[单项选择题]

1、A customer needs to share large files across three Power Systems servers to create and validate complex automotive designs.What IBM solution should be recommended?

()

A.PowerHA SystemMirror

B.Peer to Peer Remote Copy

C.General Parallel File Systems

D.Parallel Operating Environment

参考答案:

C

[单项选择题]

2、A customer is interested in PS700 Blade with 32GB of memory.  The Blade will have 4 partitions sharing resources equally. They want the least expensive operating system that supports Live Partition Mobility.  Which of the following AIX Editions address their requirement?

()

A.Basic

B.Express

C.Standard

D.Enterprise

参考答案:

A

[单项选择题]

3、An IT director needs to deploy 3 partitions, each using dedicated internal boot disk.Which system will support the customer requirement using the least amount of rack space?

()

A.Power 770 servers

B.Power 750 servers

C.Power 755 servers

D.Power 720 servers

参考答案:

A

[单项选择题]

4、A customer has two Power 770 systems with 4 enclosures each.  Thirty two cores and 1TB of memory are activated on each system.  Each system has 3 database partitions and each partition has 10 cores and 300GB of memory.  Which solution will provide automated recovery of unplanned outages at least cost?

()

A.Purchase PowerVM Enterprise Edition.Use System Director to automate Live Partition Mobility to recover from partition failure

B.Create additional shared processor partitions as standby nodes.Use PowerHA SystemMirror to activate and use CoD resources when a failover occurs

C.Purchase an additional 32-core Power 750 with PowerHA SystemMirror Standard Edition.Use the new system as standby node with the XD component of PowerHA

D.Purchase an additional Power 770 system.Locate production and standby database partitions on each system.Use DB2 pureScale to provide automated partition monitoring and failover

参考答案:

B

[单项选择题]

5、A Power Systems customer would like to upgrade their HMC to the latest version of software tosupport a new hardware feature.What resource will help identify dependencies for firmware and system software for their upgrade?

()

A.ITSO Redbooks

B.Facts and Features

C.System Planning Tool

D.Fix Level Recommendation Tool

参考答案:

D

[单项选择题]

6、What operating system is required to support Active Memory Expansion?

()

A.AIX 6.1

B.AIX 5.3

C.Red Hat 10

D.SUSE LINUX 11

参考答案:

A

[单项选择题]

7、An AIX 5.3 customer has a Power 780 in a 2-meter (T42) rack. This rack needs to be moved six inches (15cm) to allow under-floor access.  What preparation for moving the rack will result in the least disruption to end-users?

()

A.Initiate LPAR fallover to backup systems.

B.Use Live Partition Mobility to move the LPARs to other systems.

C.Use Live Application Mobility to move critical applications to alternate systems.

D.Back up all LPARS to a NIM server and restore them to other LPARs on other systems.

参考答案:

B

[单项选择题]

8、A financial company is auditing to ensure their systems are safe from external attack.They have just purchased new Power 750 servers.Which features of AIX 6.1 will help in the auditing process?

()

A.IPSec and Kerberos Authentication

B.Secure By Default and AIX Security Expert

C.Trusted Execution and Role Based Access Control

D.First Failure Data Capture and Storage Protection Keys

参考答案:

B

[单项选择题]

9、A customer has a new Power 720 with PowerVM Standard Edition.  They plan to migrate their single-partition POWER5 550 to the new Power 720.  How can the customer migrate from the POWER5 550 to the Power 720 with minimal effort and down time?

()

A.Perform Live Partition Mobility between the two systems.

B.Move the boot disks from the old system to the new system.

C.Use Tivoli Storage Manager to back up the POWER5 550 and restore on the Power 720.

D.Upgrade AIX to the latest level on the POWER5 550 and clone using the mksysb command.

参考答案:

D

[单项选择题]

10、A customer is moving from an HP-UX environment to an AIX environment. They will be producing a master image of the environment and will need to install it into hundreds of LPARs and WPARs. Which AIX tool will be of most use in this case?

()

A.NIM

B.smit

C.SUMA

D.netboot

参考答案:

A

[单项选择题]

11、Which of the following is a correct statement about Workload Partitions (WPARs)?

()

A.WPARs use dedicated cores and shared memory.

B.WPARs are restricted to using dedicated resources.

C.WPARs share the resources of a single AIX instance.

D.WPARs use shared cores, memory, and dedicated network adapters.

参考答案:

C

[单项选择题]

12、What advantages do WPARs have over LPARs?

()

A.Security is isolated by the HMC

B.Support Live Partition Mobility

C.Operating system faults are isolated

D.Reduced system management during upgrades

参考答案:

D

[单项选择题]

13、A customer has multiple application servers which create one process for each connected user.  All users share the same AIX environment.What is a benefit of using WPARs in this environment?

