MOLEX Factor.docx
《MOLEX Factor.docx》由会员分享,可在线阅读,更多相关《MOLEX Factor.docx(12页珍藏版)》请在冰豆网上搜索。
MOLEXFactor
MOLEXFactory莫仕工厂
Beijing北京
QUESTIONNAIRE问卷调查
CONTENTS目录
l.GENERALPLANNINGREQUIREMENTS综合规划要求
2.BUILDING建筑
3.MEPINSTALLATION设备
2.1General综合
2.2ACMVInstallationACMV设备
2.3ElectricalInstallation电气设备
2.4FireServiceInstallation消防设备
2.5Plumbing&DrainageInstallation给排水设备
2.6Others其他
4.PROCESS/CONTROL程序/管理
5.LONGLEADITEMS前期
MolexQuestionnaireIssueNo1
1.GENERALPLANNINGREQUIREMENTS
Item
Description
Advice/CommentfromMolex
1.1
TotalSiteArea:
16.360㎡、
Max.PermissibleGFA:
19639㎡
Min.PermissibleGFA:
98196㎡
PleaseadviseGF.\requirementforPhaseI
Permissibleplotratio:
1.2
Permissiblefootratio:
0.6
Hip:
4000㎡
Molex:
4000㎡
1.2
Pleaseadvisetypeofbuildingpreferred(RCconstruction/structuralsteel)
Structuralsteel
1.3
Pleaseadviseapprox.GFArequirementforfacilitiesandfunctionalareas
-Factory
-Lab
-CleanRoom
-Storage
-Office
-Canteen
-OthersAreas
-Reception
-ITRoom
-ChangingRoom
-MeetingRoomBoardRoom
-SmokingRoom
-BuildingControlRoom
-RecreationFacilities
Yes
Notfix
N/A
Yes
Yes
Yes
Yes
Yes
Yes
Yes
N/A
N/A
N/A
1.4
Pleaseadviseifthereispreferenceforsinglelevelormultilevelfactorybuilding.
Two-levelbuilding
1.5
Anyparticularrequirementfor
-DangerousGoodStorage
-RefuseDisposal
N/A
1.6
Carparksrequirement
-Bicycle
-PrivateCar
-BusParking
-Loading&UnloadingBays
Yes
Yes
Notfix
Yes
MolexQuestionnaireIssueNo.1
1.GENERALPLANNINGREQUIREMENTS(CONT'D)
Item
Description
Advice/CommentfromMolex
1.7
Anypreferencetotheexternalfinishes
-Tiles
-Aluminiumcladding
-Plastering
Anychoice/selectioncriteriaforuseofmaterial?
colour?
Archiecttopropose
1.8
GuardHouserequirements:
IstoilettobeproviedaspartofGuardHouse?
(Note:
GuardHouseWillhouseFirePanel/Securitycontrolequipmentandshallbe24hrmanned.)
Yes
MolexQuestionnaireIssueNo.1
2.BUILDING
Item
Description
Advice/CommentfromMolex
2.1
Floortofloorheightandfloorloading.
Location
Clear
headroom
Floorloading
Molding5.2m1.0T/㎡
Assemble2.8m0.75T/㎡
2.2
Preferredcolumnspacingandcolumnfreespan.
Aswideaspossible
2.3
Isexternalwindowessentialforproductionarea
Yes
2.4
Internalgantryrequirements(infactoryarea)
Formolding,capacity1T
2.5
SecurityAccessrequirements.
2.6
ParticularfIoorfinishesrequirements
Production:
EpoxyFloor(ESD)
Office:
Carpet/vinyltile
Cleanroom:
Tile
Others
2.7
Population
Workers
Male:
Female:
Office
Male:
Female:
2.8
No.ofshiftsandno.ofhours/shift
Factory:
24hoursaday.sevendaysaweek
Office:
5daysaweek
MolexQuestionnaireIssueNo.1
3.MEPINSTALLATION(CONT'D)
3.1General
Item
DeseriPtion
Molex
PhaseⅠ
PhaseⅡ
3.1.1
Power(KVA)
800KVA
L600KVZ
3.1.2
Telephone
-no.ofPairs
-typeofservices
l0
3.1.3
Gassupply
3.1.4
Potablewater
3.1.5
Seweragedischarge
Wastetreatment
3.1.6
Irrgation
3.1.7
WillseparateenergymetersberequiredbyHip/Molex?
Yes
MolexQuestionnaireIssueNo.1
3.MEPINSTALLATION(CONT'D)
3.2HVAC(CONT'D)
Item
Description
Advice/CommentfromMolex
3.2.1
Heating/Cooling,requirementsfordifferentareas
Yes
3.2.2
Doesanyequipmentneedwatercooling;Ifso,Please
givedetails
Yes.moldingM/C.andauxiliaryequipment
3.2.3
Anyparticularexhaustandventilationrequirement
(e.g.dustexhaust/extraction)
NA
3.2.4
Adviceonspecialistservices
-steam
-compressedair
-vacuum
NA
Compressedair.yes.
NA
3.2.5
Airqualityrequirements
Normal
3.2.6
Anyrestrictiononairvelocitieswithinthespace
relativetooperationalrequirements
NA
3.2.7
Anynoisegeneratingequipmentandnoiseabatement
requirements
NA
3.2.8
PleaselistareawhereA/Cand/orHeatingisnot
required
Plantfacilitiesroom(s)
3.2.9
PleaselistareawithRHandtemperaturerequirements
(e.g.computerroom).Whatarethelimits?
