钻井作业流水账final

钻井作业流水账

FirstSpud/22”Section

1.Afterrigmove,checkwaterpumpsandwatersupplylinesduringequipmentinstallation.Filluptanksw/waterinadvance.Mix1000BBlsspudmud.

2.Afterinstallation,PTcirculatingsystemw/cleanwater.M/UDrillstring.Preparespud-in.

3.BHAforspud-inasfollowed:

BIT+NBRR(withFLOAT+TOTCORing)+SHOCKSUB+1

9.5"DC+STRR+2

9.5"DC+15

s8-1/4"DCS+5"HWDP

4.Drill22”holeto+/-750ft.

5.TheDo’sandDon’ts:

a)Usesinglepumpforfirstspud.Makecirculationbyusingjetcellarthroughdischargelinetoshaleshaker.Establishcirculation.

b)LowWOB,LowRMP(50-60)Lowstks(60-65)forfirst10ft.Thenincreasetooptimumdrillingparametersgradually.Afterdrill1joint,increasetheRPMandpumpstksto105-110RPMand95-100SPM.WOBincreaseswiththeDSweight.MaximumWOBis45-50KLBs.

c)Mostofwellsbeforehadlostcirculationwhiledrilling22”section.Iflosscirculationoccurs,continuedrillingwithwater&75*2SPM.Pump15-20HIVISpilleveryjointinordertocarrysands.

d)AverageROPshallbe30ft/hduringthissection.Mostofwellsbeforehadseverebitbouncing.Optimumdrillingparametersiscritical.

6.Bereadyforrunning18-5/8”CSG:

a)RemoveCSGprotector.Drift&measureallstands.Cleanthreads.

b)InstallCSGfloatshoeandweld.

c)InstallCSGcentralizers.Oneforeachforfirst5JTs,thenoneforevery3JTs.Installcementbasketonthebottomofthelastthirdjoint.Installonecentralizeraboveandonebelowcementbasket.

d)Preparecasingrunningtools:

slips(21),singlejoint,Btypecasingtong(usedasbackuptong),circulatinghead,Weatherfordcasingtongetc.

e)PrepareDPsusedforISCbasedonCSGlength.CheckandverifyDPcentralizeretc.

7.DrilltoCSGshoedepth,beforePOOH:

a)Pump100BBLsHIVISandcirculate20-30min.

b)Wipertripto9-1/2”DCoutofrotarytable.Ifanyobstruction,reamw/waterandpumpHIVISforcuttingscarrying.

c)Backtobottom.Pump50BBLsHIVIS&circulate(20min).Thenpump75PCFHIVISpilltobottom.

d)Wellsurvey.

8.POOH.L/Dreamer&SS.Don’tfillin.

9.M/UDPs(usedforISC)andrackbackinderrick.

10.RIHsurfacecasing.Checkfloatshoe.Runsomewaterwithfirstcasingatv-doortocheckfloatshoecondition.Threadlock(orusethreadlocker)tofirst3jointsorweldthem.

11.ContinuerunningCSG.M/UcirculatingheadattheV-doorinadvanceincaseofanyobstruction.

12.AfterrunningCSG,bereadyforcementingjob.ISC(Innerstringcement)isusuallyusedfor18-5/8”CSG.Beforecementing,running5”DP(withISCstinger)intoCSG.InsertISCstingerintofloatshoe.FillupDPandCSGannulusw/water.P/UandpulltheStringeroutoffloatshoe.Checkmudfluidlevelofannulus.Re-stabstinger.M/U411

4”Unionwith4”union

”circulatingsub.Circulate(InnerDPVolume).R/Ucementingline&cement.Afterfinishingpumpingcement,breakout4”unionanddropplug.Ifthereisnocementreturnsatcellar,atopcementjobisrequired.Beforetopcementjob,fillinwellborewithsomeSCMfirst.

13.Wellheadrectificationafter-cementing:

a)Prepare2bars,anchorlugsandwateroutletsforsupportingCSG.

b)Weldlegs,anchorlug,wateroutletsandunions.CutCSG(informForemanfirst).Theseshouldbedonewithin3hours.

