。
12
细格栅有四座,三台使用,一台备用。
栅前水深为1.05m,过栅流速0.9m/,栅条间隙为20mm,格栅倾角为60°。
2.3.2泵房
考虑到水力条件、工程造价和布局的合理性,采用长方形泵房。
为充分利用时间,选择集水池与机械间合建的半地下式泵房,这种泵房布置紧凑,占地少,机构省,操作方便。
水泵及吸水