.
RH<55~60%(summer,22~24'C)
RH<35~55%(winter,18~22'C)
T:
22'Ccool20'Cheating
3.2.10
Anypressureregimerequirements?
Notsure
3.2.11
Pleaseprovidedetailsofcleanroomstandard
requirements
NA
3.2.12
AnyparticularrequirementforofficeA/Cdesign(split
unit/FCU/Allairsystem)?
Is4-pipesystempreferred
Notfix
3.2.13
AnypowersupplybackuprequiredforHVACequipment
Notsure
MolexQuestionnaireIssueNo.1
3.MEPINSTALLATION(CONT'D)
3.2HVAC(CONT'D)
Item
Description
Advice/CommentfromMolex
3.2.14
Anypreferencetothechoiceofcooling/heating
system
Cooling-electric
Heating-gas
3.2.15
Anyparticularrequirementsforredundancyofplant
duetooperationandmaintenanceconsiderations?
Notfix
MolexQuestionnaireIssueNo.1
3.MEPINSTALLATION(CONT'D)
3.3Electrical
Item
Description
Advice/CommentfromMolex
3.3.1
BDApowersupplyvoltageisat380/220v-Isthereanyparticularvoltagerequired?
Ifso,pleaseadvisedetails.
(11KVSubstation/transformerwillberequiredasstandard.)
Wewillpreferhighervoltagestepdown
3.3.2
Emergencypowergeneratorwillnotbeprovided,anycomment?
("Alternate”supplywillbesuppliedforessential
Servicese.g.firefightingandlifesafetyequipment.)
Donotneed
3.3.3
PleaseadviseUPSrequirement,ifany.
5KVA2-4hr.forMIS
3.3.4
AnyparticulardesignStandardonlighting;otherwise,internationalstandardwillbeadopted.
Molding600lux
Assembly800lux
Office500lux
3.3.5
Batterylightingisproposedatstrategiclocations,anycomment?
ShouldcomplywiththelocalregulatoryandNFPA13requirements
MolexQuestionnaireIssueNo.1
3.MEPINSTALLATION(CONT'D)
3.4FireService
Item
Description
Advice/CommentfromMolex
3.4.1
Pleaseadviseanyspecialrequirementsrelativeto:
a)FireCodestobecompliedwith
b)Sprinklers
c)Smokeextractsystems
d)Evacuationprocedures
e)Useoffireresistantretardantmaterials.
Otherwise.PRCstandardcodewillbeadopted.
1)NFPA13.Fireprotectionstandard
2)PRCStdcodeforhose-reel.andfirehydrant
3.4.2
Pleaseadvisethetypeofmaterial/goods(with
chemicalname)tobestoredinD.G.Store(ifany)
Plasticresin.goodsetc.
3.4.3
AnyspecialInsurancerequirements.i.e.
-Standardofdesign
-Choiceselectionofmaterial
-InstallationStandard
NFPA13,asdirectedbycorporate.
3.5PlumbingandDrainageServicesInstallation
Item
Description
Advice/CommentfromMolex
3.5.1.
IsthereaneedforwastetreatmentbyMolex?
Ifso,
whetherundergroundoraboveground,gravityormechanicaltype
No
3.5.2.
Pleaseadviseofanywaterpointsorequipmentrequiringhotwatersupply
Toiletsonly
3.5.3.
Pleaseprovidelistofallequipmentthatrequirededicateddrainageprovisions
NA
3.5.4.
Anyeye-washrequired?
NA
MolexQuestionnaireIssueNo.1
3.MEPINSTALLATION(CONT'D)
3.6Others
Item
Description
Advice/CommentfromMolex
3.6.1.
Pleaseconfirmliftingrequirementsinfactoryarea.
Onetonoverheadcraneformoldingarea
3.6.2.
Pleaseadviseifgoodsliftisrequiredformulti-storeyfactory?
Ifso.whatsizeandcapacity?
Notfix
3.6.3
Pleaseadviseifforklifttruckswillbeused;anybattery
chargingareasrequired?
Notfix
3.6.4
Securitysystem.comprising
-DoorContac
-CCTVcamera
-CardAccess
-CentralMonitoringPanel
willbeproposed.Pleasecomment./Pleasealsoadviseanyocherparticularsecurityrequirements
Yes
3.6.5
ClientwillprovideITcabling,telephoneserver/PABX/Telephoneconfirm.
No
MolexQuestionnaireIssueNo1
4.PROCESS/CONTROL
Item
Description
Advice/CommentfromMolex
4.1
InadditiontothegeneralrequirementsdescribedinSection2and3,pleaseprovideonmark-updrawingsallprocessinterfacewiththebasebuildingMEPinstallations.i.e.
-Powersupply
-CompressedAir/Vacuum
-ProcessSupply/Exhaust
-ProcessWater
-WaterTreatment
-WasterWaterTreatment
Notfix
4.2
Materialspecificationforproductionprocessinterface
Notfix
MolexQuestionnaireIssueNo1
5.LONGLEADITEMS
Item
Description
Advice/CommentfromMolex
5.1
Preorderingisrecommendedfor
-CleanRoomEquipment
-CompressedAir/VacuumEquipment
-UPS
-D.I.WaterEquipment(ifrequired)
-WaterTreatment/WasterWaterTreatmentEquipment
-Non-standardequipmentwhichhasalongdeliveryperiod
Clientwillconsideratalaterstage