17-1/2”Section(二开)

1.Beforespud=in,P/U17-1/2”bit,reamer,bitbreakerandothertoolsontodrillfloor.

2.BHAof17-1/2”sectionshouldbeasfollows:

BIT+NBRR(withFLOAT+TOTCORing)+SS+1Jt9.5"DC+STRR+2Jts9.5"DC+8Jt8-1/4"DCS+JAR+4Jts8-1/4"DCS+12Jts5"HWDP

3.M/UandRIH.Checkandverifythestringtally.

4.Hydro-testcasingwith2000psi.

5.Drillcementplugandfloatshoe.Displacewaterwithmud.

6.Drill17-1/2”holetoTDasfollow:

a)DrillwithlowparameterswhenreamerisoutofCSGshoe.80SPMw/singlepump65-70RPMWOB:

25-30KLBs;Commonparametersshouldbegraduallyincreasedto45-50KLBs,100-110RPM&75*2SPMw/doublepumps.

b)WhenHIGHROP,HIGHTORQUEoccursorcannotreachbottomafterM/UJT.PUMPHIVISandBACKREAM.

c)LCalwaysoccursindrill17-1/2”section.Drillw/waterwhenlosscirculationoccurs.Pump20BBLsHIVISforcarryingsands.

7.Preparationduringdrilling13-3/8”CSG

a)RemoveCSGprotector.Measure,drift&cleantheCSG.

b)M/UFS&FC.FCshouldbeconnectedtothe3rdboxandtackweld.

c)Installcentralizerasfollows:

Fixonecentralizereveryjointforthefirst10JTsunderconditionofLC.Thenoneevery3JTstosurface.Undernormalcondition,1centralizerforfirst5JTs,thenevery3JTstosurface.Fix1centralizerabove&1belowDVPKR.

d)Preparetoolsforrunning13-3/8”CSGasfollows:

13-3/8”CSGElevator,Slip(17pieces),singleelevator,CSGcirculationhead,WeatherfordCSGtong&CSGBushing.

e)M.U/P.U.landingjoint(withflange)&landingbase(onestage/primaryCSGhead)onpiperack.

f)ConnectDVPKRtoCSGasperForemanInstruction.

g)CheckTWO

(2)CAMERON2-1/16”gatevalves.

h)PrepareforN/UBOPandtestingtools.

8.Drill17-1/2”sectiontoCSGpoint:

Thesameprocedurewillbeconductedasthefirstsection:

∙PumpHI-VISpills&CHC.

∙WipertriptoCSGshoe.Backtobottom.

∙Sweepholew/HI-VIS&CHC.SpotHI-VISbeforePOOH.DropTOTCOSurvey.

∙POOH.L.D.Reamer&9-1/2”DC.

9.RunCSGandcementing.

a)BeforerunningCSG,cuttheflowlineof18-5/8”wellheadwiththeheightequaltotheheightbetweentwoflangesonlandingbase(betweenthetopoflandingbaseandbottomflange).Forinstance,theheightofFMCis17.5”toensurethetopflangeoflandingbasewillleveltheground.Cuta4”diameterholebeneaththescarfingformudreturnduringsecondstagecementing.

b)HoldPJSM.ForemansummarizesthecasingrunningproceduresandsomeDos&Don’ts.

c)FillupfirstCSGw/watertocheckfloatshoetoverifyit’sunblocked.ThenrunCSGasprocedure,payattentiontofillupmudandDVPFRposition.

d)AfterCSGrunningtobottom,connectlandingjoint&landingbaseontotheCSGstringonrigfloor.Connectbottomflangeonthelandingbaseto18-5/8”CSG.Extracareshouldbegiventosideoutletsoflandingbase,ensuringtheirdirection/theypoint-E-W.Wheninstallinggatevalve,thehandwheelpointsnorth.ThisisanimmutableruleofSaudiAramco.