()

A.WPARs give more controls for resource management than the traditional AIX operating system tools.

B.WPARs support Live Application Mobility which can be used to balance user processes acrosssystems.

C.WPARs each have a copy of the AIX kernel, offering better availability than a system without WPARs.

D.WPARs provide the ability to apply fixes specific for each environment, enabling the customer to create specialized application servers.

参考答案:

B

[单项选择题]

14、A Power 720 has AIX 6.1 and Linux partitions.During normal workloads there is more than enough memory available to the LPARs.  During month-end processing one partition becomes memory constrained.     What can help overcome this situation?

()

A.Active Memory Sharing (AMS)

B.Active Memory Expansion (AME)

C.Integrated Virtual Memory (IVM)

D.Memory Capacity on Demand (CoD)

参考答案:

A

[单项选择题]

15、A customer would like to consolidate multiple database workloads to a single server to reduce TCO.What is the effect of PowerVM on TCO?

()

A.Reduces SAN cost

B.Reduces network cost

C.Reduces administration costs

D.Reduces software licensing cost

参考答案:

C

[单项选择题]

16、A customer has a requirement to eliminate single points of failure for an application.  They have allocated one Ethernet adapter to each VIO server on the system.Which features of PowerVM and AIX will support the customer requirement?

()

A.Etherchannel and trunking

B.Network Interface Backup and Etherchannel

C.Shared Ethernet Adapter (SEA) Failover and Etherchannel

D.Network Interface Backup and Shared Ethernet Adapter failover

参考答案:

D

[单项选择题]

17、A proposed server architecture includes SAN LUNs being presented to client LPARs using shared HBAs to reduce infrastructure cost. The customer requires minimal management efforts for the dual VIO Servers.  Which technology is recommended for this proposal?

()

A.NPIV

B.vSCSI

C.Arbitrated loop

D.Converged adapter

参考答案:

A

[单项选择题]

18、After purchasing the Active Memory Expansion (AME) Enablement Feature,what tasks must be completed before AME can be used?

()

A.Enable using active partition properties with DLPAR

B.Enter the activation key via the AIX 6.1 command line and reboot AIX

C.Enter the activation key via the HMC,power cycle the managed system and start the LPAR

D.Enter the activation key via the HMC,modify the partition profileand restart the LPAR

参考答案:

B

[单项选择题]

19、A Power 770 customer needs to add additional I/O adapters.  There is no room for the cards, so an I/O drawer must be added.What resource will help identify supported I/O drawers and the maximum number of drawers permitted per loop?

()

A.I/O Planning Guide

B.Power Systems data sheet

C.Power Systems Facts and Features

D.Run FLRT to recommend I/O features

参考答案:

C

[单项选择题]

20、An electrician needs to know what type of receptacle is required.What is the most up-to-date resource to identify the plug type for the feature code ordered?

()

A.Infocenter

B.ITSO Redbooks

C.Facts and Features

D.System Planning Tool

参考答案:

A

[单项选择题]

21、Which of the following virtualization options are unique to AIX and PowerVM compared to other UNIX based offerings?

()

A.Software virtualization through PowerVM and hardware virtualization through IBM Systems Director.

B.Hardware virtualization through Workload Partitions (WPARS) and software virtualization through PowerVM.

C.Software virtualization through Workload Partitions (WPARS) and hardware virtualization through PowerVM.

D.Hardware virtualization through Workload Partitions (WPARS) and software virtualization through IBM Systems Director.

参考答案:

C

更多内容请访问《睦霖题库》微信公众号

[单项选择题]

22、The systems administrator of a large manufacturer has POWER5 and POWER6 servers, each with LPARs running AIX 6.1.  They are running several workloads including SAP, DNS, Oracle, DB2 and WebSphere Application Server, and plan to consolidate onto one POWER7 server.  How can the system administrator determine how much benefit Active Memory Expansion (AME) could provide for the consolidated system?

()

A.Run amepat now on all of the existing LPARs.

B.Run amepat after consolidation on all LPARs.

C.Run amepat now on all existing LPARs running on the POWER6 servers.

D.Run amepat now on all existing LPARs running database applications.

参考答案:

A

[单项选择题]

23、Which of the following is a correct statement about rPerf?

()

A.It can only be used on systems running without partitions.

B.It is relevant for IBM systems running the AIX operating system.

C.It is the main benchmark for sizing systems that will run HPC applications.

D.It has a direct relationship with other benchmarks like TPC-C and SpecjAppServer2004.

参考答案:

B

[单项选择题]

24、A customer has ten RS/6000 Model M80, two pSeries 690 Model 681, five POWER5 510 and two POWER6 560 machines installed and running commercial applications. They want to do a server consolidation study in order to replace the existing systems with POWER7 systems.What performance metric is re