e)M/Ucirculationheadinv-doorinadvance.Lineuptocirculateincaseofencounteringdrag.Afterreachingbottom,circulateasrequired(CSGinsidevolume).Connectcementinglines.Preparefirststagecementwithnecessaryhosesandbends.

f)Checkbackflowafterfirststagecementing,dropplug(orbomb),pumpittosetDV.ThenCONTpumpingtoopencirculationport.Prepareforsecondstagecementing.

g)Circulateexcesswater&slurrytopitw/suctionpump.CONTpumpinguntilclearinannulus.Load/releaseclosingplug.DisplaceslurrytocloseDVtool.

Note:

AssigncertainpersontoobservereturningandnotifyDrillerintimetorecordandcalculateremainedreplacementvolumeandreturnedslurry.

10.N/UandTestBOP

a)Aftercementing,weldthebottomflangeoflandingbaseand18-5/8”CSG,blankoff4”port.NippleupBOPs.PrepareP.T.

b)AfternipplingupBOPs,functiontestandRIHtestcup(cuptester).OneortwostandsHWDPbelowcup.Therearetwotypesofcup:

FMCandGRAY.Theusagedependsoncasinghead.

c)Aramcopressureteststandard:

Lowpressure-300psi;highPressure-2500psi(2000psiforannularpreventer).Holdpressurefor5or10min(basedonForemaninstruction).Testannular,manualgatevalvesondrillingspool&HCR.Checkvalveonkilllineside,chokeline,blindram,piperamandcasinghead(w/2000psi),emergencykillline,chokemanifold,upperandlowerKellycock,insideBOP,FOSVetc.

d)Testproceduresandmethods:

Connectpressuretestingtoolsandlinesasperfigure1.Circulateandfillupw/waterabovethecup,thenstartP.T.

Note:

1)Whentestingblindram,backbreaksinglefromthecup,thenpumptestfromchokeline.

2)WhentestingCSGheadw/cuptester,runcupatthe60ftbelowCSGhead,thenpumppressurefromchokeorkillline.

3)UsespecialtestingsubtotestKellycock,insideBOPetc.

4)Whentestingchokemanifold,shoulddofromoutsidetoinside.

5)It’sforbiddentoreleasepressurefromwellheadaytime.

6)Aftercompletionthetesting,fillupthetestingsheet,handoveracopytoforemanwiththepressurecurvechart.TheoriginaldocumentssignedbyForemanshouldbekeptbyToolpusher.

12-1/4”Section(三开)

Drill12-1/4″Hole

1.Preparebit,reamer,bitbreaker,andBHA.

2.PU/MUBHAasfollows:

Bit+NBRR(withfloat+seat)+8-1/4″DC×2+reamer+8-1/4″DC×15+jar+8-1/4″DC×2+X.O+5″HWDP+5″DP

3.RIHandcheckstringinventory/depth.Recorddepthofcompression(thedepthofDVPKRorsomeremainedplug).Pressuretestw/waterto1500Psi(or300PsiasForemanrequired).DrillplugandDVPKRwiththeparameterasfollows:

20~30KLB,70RPMand80~90spmw/singlepump.

AfterdrillingoutofDV,pressuretestforcasingagain.

ContinueRIHtotagcementandchecktallytoconfirmdepthandrecordit.

Drillplugandaccessoriestill15′upperofFCandretest.

ContdrillingplugandFS,replacewaterw/mud.

4.AfterdrillingoutFSandcement,drill12-1/4″holewiththesameparametersthatdrillingtheplugtillreamerisoutofshoe.Thendrillwiththefollowingparameters:

45~50KLB,105~110RPMand65spmwithdoublepump.

5.12-1/4″section(2300~4100FT)isthemostcomplicatedintervalwhichincludedWASIAandSHUAIBA.

A.WASIAisawater-bearingformationandsomeshaleformationwillexpandafterabsorbingwaterfrom2600~3500FT.Usemudnotwatertodrillthissection.TheROPwillbeveryhighwit